HousePrecheckCheck an address

61 Fairfax CresToronto · zoning, lot size and permit records

Institutional · I≈ 203.1 × 110.8 m16,061 m²on Fairfax Cres

Not a home

An institution

The zoning by-law sets this parcel aside for an institution. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • An institutionVisitors, traffic and parking in its busy hours.
  • Permits or applications open on this parcelRecent records on this lot: 26 220760 (Proposal to install maglock locking devices as per the electrical drawings, 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 mNew buildings may go up around here in the next years. More change nearby than at 91% of Toronto houses.
  • Major Transit Station Area: Warden (Subway)The City plans more homes around the station: good for transit, and more building over time.
N50 m
≈ 203.1 m frontage≈ 110.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 220760 (Proposal to install maglock locking devices as per the electrical drawings, 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A303/15SC (This application is for variances for a proposal to construct a four-storey building fo..., 2015).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

13 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 220760Permit Issued

    Proposal to install maglock locking devices as per the electrical drawings.

    Aug 18, 2026 · 61 FAIRFAX CRES
  • Building permit18 195481Closed

    REV 01 - Proposed revision to add 11 additional Electromagnetic Locks.install 10 maglocks within existing facility on 4 floors

    Aug 29, 2019 · 61 FAIRFAX CRES
  • Building permit15 261547Closednew building

    Rev 1 - Proposed revision to sprinkler system.Proposal to construct a four-storey building for a retirement and nursing home with a total of 229 units, including 178 rooms in the retirement home and 51 rooms in the nursing home. The facility will provide a mix of assisted and independent living units for seniors.

    Oct 11, 2018 · 61 FAIRFAX CRES
  • Minor varianceA303/15SCApproved

    This application is for variances for a proposal to construct a four-storey building for a retirement and nursing home with a total of 229 units, including 178 rooms in the retirement home and 51 rooms in the nursing home. The facility will provide a mix of assisted and independent living units for seniors.

    Oct 15, 2015 · 61 FAIRFAX CRES
  • Zoning review15 177093 PSPClosed
    Jun 23, 2015 · 61 FAIRFAX CRES
  • Development application15 177093 ESC 35 SAClosed

    Proposed four-storey 229-room building that would provide a mix of assisted and independent living units for seniors.

    Jun 19, 2015 · 61 FAIRFAX CRES
  • Building permit15 146312Closeddemolition

    Proposed demolition of an existing 2 storey long term care facility

    May 20, 2015 · 61 FAIRFAX CRES
  • Zoning review15 122704 ZPRClosed
    Mar 2, 2015 · 61 FAIRFAX CRES
Show 5 older records
  • Building permit12 146253Closed

    replace cooling tower on roof

    May 1, 2012 · 61 FAIRFAX CRES
  • Building permit11 252906Closed

    To install two new electromagnetic locks

    Aug 18, 2011 · 61 FAIRFAX CRES
  • Building permit11 123209Closed

    HVAC Chiller Replacement

    Mar 9, 2011 · 61 FAIRFAX CRES
  • Building permit09 175950Closed

    install backflow preventor in basement mechanical room

    Nov 18, 2009 · 61 FAIRFAX CRES
  • Building permit07 232724Closed

    installation of 5 maglocks

    Jun 15, 2007 · 61 FAIRFAX CRES

Lot facts

Area
16,061 m²
Frontage
203.1 mestimated, irregular lot
Depth
110.8 mestimated, irregular lot
Street
Fairfax Cres
Corner lot
No
Public lane
None
House footprint
4,571 m²
Back yard
29.8 mhouse to rear lot line
Side yards
10.2 m and 24.4 mhouse to side lot lines
Buildings on the lot
2house, garage, sheds
Max height
—
Max lot coverage
33%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Warden (Subway). The lot is inside the Warden (Subway) Major Transit Station Area approved by the Province (Site and Area Specific Policy 648). Source
  • Zone I (Institutional). Chapter 80, section 80.10 of the by-law. Source

Around this lot

Minor variances approved
100%5 of 5 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
7

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    This application is for variances for a proposal to construct a four-storey building for a retirement and nursing home with a total of 229 units, including 178 rooms in the retirement home and 51 rooms in the nursing home. The facility will provide a mix of assisted and independent living units for seniors.

    61 FAIRFAX CRES · Oct 15, 2015 · 36 m away
  • Minor varianceApproved

    To permit vehicle sales in conjunction with a vehicle service and repair garage.

    740 WARDEN AVE · Jul 11, 2013 · 204 m away
  • Minor varianceApproved

    The owners are proposing to build five one-storey buildings containing a total of 221 self-storage units on a site currently occupied by a one-storey industrial building that will continue to be used for a fitness club and a warehouse.

    750 WARDEN AVE · Aug 13, 2008 · 330 m away
  • Minor varianceApproved

    To permit a 462 square metres (4975 square foot) Place of Worship to remain within Units 10 and 11 of the multi-tenanted industrial building and to permit the Place of Worship with a reduced parking rate.

    746 WARDEN AVE · Jul 21, 2004 · 235 m away

Latest activity nearby

  • Minor variancePending

    To reduce the number of parking spaces and include medical centre to the range of uses on the ground floor of the Apartment building. There are no built form revisions. Cross-reference Site Plan Control Application 22 24108 ESC 20

    743 WARDEN AVE · Dec 2, 2026 · 273 m away
  • Building permit

    REV 01: Revision to permit, sprinkler drawing revision Proposed interior alterations to accommodate new nail salon.

    743 WARDEN AVE · Nov 4, 2026 · 273 m away
  • Zoning review

    Closed

    743 WARDEN AVE · Sep 22, 2026 · 273 m away
  • Building permit

    Proposal for site development (landscaping, grading, retaining wall) to accomodate 35-40 people during ceremony), pergola/shade structure.

    3276 ST CLAIR AVE E · Sep 17, 2026 · 200 m away
  • Building permit

    Proposal for interior alterations for new dental office - UNIT 2Convenience address is 735 Warden Ave

    725 WARDEN AVE · Sep 16, 2026 · 145 m away
  • Building permit

    Proposal to install maglock locking devices as per the electrical drawings.

    61 FAIRFAX CRES · Aug 18, 2026 · 36 m away
  • Building permit

    Proposal for a door widening at 3rd and 4th floors, B Wing

    3276 ST CLAIR AVE E · Jul 14, 2026 · 200 m away
  • Development application

    Draft Plan of Condominium for 211 units

    743 WARDEN AVE · Apr 14, 2026 · 258 m away · City file
  • Zoning review

    Closed

    77 MENDELSSOHN ST · Apr 7, 2026 · 216 m away
  • Building permit

    Proposal to repair exterior wall due to deterioration and water damage.

    10 MENDELSSOHN ST · Mar 20, 2026 · 217 m away

Neighbourhood: Clairlea-Birchmount

About the area around the lot, not the lot itself.

Nearest station
Warden Station9 min walk
Nearest TTC stop
Warden Ave at Fairfax Cres2 min walk
Nearest cycling route
Gus Harris TrlMulti-Use Trail, 7 min walk
Nearest traffic count
20,886 vehicles in 14 hWarden Ave / Deans Dr / Fairfax Cres, 120 m away, Sep 24, 2025
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Clairlea Park3 min walk
Warden Hilltop Community Centre Park4 min walk
Geco Park7 min walk

Schools within 1 km

  • SATEC AT W A PORTER COLLEGIATE INSTITUTE English Public 5 min walk
  • ST JOACHIM CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk
  • GENERAL BROCK PUBLIC SCHOOL English Public 13 min walk
  • OUR LADY OF FATIMA CATHOLIC ELEMENTARY SCHOOL English Separate 16 min walk
  • CLAIRLEA PUBLIC SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureClairlea-BirchmountMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home64%54%
Population (2021)26,84016,813
Homes built in 1960 or before39%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleClairlea-BirchmountCity median
Assault1303.8636.3
Robbery4969.5
Shootings9.810.5
Auto theft287.6192.6
Theft over $5,0008546.1
Break and enter189.5172.8
Theft from vehicles290.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.