HousePrecheckCheck an address

61 Industry StToronto · zoning, lot size and permit records

≈ 105.5 × 61.2 m4,093 m²on Industry St

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelStill open in the City's records: 19 230752 (Proposed interior alterations to convert a portion of the existing industrial unit into..., 2020, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 105.5 m frontage≈ 61.2 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (100% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (100% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Building permit open since 2020

    Needs a closer look

    Still open in the City's records: 19 230752 (Proposed interior alterations to convert a portion of the existing industrial unit into..., 2020, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (100% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. A88/05EYK (To legalize and to maintain the existing building on the property, 2005); B41/04HY (To obtain consent to sever the land into two parts for the purpose of an addition to a lot, 2004).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit19 230752Inspection

    Proposed interior alterations to convert a portion of the existing industrial unit into a bakeshop/restaurant (licensed) with 40 seats - Caldense Bakery.

    Dec 10, 2020 · 61 INDUSTRY ST
  • Building permit16 123241Closed

    Proposal to install DVCA backflow preventor in existing building.

    Mar 8, 2016 · 61 INDUSTRY ST
  • Minor varianceA88/05EYKApproved

    To legalize and to maintain the existing building on the property.

    Feb 17, 2005 · 61 INDUSTRY ST
  • Zoning review05 101845 ZPRClosed
    Jan 12, 2005 · 61 INDUSTRY ST
  • Consent (lot split)B41/04HYApproved

    To obtain consent to sever the land into two parts for the purpose of an addition to a lot.

    Aug 10, 2004 · 61 INDUSTRY ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
4,093 m²
Frontage
105.5 mestimated, irregular lot
Depth
61.2 mestimated, irregular lot
Street
Industry St
Corner lot
No
Public lane
None
House footprint
2,032 m²roof up to 16.7 m
Back yard
2 mhouse to rear lot line
Side yards
4.3 m and 32.8 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: elm, american (55 cm), maple, norway (40 cm), maple, norway (29 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%2 of 2 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 2 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To permit the existing open-air outdoor storage facility.

    110 INDUSTRY ST · Sep 29, 2022 · 428 m away
  • Minor varianceApproved

    To construct a two-storey rear addition, a second storey addition above the existing dwelling with a second storey rear platform and to create a secondary suite.

    107 TRETHEWEY DR · Aug 27, 2020 · 289 m away
  • Minor varianceApproved

    To maintain the additional dwelling unit in the basement. The apartment building will contain a total of 12 dwelling units.

    96 TRETHEWEY DR · May 23, 2019 · 370 m away
  • Minor varianceApproved

    To construct a new detached dwelling with an attached garage.

    59 GREENBROOK DR · Mar 7, 2019 · 479 m away
  • Minor varianceApproved

    To construct a three-storey rear addition.

    10 BERTAL RD · Nov 9, 2017 · 225 m away

Latest activity nearby

  • Building permit

    Interior alterations to an existing one-storey F2 industrial building.

    88 INDUSTRY ST · Nov 16, 2026 · 269 m away
  • Zoning review

    Cancelled

    88 INDUSTRY ST · Jun 2, 2026 · 269 m away
  • Zoning review

    Closed

    88 INDUSTRY ST · May 11, 2026 · 269 m away
  • Zoning review

    Cancelled

    88 INDUSTRY ST · Apr 14, 2026 · 269 m away
  • Building permit

    Proposal for Electromagnetic Locking Device to be installed at EMSF Open office room 202 (door 202B) of maintenance building (EG-HMQ-003)

    85 INDUSTRY ST · Jul 15, 2025 · 297 m away
  • Building permit

    Proposal to construct a roof structure on top of existing porch.

    86 GREENBROOK DR · Jul 3, 2025 · 240 m away
  • Building permit

    3 Wall Signs

    74 INDUSTRY ST · Jun 4, 2025 · 116 m away
  • Building permit

    3 Wall Signs

    74 INDUSTRY ST · May 1, 2025 · 116 m away
  • Building permitnew building

    Proposal for a rear temerarory detached air supported structure for the purpose of storage space.

    85 INDUSTRY ST · Feb 18, 2025 · 297 m away
  • Building permit

    To construct a temporary structure in the parking lot of an industrial building. The purpose of this sprung structure is for additional storage space.

    85 INDUSTRY ST · Jul 30, 2024 · 297 m away

Neighbourhood: Beechborough-Greenbrook

About the area around the lot, not the lot itself.

Nearest station
Mount Dennis Station8 min walk
Nearest TTC stop
Industry St at Todd Baylis Blvd1 min walk
Nearest cycling route
Eglinton Ave W TrailMulti-Use Trail - Boulevard, 9 min walk
Nearest traffic count
8,852 vehicles in 8 hGreenbrook Dr / Trethewey Dr, 220 m away, Mar 1, 2023
Serious collisions within 500 m
62021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 1 with cyclists
Parks
North Keelesdale Park2 min walk
Trethewey Park East3 min walk
Coronation Park - York4 min walk

Schools within 1 km

  • DARUL ARQAM ISLAMIC ACADEMY SCHOOL Private 10 min walk
  • YORK MEMORIAL COLLEGIATE INSTITUTE (UNDER CONSTRUCTION) English Public 14 min walk
  • IMMACULATE CONCEPTION CATHOLIC ELEMENTARY SCHOOL English Separate 15 min walk
  • DENNIS AVENUE COMMUNITY SCHOOL (CLOSED LOCATION) English Public 15 min walk
  • CHARLES E WEBSTER JR PUBLIC SCHOOL English Public 15 min walk
  • KEELESDALE JR PUBLIC SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBeechborough-GreenbrookMedian neighbourhood
Median household income (2020)$62,400$84,500
Households that own their home34%54%
Population (2021)6,26016,813
Homes built in 1960 or before42%29%
Homes needing major repairs12%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBeechborough-GreenbrookCity median
Assault692.3636.3
Robbery148.369.5
Shootings12.410.5
Auto theft247.2192.6
Theft over $5,00037.146.1
Break and enter111.3172.8
Theft from vehicles148.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.