HousePrecheckCheck an address

6120 Yonge StToronto · zoning, lot size and permit records

Also 6120A Yonge St, 6120B Yonge St

Commercial residential · CR 1.0 (c1.0; r1.0) SS3 (x2565)26.6 × 43.5 m1,070 m²on Yonge Stcorner, also on Centre Ave

Not a home

Alpha Quality Education School

The City's school locations place Alpha Quality Education School on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • 9 development applications open within 300 m, up to 16 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
N20 m
26.6 m frontage43.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 9 development applications open within 300 m

    Good to know

    9 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 16 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

11 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit15 129875Closed

    To erect and display one electronic illuminated wall sign.**BAROGUNPANG BAKERY**

    Dec 19, 2019 · 6120 YONGE ST
  • Building permit17 275748Closed

    Non-substantial alteration to an existing third party roof sign, seeking to reduce each of the two sign faces (in a v-shaped formation) from 10' x 40' to 10' x 35' (south-facing) and 10' x 20' (north-facing), each displaynig static copy, consistent with the 2000 issued permit.**DS ONLY** **Pattison Outdoor**

    Jan 15, 2018 · 6120 YONGE ST
  • Zoning review15 181483 LTOClosed
    Jun 26, 2015 · 6120 A YONGE ST
  • Zoning review14 207268 ZZUClosed
    Aug 15, 2014 · 6120 YONGE ST
  • Zoning review12 244030 ZPUClosed
    Sep 10, 2012 · 6120 YONGE ST
  • Zoning review11 173286 LTOClosed
    Apr 13, 2011 · 6120 YONGE ST
  • Zoning review08 188889 ZPUClosed
    Jul 31, 2008 · 6120 YONGE ST
  • Zoning review06 115300 LTOClosed
    Mar 7, 2006 · 6120 YONGE ST
Show 3 older records
  • Building permit06 110090Closed

    Interior alterations for the new grocery store (Manill Halal Meat)

    Feb 27, 2006 · 6120 YONGE ST
  • Zoning review03 190570 LTOClosed
    Nov 3, 2003 · 6120 YONGE ST
  • Zoning review02 177203 ZPUClosed
    Sep 30, 2002 · 6120 YONGE ST

Check before you build

  • Site-specific exception 900.11.10(2565)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2565)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Despite the parking space requirements in Chapter 200, parking spaces must be provided for each dwelling unit at a minimum rate of 1.5 parking spaces of which 0.25 parking spaces for each dwelling unit must be for visitor parking. Prevailing By-laws and Prevailing Sections: (None Apply)

  2. Older by-law A

    Despite the parking space requirements in Chapter 200, parking spaces must be provided for each dwelling unit at a minimum rate of 1.5 parking spaces of which 0.25 parking spaces for each dwelling unit must be for visitor parking. Prevailing By-laws and Prevailing Sections: (None Apply)

By-law 569-2013, Chapter 900

Lot facts

Area
1,070 m²
Frontage
26.6 m
Depth
43.5 m
Street
Yonge St
Corner lot
Yes, also on Centre Ave43.5 m along it
Public lane
None
House footprint
382 m²roof up to 16.7 m
Back yard
11.7 mhouse to rear lot line
Side yards
0 m and 6 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
10.5 m
Max lot coverage
33%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Yonge Street North Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR 1.0 (c1.0; r1.0) SS3 (x2565) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
95%18 of 19 decisions
Garden suite permits
5
Laneway suite permits
0
Multiplex permits
2
Development applications
16

Within 300 m, last 10 years. 7 suite and multiplex permits: more than at 67% of Toronto houses (median 3). 19 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To convert the existing ancillary building (3-car detached garage) at the rear of the property into a take-out pizza restaurant.

    6020-6022 YONGE ST · Oct 15, 2026 · 286 m away
  • Minor varianceApproved

    To permit revisions to the approved 13-storey mid-rise mixed-use development, and Specifically seek relief from the site-specific By-law No. 1037-2022 to increase height, number of residential units, gross floor area and reduce building set backs and vehicular parking rates. (the application was deferred from the hearing of 20 June 2024)

    6150 YONGE ST · Aug 1, 2024 · 62 m away
  • Minor varianceApproved

    To permit modifications of gross floor area, building height, and parking requirements for an approved mixed-use building.

    5995 YONGE ST · Jun 8, 2023 · 328 m away
  • Minor varianceApproved

    To permit revisions to the approved 13 storey mid-rise, mixed-use development on the subject site.

    6150 YONGE ST · Jun 8, 2023 · 62 m away
  • Minor varianceApproved

    To reduce the parking spaces required to allow a restaurant on ground floor (Unit #2).

    6174 YONGE ST · Apr 18, 2018 · 172 m away

Latest activity nearby

  • Zoning review

    Application On Hold

    6113-6115 YONGE ST · Nov 23, 2026 · 84 m away
  • Building permit

    Proposal for repairs to the level P1 of the underground parking garage

    6061 YONGE ST · Nov 17, 2026 · 181 m away
  • Building permit

    Interior alterations to 6005 Yonge Street, Unit A

    5999-6023 YONGE ST · Nov 12, 2026 · 293 m away
  • Building permit

    Proposal for interior alterations to convert art gallery to Cafe/Bakery.

    6118 YONGE ST · Nov 10, 2026 · 20 m away
  • Building permit

    Proposed interior alterations of the existing exchange office, oc. will remain as exiting.

    6113-6115 YONGE ST · Oct 27, 2026 · 84 m away
  • Building permit

    Proposal for interior alterations to a new restaurant and patron area, less than 30 seats for new tenant.Convenience address is 6017 Yonge St.

    5999-6023 YONGE ST · Oct 23, 2026 · 293 m away
  • Minor varianceApproved

    To convert the existing ancillary building (3-car detached garage) at the rear of the property into a take-out pizza restaurant.

    6020-6022 YONGE ST · Oct 15, 2026 · 286 m away
  • Building permitdemolition, garden suite

    Proposal to demolish existing building and construct a new three storey four unit detached dwelling and a rear garden suite.

    22 EVERINGHAM CRT · Oct 8, 2026 · 249 m away
  • Building permitgarden suite, multiplex, new building, new house

    Proposal to demolish existing building and construct a new three storey four unit detached dwelling and a rear garden suite.

    22 EVERINGHAM CRT · Oct 8, 2026 · 249 m away
  • Zoning review

    Closed

    6174 YONGE ST · Sep 18, 2026 · 172 m away

Neighbourhood: Newtonbrook West

About the area around the lot, not the lot itself.

Nearest station
Finch Station21 min walk
Nearest TTC stop
Yonge St at Patricia Ave2 min walk
Nearest cycling route
Newtonbrook Park TrlMulti-Use Trail - Connector, 10 min walk
Nearest traffic count
20,268 vehicles in 8 hYonge St / Centre Ave, 40 m away, Dec 14, 2021
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
Parks
Centre Park2 min walk
Goulding Park3 min walk
Newtonbrook Park10 min walk

Schools within 1 km

  • ALPHA QUALITY EDUCATION SCHOOL Private 1 min walk
  • DREWRY ACADEMY Private 8 min walk
  • CENTREPOINT LINC English Public 9 min walk
  • DREWRY SECONDARY SCHOOL English Public 9 min walk
  • NEWTONBROOK SECONDARY SCHOOL English Public 10 min walk
  • MONSEIGNEUR DE CHARBONNEL CATHOLIC SECONDARY SCHOOL French Separate 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNewtonbrook WestMedian neighbourhood
Median household income (2020)$79,000$84,500
Households that own their home50%54%
Population (2021)23,80516,813
Homes built in 1960 or before18%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNewtonbrook WestCity median
Assault710.6636.3
Robbery94.569.5
Auto theft442.2192.6
Theft over $5,00075.646.1
Break and enter192.8172.8
Theft from vehicles253.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.