HousePrecheckCheck an address

614 Brimley RdToronto · zoning, lot size and permit records

IPW (x9)34.2 × 70.7 m2,387 m²on Citadel Drcorner, also on Brimley Rd

Not a home

A place of worship

The zoning by-law sets this parcel aside for a place of worship. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A place of worshipParking and traffic around services, often at weekends.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N20 m
34.2 m frontage70.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (97% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (49% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (79% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Zoning review21 195454 ZPRClosed
    Aug 9, 2021 · 614 BRIMLEY RD
  • Zoning review21 118975 ZZUClosed
    Feb 22, 2021 · 614 BRIMLEY RD
  • Zoning review18 139604 LPRClosed
    Apr 6, 2018 · 614 BRIMLEY RD
  • Zoning review12 244604 ZPUClosed
    Sep 11, 2012 · 614 BRIMLEY RD
  • Zoning review04 106226 ZPUClosed
    Feb 2, 2004 · 614 BRIMLEY RD

Check before you build

  • Site-specific exception 900.34.10(9)

    Needs a closer look

    3 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.34.10(9)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The maximum height of an existing place of worship is the height of the existing building as it existed on the date of the enactment of this By-law

  2. Rule B

    The maximum lot coverage is the percentage of the lot area covered by buildings as they existed on the lot on the date of the enactment of this By-law

  3. Rule C

    The minimum building setback from a lot line is the building setback from each respective lot line to the main wall of the building s on the lot as they existed on the date of the enactment of this By-law.

By-law 569-2013, Chapter 900

Lot facts

Area
2,387 m²
Frontage
34.2 m
Depth
70.7 m
Street
Citadel Dr
Corner lot
Yes, also on Brimley Rd70.7 m along it
Public lane
None
House footprint
677 m²roof up to 12.1 m
Back yard
33.8 mhouse to rear lot line
Side yards
2.1 m and 8.9 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
33%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone IPW (x9) (Institutional Place of Worship). Chapter 80, section 80.50 of the by-law. Source

Around this lot

Minor variances approved
67%2 of 3 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
0

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Proposal to install back water valve

    106 CITADEL DR · Nov 16, 2026 · 170 m away
  • Building permit

    Proposed aluminum front porch roof cover and attached carport cover

    12 NERO CRT · Nov 3, 2026 · 258 m away
  • Building permitsecondary suite

    Proposal to construct basement secondary suite.

    118 CITADEL DR · Oct 26, 2026 · 101 m away
  • Zoning review

    Closed

    1 GRAYLEE AVE · Jul 10, 2026 · 109 m away
  • Zoning review

    Closed

    29 GRAYLEE AVE · Mar 12, 2026 · 269 m away
  • Building permitmultiplex, secondary suite

    Basement as a legal second unit (duplex)

    53 GULLY DR · Oct 15, 2025 · 158 m away
  • Building permitsecondary suite

    Proposal for interior alterations to create a second unit in the basement.

    20 GRAYLEE AVE · Sep 23, 2025 · 189 m away
  • Building permit

    Proposal extension of interior side yard (on main building) to accommodate new furnace and interior alterations - SEE 24 176167 PLB 00 PS and 24 176167 BLD 00 BA

    1 GRAYLEE AVE · Aug 29, 2025 · 109 m away
  • Building permit

    Change of use from SFD to Group A-2 occupancy (daycare with 40 children+7 staff) To demolish existing detached garage and propose driveway widening

    1 GRAYLEE AVE · Dec 16, 2024 · 109 m away
  • Building permitsecondary suite

    Interior alterations to existing dwelling, create a second suite in the basement with a walkout, front addition, front porch, rear and side addition.

    7 GRAYLEE AVE · Apr 3, 2024 · 145 m away

Neighbourhood: Bendale South

About the area around the lot, not the lot itself.

Nearest station
Kennedy Station25 min walk
Nearest TTC stop
Brimley Rd at Gully Dr South Side2 min walk
Nearest cycling route
Knob Hill Park TrlMulti-Use Trail - Entrance, 2 min walk
Nearest traffic count
19,924 vehicles in 14 hBrimley Rd / Citadel Dr, 60 m away, Oct 12, 2023
Serious collisions within 500 m
52021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 0 with cyclists
Parks
Knob Hill Park1 min walk
Trudelle Park8 min walk
Glen Ravine Park8 min walk

Schools within 1 km

  • KNOB HILL PUBLIC SCHOOL English Public 5 min walk
  • GLEN RAVINE JR PUBLIC SCHOOL English Public 9 min walk
  • HUNTER'S GLEN JR PUBLIC SCHOOL English Public 13 min walk
  • ST JOAN OF ARC CATHOLIC ACADEMY English Separate 13 min walk
  • ST ALBERT CATHOLIC ELEMENTARY SCHOOL English Separate 14 min walk
  • CHARLES GORDON SR PUBLIC SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBendale SouthMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home67%54%
Population (2021)10,72516,813
Homes built in 1960 or before54%29%
Homes needing major repairs9%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBendale SouthCity median
Assault684.6636.3
Robbery95.369.5
Shootings8.710.5
Auto theft294.7192.6
Theft over $5,0008.746.1
Break and enter78172.8
Theft from vehicles329.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.