HousePrecheckCheck an address

61 Scottfield DrToronto · zoning, lot size and permit records

Employment · E 0.743.1 × 121.9 m5,260 m²on Scottfield Dr

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelStill open in the City's records: 21 221167 (PROPOSED: Construction of a one storey shell building steel framed building with precas..., 2022, status Inspection); 21 220366 (Proposal to construct a retaining wall around the perimeter of an existing vacant lot, 2021, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
N50 m
43.1 m frontage121.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2021

    Needs a closer look

    Still open in the City's records: 21 221167 (PROPOSED: Construction of a one storey shell building steel framed building with precas..., 2022, status Inspection); 21 220366 (Proposal to construct a retaining wall around the perimeter of an existing vacant lot, 2021, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • Building permit21 221167Inspectionnew building

    PROPOSED: Construction of a one storey shell building steel framed building with precast panel walls.

    Feb 10, 2022 · 61 SCOTTFIELD DR
  • Building permit21 220366Permit Issued

    Proposal to construct a retaining wall around the perimeter of an existing vacant lot.

    Oct 25, 2021 · 61 SCOTTFIELD DR

Lot facts

Area
5,260 m²
Frontage
43.1 m
Depth
121.9 m
Street
Scottfield Dr
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • Zone E 0.7 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
100%2 of 2 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct (3) 1-storey industrial office buildings.

    5280 FINCH AVE E · Jul 24, 2024 · 326 m away
  • Minor varianceApproved

    To construct a 1-storey warehouse addition to the existing 1-storey industrial manufacturing building.

    5373 FINCH AVE E · May 1, 2024 · 331 m away

Latest activity nearby

  • Building permit

    To erect and display three non illuminated ground signs.***YEE HONG HOSPICE******SCARBOROUGH HEALTH NETWORK (SHN)***

    60 SCOTTFIELD DR · Aug 24, 2026 · 180 m away
  • Building permit

    Proposal for modifications to the existing wet sprinkler system for the protection of rack storage in an existing 1-storey building, installation of a double check detector assembly and a forward flow test header are part of this scope

    23 SCOTTFIELD DR · May 26, 2026 · 190 m away
  • Building permit

    Proposed interior alterations to basement level of existing long term care facility to create opening on foundation to allow connection with proposed new long term care home at 80 Scottfield Drive.

    60 SCOTTFIELD DR · Sep 9, 2025 · 180 m away
  • Building permit

    Proposal for installation of maglocks.

    60 SCOTTFIELD DR · Jun 17, 2025 · 180 m away
  • Building permitnew building

    Conditional Permit - Proposal to construct new 5 storey Long Term Care home with basement connection to existing long term care facility (60 Scottfield Dr)

    80 SCOTTFIELD DR · Feb 18, 2025 · 124 m away
  • Consent (lot split)Approved

    Consent to establish private easements for access, underground services and stormwater between 50 Scottfield Road, 60 Scottfield Road and 80 Scottfield Road. Cross Reference SPA Application No. 22 194893 ESC 23 SA. This is a Delegated Consent, there is no public hearing.

    80 SCOTTFIELD DR · Jun 5, 2024 · 124 m away
  • Building permit

    Temporary install tent 100x40 feet. Pole Tent covered with side wall on all sides. Details shown in attached drawing. Installation will be as per instructions stated in the attached drawing. Installation in open parking lot as per attached drawing plan of parking lot with all dimensions Erection date June 26; Removal date July 25

    5321 FINCH AVE E · Jun 26, 2023 · 222 m away
  • Minor varianceApproved

    To construct a 5 storey long term care.

    60 SCOTTFIELD DR · May 4, 2023 · 180 m away
  • Zoning review

    Closed

    80 SCOTTFIELD DR · Oct 11, 2022 · 124 m away
  • Development application

    Site Plan application for a 5-storey, 224 bed Long Term Care Home with accessory institutional and commercial space.

    80 SCOTTFIELD DR · Aug 23, 2022 · 129 m away · City file

Neighbourhood: Agincourt North

About the area around the lot, not the lot itself.

Nearest TTC stop
Finch Ave East at Scottfield Dr4 min walk
Nearest traffic count
12,463 vehicles in 8 hFinch Ave E / Tiffield Rd / Scottfield Dr, 250 m away, Jan 31, 2012
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Chartwell Park12 min walk
Richmond Park14 min walk

Schools within 1 km

  • ANSON S TAYLOR JR PUBLIC SCHOOL English Public 14 min walk
  • AGINCOURT INTERNATIONAL ACADEMY Private 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureAgincourt NorthMedian neighbourhood
Median household income (2020)$84,000$84,500
Households that own their home79%54%
Population (2021)27,54016,813
Homes built in 1960 or before4%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleAgincourt NorthCity median
Assault276.9636.3
Robbery106.869.5
Shootings6.710.5
Auto theft327192.6
Theft over $5,00053.446.1
Break and enter93.4172.8
Theft from vehicles106.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.