HousePrecheckCheck an address

600 University AveToronto · zoning, lot size and permit records

Also 574 University Ave

Institutional · IH 8.0 (x23)83.5 × 108.2 m8,967 m²on Gerrard St Wcorner, also on University Ave

Not a home

A hospital

The zoning by-law sets this parcel aside for a hospital. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A hospital nearbyAmbulances and sirens, traffic and parking at shift changes; care and jobs close by.
  • Permits or applications open on this parcelRecent records on this lot: 26 272646 (Proposed interior alteration of the exisitng CATH Lab room on floor 16 of the building..., 2026); 26 239765 (Interior renovation project to update architectural finishes in the fourth floor ambula..., 2026); 26 177732 (Proposed interior alterations to level 10 of the existing Mount Sinai Hospital to creat..., 2026); and 5 more. Larger work can mean noise and trucks next door; read what each one is for.
  • 10 development applications open within 300 m, up to 64 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: Queens ParkThe City plans more homes around the station: good for transit, and more building over time.
N50 m
83.5 m frontage108.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 55 building permits open, the oldest since 2001

    Needs a closer look

    Still open in the City's records: 24 218398 (PROPOSED MAGLOCK DOOR PART OF RENOVATIONS ON LEVEL 2, 2024, status Permit Issued); 24 191872 (PROPOSAL FOR MAGLOCK INSTALLATION IN EMERGENCY DEPARTMENT, 2024, status Inspection); 24 136752 (Interior Alterations to Dentistry CBCT PAN & CEP Room (Mount Sinai Hospital), 2024, status Inspection); and 52 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 by-law investigation closed in the last two years

    Good to know

    Closed files (Property Standards): 26 228299 PRS 00 IR (Property Standards, 2026).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 272646 (Proposed interior alteration of the exisitng CATH Lab room on floor 16 of the building..., 2026); 26 239765 (Interior renovation project to update architectural finishes in the fourth floor ambula..., 2026); 26 177732 (Proposed interior alterations to level 10 of the existing Mount Sinai Hospital to creat..., 2026); and 5 more.

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. A0468/14TEY (To alter the existing hospital building (Mount Sinai Hospital) by constructing a one-st..., 2014); A538/01TO (Construct a mechanical penhouse having dimensions of 9.1 by metres and a height of 7.16..., 2001).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 10 development applications open within 300 m

    Good to know

    10 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 64 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

327 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 272646Permit Issued

    Proposed interior alteration of the exisitng CATH Lab room on floor 16 of the building and replacement of the existing equipment.

    Nov 25, 2026 · 600 UNIVERSITY AVE
  • Building permit26 239765Permit Issued

    Interior renovation project to update architectural finishes in the fourth floor ambulatory corridor. Architectural new works involve new rubber sheet flooring, painting and installing ceiling tiles. Demolition scope involves removal of existing floor and wall finishes, ceiling tiles and lights.

    Nov 10, 2026 · 600 UNIVERSITY AVE
  • By-law investigation26 228299 PRS 00 IRClosed

    Property Standards

    Aug 28, 2026 · 600 UNIVERSITY AVE
  • Building permit26 177732Inspection

    Proposed interior alterations to level 10 of the existing Mount Sinai Hospital to create two new medication rooms. Work includes interior demolition, new partitions, plumbing, HVAC and electrical service fit-out.

    Jun 19, 2026 · 600 UNIVERSITY AVE
  • Building permit25 233737Revision Issued

    Rev 01: The sprinkler feed to the L6 Pathology Lab has been revised to the current site condition. The lab is connected to the existing wet sprinkler zone # 126.The sprinkler riser schematic, plan view and calculations have been revised to reflect wet sprinkler system. Alterations to existing fire protection system for L6 pathology lab expansion project. The starting point for installation is L6 pathology lab pre-action sprinkler system. - 6th Floor

    Apr 17, 2026 · 600 UNIVERSITY AVE
  • Zoning review26 126423 LTOClosed
    Mar 9, 2026 · 600 UNIVERSITY AVE
  • Building permit26 107359Inspection

    Proposal to upgrade overhead wet sprinkler system on the 11th and 14th floor.

    Feb 17, 2026 · 600 UNIVERSITY AVE
  • Building permit26 113608Closed

    Proposal to install one (1) electromagnetic lock on the ninth floor.

    Feb 11, 2026 · 600 UNIVERSITY AVE
Show 192 older records
  • Building permit25 267238Cancelled

    Proposal to upgrade overhead wet sprinkler system on the 11th and 14th floor.

    Dec 17, 2025 · 600 UNIVERSITY AVE
  • Building permit25 221953Closed

    Proposed interior alterations for reno of exist. lab/office into office only. new partition scope & limited associated mep scope. no changes to structure and minor mods to existing sprinkler heads.

    Oct 20, 2025 · 600 UNIVERSITY AVE
  • Building permit25 199337Inspection

    Proposed interior alteration of the existing digital radiography x-ray rooms and replace existing x-ray equipment. Scope of work also includes new finishes, flooring and ceilings and replacement of existing hand sink. There is no sprinkler modifications.

    Aug 27, 2025 · 600 UNIVERSITY AVE
  • Building permit25 191753Inspection

    The project involves enlarging 3 medication rooms on Levels 11 &14 to accommodate larger medication dispensing and storage equipment. Adjacent office spaces will be incorporated into the expanded rooms. The scope includes minor associated mechanical and electrical modifications. No demolition of structural or life safety systems.

    Aug 21, 2025 · 600 UNIVERSITY AVE
  • Building permit25 191197Closed

    Mount Sinai Hospital - Level 6 - Morgue Transfer Door

    Aug 5, 2025 · 600 UNIVERSITY AVE
  • Building permit25 155236Closed

    Proposed interior alterations - Renovations to provide an expansion to the Oncology Department Offices on level 6.

    Jun 23, 2025 · 600 UNIVERSITY AVE
  • Building permit25 130950Closed

    Proposal for interior alterations at Mount Sinai Hospital - Isolation Operating Room.

    Apr 30, 2025 · 600 UNIVERSITY AVE
  • Building permit25 144392Closed

    1 wall sign**Miles Nadal Heart Centre**

    Apr 22, 2025 · 600 UNIVERSITY AVE
  • Building permit25 134726Closed

    Mount Sinai Hospital - Isolation Operating Room - Mag Lock Permit Application

    Mar 31, 2025 · 600 UNIVERSITY AVE
  • Building permit25 122979Closed

    mag lock installation for 2 elevator lobby doors at 19th floor 19de-murray elevators.total two (2) double doors will be installed with new mag lock for each door leaf

    Mar 4, 2025 · 600 UNIVERSITY AVE
  • Zoning review25 123236 ZPRClosed
    Feb 28, 2025 · 600 UNIVERSITY AVE
  • Building permit24 247786Inspection

    Proposal for interior alterations - expansion to the pathology lab on level 6.

    Feb 10, 2025 · 600 UNIVERSITY AVE
  • Building permit24 252506Approved

    THIS ALTERNATIVE SOLUTION WILL ADDRESS REMOVING THE FIRE HOSES IN THE EXISTING FIRE HOSE CABINETS AND RETAINING THE EXISTING 65 MM STANDPIPE SYSTEM HOSE VALVE CONNECTIONS.

    Dec 20, 2024 · 600 UNIVERSITY AVE
  • Building permit24 205883Closed

    Proposal for interior alteration of existing lab/office into office only, minor new partition. no changes to structure and 1 additional sprinkler head

    Oct 16, 2024 · 600 UNIVERSITY AVE
  • Building permit24 218398Permit Issued

    PROPOSED MAGLOCK DOOR PART OF RENOVATIONS ON LEVEL 2

    Oct 11, 2024 · 600 UNIVERSITY AVE
  • Building permit24 207610Closed

    Proposal for interior alterations for new medical equipment, partitions, finishes, lighting, electrical work, Hvac and sprinkler work in an existing Hospital - "MRgRT Suite"

    Oct 3, 2024 · 600 UNIVERSITY AVE
  • Building permit24 212986Closed

    Interior alterations to convert an existing open office space and an office room at Level 6 of the Hospital into 3 new office rooms for Pathologists. Work includes minor mechanical & electrical modifications. No demolition of structural or life safety systems

    Oct 1, 2024 · 600 UNIVERSITY AVE
  • Building permit24 217207Closed

    Renovation to existing communication station to develop new medication room, including modifications to existing HVAC, plumbing and electrical distribution

    Sep 27, 2024 · 600 UNIVERSITY AVE
  • Building permit24 193235Closed

    Proposal for interior alterations - Conversion of an existing office space at Level 2 of the Hospital into a lounge and locker space for the Emergency Dept. staff. Work includes associated minor mechanical & electrical modifications. No demolition of structural or life safety systems.

    Sep 19, 2024 · 600 UNIVERSITY AVE
  • Building permit24 212450Cancelled

    PROPOSED MAGLOCK DOOR PART OF RENOVATIONS ON LEVEL 2

    Sep 13, 2024 · 600 UNIVERSITY AVE
  • Zoning review24 203422 LTOClosed
    Aug 26, 2024 · 600 UNIVERSITY AVE
  • Building permit24 191872Inspection

    PROPOSAL FOR MAGLOCK INSTALLATION IN EMERGENCY DEPARTMENT

    Aug 6, 2024 · 600 UNIVERSITY AVE
  • Building permit24 136752Inspection

    Interior Alterations to Dentistry CBCT PAN & CEP Room (Mount Sinai Hospital)

    May 13, 2024 · 600 UNIVERSITY AVE
  • Building permit23 237643Closed

    Revision to add one more maglock and 1 new door on north east stair.PROPOSED: MAGLOCKS PART OF RENOVATIONS ON LEVEL 12. THERE ARE 9 LOCATIONS

    Apr 19, 2024 · 600 UNIVERSITY AVE
  • Building permit23 223016Closed

    Replace existing local HVAC pneumatic controls to electric DDC, replace inpatient unit with flooring replacements, painting, lighting, and headwalls, replace existing sprinkler zone valves

    Jan 15, 2024 · 600 UNIVERSITY AVE
  • Building permit23 217651Permit Issued

    Proposal to demolish two existing lab sinks and install new washer disinfector and floor drain.

    Dec 12, 2023 · 600 UNIVERSITY AVE
  • Building permit23 231111Cancelled

    Demolition of the existing sink in room 4-F5-6. Demolish the domestic hot and cold water pipe back to main and demolition of capping the drainage in the wall

    Nov 29, 2023 · 600 UNIVERSITY AVE
  • Building permit23 226942Closed

    install 1 first party wall sign

    Nov 29, 2023 · 600 UNIVERSITY AVE
  • Building permit23 216232Closed

    Proposing renovations to existing Vaults 2BMS024 and 2BMS025 and Control Rooms 2BMS021 and 2BMS027, to accommodate new medical treatment equipment on the second basement level.

    Nov 7, 2023 · 600 UNIVERSITY AVE
  • Zoning review23 195682 ZPRClosed
    Aug 30, 2023 · 600 UNIVERSITY AVE
  • Building permit23 170488Cancelled

    Proposal for interior alterations on levels 11 and 14 -Replace existing local HVAC pneumatic controls to electric DDC- Refresh inpatient unit with flooring replacements, painting, lighting, and headwalls- Replace existing sprinkler zone valves

    Jul 6, 2023 · 600 UNIVERSITY AVE
  • Building permit23 132588Closed

    Interior alterations to the existing 2 patient holding bays, existing office to be converted into patient bay, with an added sink and existing meeting room with new finishes, kitchenette to be relocated from corridor to within meeting room. Mt. Sinai Hospital - 16 Floor Cath Lab.

    Apr 26, 2023 · 600 UNIVERSITY AVE
  • Building permit22 241194Inspection

    Proposal for interior alterations to an existing hospital to create new reception and waiting area - Doviji Orthapaedic Sports Medicine Clinic, Mount Sinai Hospital

    Feb 3, 2023 · 600 UNIVERSITY AVE
  • Building permit20 105383Closed

    Revision - Demolition of the existing kitchen grease duct from level 2 to level 9, installation of a new NFPA 96 grease duct from level 2 to level 9 with associated architectural exterior wall details to accommodate the revised duct route. Phase 3A - Mount Sinai Hospital

    Jan 10, 2023 · 600 UNIVERSITY AVE
  • Building permit22 230348Closed

    Renovation of existing vault 2BMS001 and control room 2BMS002 to accommodate new medical treatment equipment.

    Jan 4, 2023 · 600 UNIVERSITY AVE
  • Building permit20 139129Closed

    Revision 2 - to magnetic locks in new L3 emergency dept east changed - removal of maglocks on stairwells, addition of two maglocks between x4 and x5 at Line xC. Removal of 5 maglocks in area of x5 and xB Revision - Remove one and add one. Reference gridlines xF between x3 and x4 for removed maglock and also xG between x4 and X5 for added maglock.Installation of 23 electromagnetic maglocks on level 3 for the emergency department area - 'Mount Sinai Hospital'

    Dec 20, 2022 · 600 UNIVERSITY AVE
  • Building permit22 131190Inspection

    Proposal for minor interior alterations to demolish an existing wall to enlarge space in the fan room and install two new exhaust fans on level 19 (floor 20).

    May 16, 2022 · 600 UNIVERSITY AVE
  • Building permit22 115665Closed

    Proposal to install SEVEN maglocks on Level 6 of an existing hospital - "Mount Sinai Hospital"

    Feb 25, 2022 · 600 UNIVERSITY AVE
  • Building permit21 216263Closed

    Proposal to install 27 maglocks on level 5 of existing hospital

    Sep 29, 2021 · 600 UNIVERSITY AVE
  • Building permit20 134995Closed

    REVISION #1: Update to maglock permit 20 134995 to match final installation after site changes 25 maglocks in total are present on Level 7install 25 maglocks on level 7 for new operating room area

    Jul 12, 2021 · 600 UNIVERSITY AVE
  • Building permit21 152146Closed

    Addition of magnetic lock on level 1 south doors located near gridline xM and X5 on single elevator lobby - Mount Sinai Hospital

    May 27, 2021 · 600 UNIVERSITY AVE
  • Building permit21 150536Closed

    Proposed installation of 2 maglocks in the TR-Tunnel for existing hospital

    May 14, 2021 · 600 UNIVERSITY AVE
  • Building permit20 224825Closed

    Proposal to install one maglock on the 18th floor of existing hospital "Mount Sinai hospital"

    Dec 16, 2020 · 600 UNIVERSITY AVE
  • Building permit19 212565Closed

    FS - Sprinkler Shop Drawing

    Jul 23, 2020 · 600 UNIVERSITY AVE
  • Building permit20 126883Permit Issued

    Alterations to existing sprinkler system under permit # 16 206077

    Jun 1, 2020 · 600 UNIVERSITY AVE
  • Building permit20 122550Inspection

    Interior renovations of room 18-125C on the 16th floor to install new kitchenette and resting area - Mount Sinai Hospital

    Mar 19, 2020 · 600 UNIVERSITY AVE
  • Building permit16 206077Cancelled

    Revision - to existing sprinkler system - Mount Sinai Hospital

    Dec 16, 2019 · 600 UNIVERSITY AVE
  • Building permit19 216242Permit Issued

    Proposed F5 Angiography suites fire sprinkler retrofit to conform to new layout and ceiling layout

    Oct 3, 2019 · 600 UNIVERSITY AVE
  • Building permit19 143610Closed

    Proposal for interior alterations for the temporary decant of hospital kitchen to allow for future kitchen renovation in an existing hospital - Phase 3, Level 2, "Mount Sinai Hospital"

    Jun 5, 2019 · 600 UNIVERSITY AVE
  • Building permit19 131735Closed

    Proposal to install 2 maglocks on Level 1 South of existing hospital. Door located near gridline xF between gridlines x1 and x2.

    Apr 3, 2019 · 600 UNIVERSITY AVE
  • Building permit19 109595Inspection

    Proposal for improvements on the 9th floor on psychiatric unit of staff and patient care and renewal of finishes to existing hospital. See previous permit 18-243538.

    Feb 8, 2019 · 600 UNIVERSITY AVE
  • Building permit18 197497Closed

    Rev 1 - Proposed revision to add 6 maglocks on 11th floor.Proposed installation of 3 electromagnetic locks on Level L-11 stairwells.

    Jan 29, 2019 · 600 UNIVERSITY AVE
  • Building permit18 243538Inspection

    Proposal for improvements on the 9th floor on psychiatric unit of staff and patient care and renewal of finishes to existing hospital

    Nov 13, 2018 · 600 UNIVERSITY AVE
  • Building permit18 214772Closed

    Proposed for 2 maglocks on level L-2 (2nd Floor) North

    Sep 17, 2018 · 600 UNIVERSITY AVE
  • Building permit18 196480Inspection

    Proposal to install total of 3 maglocks on level L-4 (4th floor).

    Aug 9, 2018 · 600 UNIVERSITY AVE
  • Building permit18 182190Closed

    Proposal to install 5 maglocks on level 1 of existing hospital.

    Jul 17, 2018 · 600 UNIVERSITY AVE
  • Building permit18 167571Closed

    Proposal to install 1 maglock on the 3rd floor

    Jun 25, 2018 · 600 UNIVERSITY AVE
  • Building permit18 140549Inspection

    Proposal for interior alterations to Angiography Radiology suites on the the 5th floor of existing hospital - "Mount Sinai Hospital"

    Jun 5, 2018 · 600 UNIVERSITY AVE
  • Building permit18 130468Closed

    Proposal to install total of 1 maglocks on level L15 (16th Floor) North in existing hospital

    Apr 12, 2018 · 600 UNIVERSITY AVE
  • Building permit18 136347Closed

    To erect and display one illuminated wall sign, displaying static copy located at the seventh, eighth and ninth storey's south elevation. This sign will identify "Miles Nadal Heart Centre" located within Mount Sinai Hospital. See associated Sign Variance Application No. 17-186367 (FP-17-00134).**MOUNT SINAI HOSPITAL**

    Apr 11, 2018 · 600 UNIVERSITY AVE
  • Building permit18 119416Closed

    Plumbing - Proposal for interior alterations of two existing laboratory rooms on the 8th floor of existing hospital

    Apr 5, 2018 · 600 UNIVERSITY AVE
  • Building permit18 124991Closed

    Proposal to install total of 6 maglocks on level 19/20th floor

    Mar 23, 2018 · 600 UNIVERSITY AVE
  • Building permit18 130349Closed

    Proposal to install total of 1 maglocks on level L2 (2nd Floor)

    Mar 16, 2018 · 600 UNIVERSITY AVE
  • Zoning review18 108277 ZSVClosed
    Jan 23, 2018 · 600 UNIVERSITY AVE
  • Zoning review17 263891 LPRClosed
    Nov 17, 2017 · 600 UNIVERSITY AVE
  • Building permit17 250899Closed

    PROPOSAL TO INSTALL TOTAL OF 6 MAGLOCKS ON LEVEL 12 SOUTH

    Nov 7, 2017 · 600 UNIVERSITY AVE
  • Zoning review17 242756 LTOClosed
    Oct 4, 2017 · 600 UNIVERSITY AVE
  • Building permit17 218554Closed

    Install one Kiosk for "freshly Squeezed "Juice take out in Unit 4 of retail food court.

    Aug 28, 2017 · 600 UNIVERSITY AVE
  • Zoning review17 186367 ZSVClosed
    Jun 23, 2017 · 600 UNIVERSITY AVE
  • Building permit17 116980Closed

    Revise existing sprinkler system in area of new MRI on second floor, install new pre-action sprinkler system to protect MRI room. Install one new fire hose cabinet.

    Mar 14, 2017 · 600 UNIVERSITY AVE
  • Building permit17 124373Closed

    Installation of one electromagnetic maglock on level 4 - Mount Sinai Hospital

    Mar 6, 2017 · 600 UNIVERSITY AVE
  • Zoning review17 117075 ZSVClosed
    Feb 15, 2017 · 600 UNIVERSITY AVE
  • Building permit16 269667Inspection

    PROPOSAL TO INSTALL 2 MAGLOCKS ON LEVEL 3

    Jan 19, 2017 · 600 UNIVERSITY AVE
  • Building permit16 239503Closed

    Proposal for interior alterations to the first level basement locker rooms to convert to an MRI suite in existing hospital - "Mount Sinai"

    Oct 26, 2016 · 600 UNIVERSITY AVE
  • Building permit16 235446Closed

    Removal of existing sprinkler piping and replacing with new pre-action system. Revising existing sprinkler locations off of wet system for the achritectural changes taking place

    Oct 19, 2016 · 600 UNIVERSITY AVE
  • Building permit16 222880Closed

    Proposal for interior alterations to the washrooms on the basement level of exsiting hospital - Mount Sinai Hospital

    Sep 29, 2016 · 600 UNIVERSITY AVE
  • Building permit16 210242Closed

    To erect and display three overhanging structure signs and one ground sign, all illuminated.**MOUNT SINAI**

    Sep 2, 2016 · 600 UNIVERSITY AVE
  • Building permit16 173895Closed

    Proposal for interior alterations on the ground floor of the exsiting hospital (Mount Sinai Hospital).

    Jul 25, 2016 · 600 UNIVERSITY AVE
  • Building permit16 174860Closed

    Proposed installation of one electromagnetic locking device on third floor - Mount Sinai Hospital

    Jul 20, 2016 · 600 UNIVERSITY AVE
  • Building permit14 151433Revision Issued

    Revision # 03 - To front entrance on the ground floor.Revision # 02 - To layout in the existing hospital at ground floor level only (cafeteria/food court area)Revision - Proposal for interior alterations to the ground floor lobby in existing hospital - "Mount Sinai"

    Apr 5, 2016 · 600 UNIVERSITY AVE
  • Building permit15 252953Closed

    Proposal to install 3 maglocks on level 3 of existing hospital - Mount Sinai Hospital

    Dec 11, 2015 · 600 UNIVERSITY AVE
  • Zoning review15 261899 LTOClosed
    Dec 8, 2015 · 600 UNIVERSITY AVE
  • Zoning review15 261814 ZMPClosed
    Dec 7, 2015 · 600 UNIVERSITY AVE
  • Zoning review15 259974 LTOClosed
    Dec 3, 2015 · 600 UNIVERSITY AVE
  • Zoning review15 256992 LTOClosed
    Nov 26, 2015 · 600 UNIVERSITY AVE
  • Building permit15 191334Cancelled

    Plumbing - Revision 01: the entrance to the concession is flipped (from left to right). Proposal for interior alterations to Unit #1 of the Food Hall Level 3 for new take out restaurant - "Aroma Cafe", Mount Sinai Hospital

    Nov 18, 2015 · 600 UNIVERSITY AVE
  • Zoning review15 241359 LTOClosed
    Oct 22, 2015 · 600 UNIVERSITY AVE
  • Building permit15 224231Inspection

    Proposal for interior alterations to main floor take out kiosk in an existing hospital - "U-Naru Sushi"

    Oct 22, 2015 · 600 UNIVERSITY AVE
  • Zoning review15 238685 ZPRClosed
    Oct 16, 2015 · 600 UNIVERSITY AVE
  • Building permit15 202625Inspection

    Alterations to unit 3E9-2 - King David Urban in the new food court of Mount Sinai Hospital

    Aug 26, 2015 · 600 UNIVERSITY AVE
  • Building permit15 205651Closed

    Proposal for interior alterations to main floor take out kiosk - no seating - - "Second Cup"

    Aug 21, 2015 · 600 UNIVERSITY AVE
  • Building permit15 192607Inspection

    Proposal for interior alterations to concession 2 & 3 for new take out restaurant "Me Va Me Kitchen Express" Scope of work includes installing a new kitchen exhaust system.

    Aug 5, 2015 · 600 UNIVERSITY AVE
  • Building permit15 181455Inspection

    Proposal to install 3 electromagnetic locks on Level 2.

    Jul 16, 2015 · 600 UNIVERSITY AVE
  • Building permit15 164278Inspection

    Proposal for interior alterations to level 20 in the existing hospital (Mount Sinai Hospital) for Mock-ups

    Jul 6, 2015 · 600 UNIVERSITY AVE
  • Building permit15 178275Closed

    Proposal for interior alterations to Level 3 takeout restaurant in existing hospital (Mount Sinai Hospital) - "The Chickery"

    Jun 30, 2015 · 600 UNIVERSITY AVE
  • Building permit15 179160Inspection

    Proposal for interior alterations to unit #6 on the ground floor for new take out restaurant - "Thai Express"

    Jun 30, 2015 · 600 UNIVERSITY AVE
  • Building permit15 136715Closed

    Proposal for interior alterations to unit 7 in the existing food court at Mount Sinai Hospital - Bar Burrito

    Apr 16, 2015 · 600 UNIVERSITY AVE
  • Building permit15 127287Inspection

    To install 1 Electromagnetic Lock at 15th floor.

    Apr 13, 2015 · 600 UNIVERSITY AVE
  • Building permit15 119930Inspection

    Proposal to install 4 electromagnetic locks, 2 on the 15th floor and 2 on the 17th floor, within "Mount Sinai Hospital".

    Mar 17, 2015 · 600 UNIVERSITY AVE
  • Building permit14 268621Inspection

    Proposal for interior alteration on the 14th floor of the existing Hospital.

    Jan 7, 2015 · 600 UNIVERSITY AVE
  • Building permit14 253637Permit Issued

    Proposal to install 2 electromagnetic locks on the 3rd floor, "Mount Sinai Hospital"

    Dec 15, 2014 · 600 UNIVERSITY AVE
  • Building permit14 236994Inspection

    Proposal to construct interior alterations to the 19th floor of the existing hospital. (Stage 2)

    Oct 22, 2014 · 600 UNIVERSITY AVE
  • Building permit14 231438Inspection

    Proposal for interior alterations on level 14 and 16 for the Womans and Infants Health Program, "Mount Sinai Hospital"

    Oct 6, 2014 · 600 UNIVERSITY AVE
  • Building permit14 209299Inspection

    Interior alterations to existing office space on the 19th floor within existing hospital. "Mount Sinai".

    Aug 25, 2014 · 600 UNIVERSITY AVE
  • Minor varianceA0468/14TEYApproved

    To alter the existing hospital building (Mount Sinai Hospital) by constructing a one-storey addition to the north east corner of the ground floor lobby.

    Jul 9, 2014 · 600 UNIVERSITY AVE
  • Building permit14 125476Inspection

    To complete interior alterations to the first floor unit 3-A8-1 for a tenant fit up for a Rexall store.

    May 6, 2014 · 600 UNIVERSITY AVE
  • Building permit14 147197Inspection

    Proposal for interior alterations to the 5th floor of existing Mount Sinai Hospital "Fluoroscopy" room 5-E11-4. Proposal includes HVAC.

    Apr 30, 2014 · 600 UNIVERSITY AVE
  • Building permit14 128006Closed

    Proposal to install 1 maglock on level B2 in the existing hospital.

    Apr 3, 2014 · 600 UNIVERSITY AVE
  • Zoning review14 135684 ZPRClosed
    Mar 31, 2014 · 600 UNIVERSITY AVE
  • Building permit14 114500Closed

    Plumbing - To complete interior alterations to the sixth floor of the existing "Mount Sinai" Hospital.

    Mar 18, 2014 · 600 UNIVERSITY AVE
  • Building permit13 271534Permit Issued

    Proposal for interior alterations to Hospital. Proposal includes replacement of domestic water riser.

    Dec 16, 2013 · 600 UNIVERSITY AVE
  • Building permit13 271547Approved

    Proposal for an alternate solution for use of 316 stainless steel for domestic cold water.

    Nov 28, 2013 · 600 UNIVERSITY AVE
  • Building permit13 181761Closed

    Proposal to install 3 maglocks on the 10th floor of existing hospital (Mount Sinai)

    Jul 3, 2013 · 600 UNIVERSITY AVE
  • Building permit12 154695Closed

    Proposed interior alteration to 8th floor laboratory. Mount Sinai Hospital.

    May 23, 2012 · 600 UNIVERSITY AVE
  • Building permit12 116846Closed

    Plumbing - permit for interior alterations to existing hospital space - floor 17 - Mount Sinai - Middle Section of floor. - Milk Bank

    Mar 16, 2012 · 600 UNIVERSITY AVE
  • Building permit11 318166Closed

    Proposal to install a total of 63 maglocks in existing Mount Sinai Hospital. Floor 19 - 1 maglock, floor 18 - 3 maglocks, floor 17 - 14 maglocks, floor 16 - 11 maglocks, floor 15 - 28 maglocks, , DECA floor 15 - 4 maglocks and floor 10 - 2 maglocks.

    Jan 12, 2012 · 600 UNIVERSITY AVE
  • Building permit11 314734Permit Issued

    Proposal to install sprinklers in existing generator room on Level 19 at Mount Sinai Hospital.

    Dec 20, 2011 · 600 UNIVERSITY AVE
  • Building permit11 272550Closed

    Plumbing - Proposal for interior alterations to 9th floor lab in Mount Sinai Hospital.

    Oct 24, 2011 · 600 UNIVERSITY AVE
  • Building permit11 288232Closed

    This is for interior alterations to the 11th floor, west portion of the floor. This is for a new interior layout. This is for Mount Sinai Hospital. Mount Sinai Hospital

    Oct 12, 2011 · 600 UNIVERSITY AVE
  • Building permit11 248397Closed - Dormant

    HVAC - Proposal for interior alterations to existing office/exam rooms on the 8th floor of Mount Sinai Hospital. - Samuel Lunenfeld Reaserch Institute.

    Sep 15, 2011 · 600 UNIVERSITY AVE
  • Building permit11 257962Inspection

    Interior alterations to existing lab rooms at Mount Inai Hospital. Level 8 Centre Core.

    Aug 19, 2011 · 600 UNIVERSITY AVE
  • Building permit11 205377Permit Issued

    HVAC - interior alteratiions to existing hospital space - floor 10 - North Tower. Link Area.

    Jul 15, 2011 · 600 UNIVERSITY AVE
  • Zoning review11 236362 ZPRClosed
    Jul 12, 2011 · 600 UNIVERSITY AVE
  • Building permit11 205442Closed

    interior alteratiions to existing hospital space - floor 9 - North West tower of floor 9

    Jun 8, 2011 · 600 UNIVERSITY AVE
  • Building permit11 184463Closed

    Proposal for interior alterations to existing laboratory on the 9th floor of Mount Sinai Hospital. - Roth Geonomics Laboratory, Samuel Lunenfeld Reaserch Institute.

    May 17, 2011 · 600 UNIVERSITY AVE
  • Building permit10 300734Inspection

    Proposal to install 2 maglocks on level 5 of Mount Sinai Hospital.

    Dec 16, 2010 · 600 UNIVERSITY AVE
  • Building permit10 295898Cancelled

    Sprinkler upgrade to portions of Bldg associated with Bldg Permit # 10 251024, 5 levels. Note to Examiner: Fees should be for 740 m2 of sprinkler upgrade. not 7 m2.

    Nov 12, 2010 · 600 UNIVERSITY AVE
  • Building permit10 251024Inspection

    Proposal for interior alterations to level 5 for the removal and replacement of 2 existing MRI units located at Mount Sinai Hospital.

    Oct 1, 2010 · 600 UNIVERSITY AVE
  • Building permit10 227106Inspection

    Proposal for interior alterations to level 6 diagnostic laboratory for Mount Sinai Hospital (480m2).

    Sep 8, 2010 · 600 UNIVERSITY AVE
  • Building permit10 221087Inspection

    permit for interior alterations to existing hospital lab - level 8 - 3 labs on South east Corner of Floor 8 - Mount Sinai

    Jul 21, 2010 · 600 UNIVERSITY AVE
  • Building permit09 179600Inspection

    Interior alterations to fit out new addition floors 10, 11, 15-20. See Building permit for Shell addition 06 - 169193 BLD - PLEASE REVIEW PLANS IN CONJUNCTION WITH 700 UNIVERSITY - 09 179604 BLD ALL DRAWINGS STAMPED WITH THIS NUMBER

    Dec 9, 2009 · 600 UNIVERSITY AVE
  • Building permit09 187594Closed

    Proposal to install two electromagnetic locks on level 3

    Dec 7, 2009 · 600 UNIVERSITY AVE
  • Building permit09 190521Inspection

    Minor interior alterations to retail unit on ground floor of Mount Sinai Hospital. Unit #3-D7-3. Tenant - "New Balance".

    Dec 1, 2009 · 600 UNIVERSITY AVE
  • Building permit09 157397Closed

    Installation of one(1) maglock on the 5th floor for Mount Sinai Hospital in room 5-A11 which is a storage room.

    Sep 8, 2009 · 600 UNIVERSITY AVE
  • Building permit09 147777Inspection

    Proposal for interior alterations to 5th floor office/examination space at Mount Sinai Hospital. (Same Day Admission)

    Jul 27, 2009 · 600 UNIVERSITY AVE
  • Building permit09 126380Closed

    Plumbing - Proposal for interior interior alterations to Mount Sinai Hospital part of the 8 th floor towards the south portion of the floor near the middle of the floor. The interior alterations are for the rooms labeled as the Equipment room(8-E3-1), the Imaging 1 room(8-F4-1) and the Kenichi system room (8-E4-1). This proposal includes HVAC and Plumbing

    May 4, 2009 · 600 UNIVERSITY AVE
  • Building permit08 218044Closed - Dormant

    HVAC - Proposal for interior alterations to 8th floor research labs of Mount Sinai Hospital (203.4m2).

    Dec 16, 2008 · 600 UNIVERSITY AVE
  • Zoning review08 219749 LTOClosed
    Nov 6, 2008 · 600 UNIVERSITY AVE
  • Building permit08 202468Closed

    HVAC - interior alterations to existing hospital area - part of Level 9 - Proteomics / robotics Lab

    Oct 23, 2008 · 600 UNIVERSITY AVE
  • Building permit08 191728Closed - Dormant

    HVAC - Proposal for interior alterations to 8th floor research labs of Mount Sinai Hospital (554.6m2).

    Sep 18, 2008 · 600 UNIVERSITY AVE
  • Building permit08 189218Closed

    Proposal to install 1 mag lock on the ground floor (retail unit). Unit 3-A8-1.

    Aug 27, 2008 · 600 UNIVERSITY AVE
  • Building permit08 172389Closed

    Interior alterations to fit out existing GF office space into new retail pharmacy 'Rexall'. Mount Sinai Hospital

    Jul 28, 2008 · 600 UNIVERSITY AVE
  • Building permit08 113707Closed - Dormant

    HVAC - Interior alterations to portions of lower plenum ceiling space of Level 1, Level 2, 3, 4, 5, 6, and 7 to accommodate new duct for future ;Enwave' water chiller. Install 4-16" Pipe for future water chiller.

    Apr 11, 2008 · 600 UNIVERSITY AVE
  • Building permit07 286401Inspection

    Interior alterations to existing hospital space - level 4 (sonshine freeman center)

    Dec 17, 2007 · 600 UNIVERSITY AVE
  • Building permit07 248215Inspection

    Interior alterations to existing hospital space - level 4 (social work and Ortho Dept renovation) No TFS required.

    Aug 8, 2007 · 600 UNIVERSITY AVE
  • Building permit07 190371Closed - Dormant

    HVAC - Make interior alterations to lobby of Mount Sinai hospital.

    Jul 5, 2007 · 600 UNIVERSITY AVE
  • Building permit06 169193Revision Issued

    Revise window size on each floor.

    May 30, 2007 · 600 UNIVERSITY AVE
  • Building permit07 201133Inspection

    Minor interior alterations and replacement of duct work level 2. "Mount Sinai Hospital". No TFS req'd

    May 18, 2007 · 600 UNIVERSITY AVE
  • Building permit06 190819Closed

    1 maglock on 13th floor

    Dec 1, 2006 · 600 UNIVERSITY AVE
  • Building permit06 183693Closed - Dormant

    HVAC - Interior alterations to existing hospital on level 3

    Nov 17, 2006 · 600 UNIVERSITY AVE
  • Building permit06 183318Closed - Dormant

    HVAC - Proposed interior alterations to OBGYN examination room on 5th floor.

    Nov 17, 2006 · 600 UNIVERSITY AVE
  • Building permit06 175956Closed - Dormant

    HVAC - Interior alterations to part of level 13 in an existing hospital

    Oct 16, 2006 · 600 UNIVERSITY AVE
  • Building permit06 152295Closed

    Proposal to install 2 maglocks on Level 3.

    Jul 26, 2006 · 600 UNIVERSITY AVE
  • Building permit06 152288Closed

    Proposal to install1 maglock on Level 2.

    Jul 26, 2006 · 600 UNIVERSITY AVE
  • Building permit06 133335Closed

    Plumbing - Interior alteration to Pharmacy on Level 3 of Mount Sinai Hospital - Interior Alterations

    May 23, 2006 · 600 UNIVERSITY AVE
  • Building permit06 121061Closed

    To install 5 new maglocks on level 5

    Apr 13, 2006 · 600 UNIVERSITY AVE
  • Building permit05 211025Closed - Dormant

    HVAC - Interior alterations to an existing hospital on the 4th floor - Interior Alterations

    Jan 3, 2006 · 600 UNIVERSITY AVE
  • Building permit05 210632Closed - Dormant

    HVAC - Interior alterations to part of Level 2, new laboratory - Interior Alterations

    Jan 3, 2006 · 600 UNIVERSITY AVE
  • Building permit05 165639Closed - Dormant

    Plumbing - Make interior alterations to portions of Level-8. - Interior Alterations

    Aug 12, 2005 · 600 UNIVERSITY AVE
  • Building permit05 163490Inspection

    Remove portion of sprinklers on the 2nd floor of the "Transformer Vault"

    Aug 11, 2005 · 600 UNIVERSITY AVE
  • Building permit05 160080Closed

    Make interior alterations to part of 10th floor in existing hosptial. "Mount Sinai Hospital"

    Jul 27, 2005 · 600 UNIVERSITY AVE
  • Building permit05 143295Closed - Dormant

    HVAC - Interior alterations to main floor pharmacy (Level 3). Mt Sinai Hospital - Interior Alterations

    Jun 28, 2005 · 600 UNIVERSITY AVE
  • Building permit05 136096Closed

    HVAC - Interior alterations to 6th floor for Rapid Response Lab - Interior Alterations

    Jun 9, 2005 · 600 UNIVERSITY AVE
  • Building permit05 139232Cancelled

    New sprinkler head location on part of 6th floor. Refer to building permit 05-136096

    Jun 6, 2005 · 600 UNIVERSITY AVE
  • Building permit05 117396Closed

    Interior alterations to create a new retail spacein an existing retail space. indigo

    Apr 12, 2005 · 600 UNIVERSITY AVE
  • Building permit05 109967Inspection

    Make interior alterations to portion of the 17th floor for simulator room.

    Mar 2, 2005 · 600 UNIVERSITY AVE
  • Building permit05 105342Closed - Dormant

    HVAC - Interior alterations to existing floor area (Partitioins) - Interior Alterations

    Feb 7, 2005 · 600 UNIVERSITY AVE
  • Building permit05 106460Inspection

    Install 4 maglocks on level 5

    Feb 3, 2005 · 600 UNIVERSITY AVE
  • Building permit04 179013Closed

    HVAC - Interior alterations to portion of level - 5 (Digital Imaging) - Interior Alterations

    Jan 20, 2005 · 600 UNIVERSITY AVE
  • Building permit04 203270Inspection

    HVAC - interior alterations to the 7th level. - Interior Alterations

    Jan 6, 2005 · 600 UNIVERSITY AVE
  • Building permit04 171976Closed

    Install sprinklers on the 19th floor. Existing and proposed: Hospital (Mount Sinai Hospital).

    Sep 15, 2004 · 600 UNIVERSITY AVE
  • Building permit04 168743Closed

    Plumbing - Interior alterations to portions of level 7 . exisitng - hospital - Interior Alterations

    Sep 15, 2004 · 600 UNIVERSITY AVE
  • Building permit04 167901Inspection

    Plumbing - Make interior alterations to portion of the 17th floor. Existing and proposed: Hospital (Mount Sinai Hospital). - Interior Alterations

    Sep 15, 2004 · 600 UNIVERSITY AVE
  • Building permit04 163651Closed - Dormant

    HVAC - Make interior alterations to portion of the 7th floor .Existing and proposed: Hospital. - Interior Alterations

    Aug 11, 2004 · 600 UNIVERSITY AVE
  • Building permit04 152605Inspection

    HVAC - Make interior alterations to portion of the 9th floor of Mount Sinai Hospital. Existing and proposed: Hospital. - Interior Alterations

    Jul 14, 2004 · 600 UNIVERSITY AVE
  • Building permit04 154458Closed

    Install 2 maglocks on 1st floor, 2 maglocks on 2nd floor, 11 maglocks on 3rd floor, 2 maglocks on 5th floor, 6 maglocks on 7th floor and 3 maglocks on 10th floor.

    Jul 8, 2004 · 600 UNIVERSITY AVE
  • Building permit04 147756Inspection

    Plumbing -Install new fixtures. Interior Alterations on 5th floor for mountsinai hospital. - Interior Alterations

    Jun 25, 2004 · 600 UNIVERSITY AVE
  • Building permit04 115567Closed

    HVAC - Build duct shaft on South side and construct steel support structure on the roof of 8 storey portion. - Other(BA)

    Jun 17, 2004 · 600 UNIVERSITY AVE
  • Building permit04 134398Closed

    Plumbing - Interior alterations to Part of Level 10 - Interior Alterations

    Jun 17, 2004 · 600 UNIVERSITY AVE
  • Building permit04 129355Closed - Dormant

    HVAC - Make alterations to portions of level 3 and level 16 for waiting and isolation rooms. - Interior Alterations

    Jun 17, 2004 · 600 UNIVERSITY AVE
  • Building permit04 145706Closed

    Interior alterations to level 17 ICU for an infection control upgrade

    Jun 15, 2004 · 600 UNIVERSITY AVE
  • Building permit04 127002Closed - Dormant

    HVAC - Interior alterations to mount sinai hospital on the 8th floor. - Interior Alterations

    May 5, 2004 · 600 UNIVERSITY AVE
  • Building permit04 126986Inspection

    HVAC -Alt havac unit. New interior alterations to mount sinai hospital on the 15 floor. - Interior Alterations

    May 5, 2004 · 600 UNIVERSITY AVE
  • Building permit03 201453Inspection

    Fire code retrofit (Sprinklers upgrade and additions)existing and proposed - hospital

    Jan 12, 2004 · 600 UNIVERSITY AVE
  • Zoning review03 199130 ZSVClosed
    Dec 9, 2003 · 600 UNIVERSITY AVE
  • Building permit03 192841Closed

    Relocate sprinklers on the 2B level.

    Nov 21, 2003 · 600 UNIVERSITY AVE
  • Building permit03 185744Closed

    install sprinkler system on part of level 4 in connection with bldg Permit #03-176104

    Oct 27, 2003 · 600 UNIVERSITY AVE
  • Zoning review03 187943 ZPRClosed
    Oct 23, 2003 · 600 UNIVERSITY AVE
  • Building permit03 176104Closed

    make interior alterations on portion of level 4 (Dentistry)

    Sep 25, 2003 · 600 UNIVERSITY AVE
  • Building permit03 167389Closed

    Make interior alterations to part of level 12. Area of work will be used as patient rooms.

    Sep 23, 2003 · 600 UNIVERSITY AVE
  • Building permit03 173884Closed

    Make interior alterations (partitions & finishes) to level 2B for office administration (Princess Margaret Hospital).

    Sep 19, 2003 · 600 UNIVERSITY AVE
  • Building permit03 128612Closed

    install sprinklers to mechanical room on level 14(15th fl) of existing Mount Sinai Hospital. "APPLICANT TO PAY $181.86 FOR THIS PERMIT"

    Jun 25, 2003 · 600 UNIVERSITY AVE

Showing the latest 200 of 327 records.

Check before you build

  • Site-specific exception 900.31.10(23)

    Needs a closer look

    1 site-specific rule and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.31.10(23)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    On a lot , public parking as a principal use in a building or structure is not permitted. [TO: 438-86; 12(2) 132]

  2. Older by-law A

    Section 12(2) 256 of former City of Toronto By-law 438-86

  3. Older by-law B

    City of Toronto by-law 593-06

1 part for other addresses
  • C On 610 University Ave., former City of Toronto by-law 326-92. © City of Toronto 1998-2026
By-law 569-2013, Chapter 900

Lot facts

Area
8,967 m²
Frontage
83.5 m
Depth
108.2 m
Street
Gerrard St W
Corner lot
Yes, also on University Ave108.2 m along it
Public lane
None
House footprint
6,771 m²roof up to 96.8 m
Back yard
7.1 mhouse to rear lot line
Side yards
0.4 m and 6.1 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
76 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Queens Park. The lot is inside the Queens Park Major Transit Station Area approved by the Province (Site and Area Specific Policy 611). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone IH 8.0 (x23) (Institutional Hospital). Chapter 80, section 80.20 of the by-law. Source
  • 5 City trees in front of this lot. The City's street tree inventory lists 5 trees at this address: apple, sargents (42 cm), apple, sargents (36 cm), serviceberry (9 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%12 of 12 decisions
Garden suite permits
0
Laneway suite permits
2
Multiplex permits
0
Development applications
21

Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 12 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing hospital building (Mount Sinai Hospital) by constructing a one-storey addition to the north east corner of the ground floor lobby.

    600 UNIVERSITY AVE · Jul 9, 2014 · 15 m away

Latest activity nearby

  • Building permit

    Proposed installation of one (1) electromagnetic lock on the shopping concourse level.

    700 UNIVERSITY AVE · Nov 25, 2026 · 188 m away
  • Building permit

    Proposed interior alteration of the exisitng CATH Lab room on floor 16 of the building and replacement of the existing equipment.

    600 UNIVERSITY AVE · Nov 25, 2026 · 15 m away
  • Building permit

    Proposal for three new maglocks: Double doors 7-A27E and 76ST2

    170 ELIZABETH ST · Nov 25, 2026 · 295 m away
  • Zoning review

    Application On Hold

    522 UNIVERSITY AVE · Nov 24, 2026 · 185 m away
  • Building permit

    Proposal for interior fit-out of new office space in existing office space.

    700 UNIVERSITY AVE · Nov 23, 2026 · 188 m away
  • Building permit

    Revision No.1: To change Occupancy Type to B1, No new constructionProposal for interior renovation to room 7A refresh mental health pod - 2hr rating and door/hardware replacement, 1 new toilet and 1 fire damper

    170 ELIZABETH ST · Nov 18, 2026 · 295 m away
  • Building permit

    Interior renovation project to update architectural finishes in the fourth floor ambulatory corridor. Architectural new works involve new rubber sheet flooring, painting and installing ceiling tiles. Demolition scope involves removal of existing floor and wall finishes, ceiling tiles and lights.

    600 UNIVERSITY AVE · Nov 10, 2026 · 15 m away
  • Zoning review

    Not Started

    300 SIMCOE ST · Nov 6, 2026 · 149 m away
  • Building permit

    Interior fit-out of new office space to existing Group D occupancy on 16th floor.

    700 UNIVERSITY AVE · Nov 6, 2026 · 188 m away
  • Building permit

    Mechanical retrofit to improve building energy efficiency including working in various building mechanical rooms and roofs on the chilled water, heating water, and glycol piping networks. Some new equipment will be installed including a an air source heat pump, heat recovery chiller, and fan coil units.

    500 UNIVERSITY AVE · Nov 5, 2026 · 243 m away

Neighbourhood: Kensington-Chinatown

About the area around the lot, not the lot itself.

Nearest station
Queen's Park Station4 min walk
Nearest TTC stop
University Ave at Gerrard St West1 min walk
Nearest cycling route
University AveCycle Track, 1 min walk
Nearest traffic count
23,801 vehicles in 14 hUniversity Ave / Gerrard St W, 70 m away, Jun 25, 2025
Serious collisions within 500 m
52021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 2 with cyclists
Parks
McCaul - Orde Parkette2 min walk
Gallery Park5 min walk
College Park8 min walk

Schools within 1 km

  • ORDE STREET JR PUBLIC SCHOOL English Public 3 min walk
  • RONALD MCDONALD HOUSE Private 4 min walk
  • CORNERSTONE PREPARATORY SCHOOL - MAIN CAMPUS Private 6 min walk
  • OCAD UNIVERSITY - ROSALIE SHARP PAVILION University 6 min walk
  • OCAD UNIVERSITY - ANNEX BUILDING University 6 min walk
  • CONTACT ALTERNATIVE SCHOOL English Public 7 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureKensington-ChinatownMedian neighbourhood
Median household income (2020)$62,000$84,500
Households that own their home32%54%
Population (2021)18,12016,813
Homes built in 1960 or before26%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleKensington-ChinatownCity median
Assault2017.5636.3
Robbery19369.5
Shootings21.910.5
Auto theft118.4192.6
Theft over $5,000219.346.1
Break and enter443172.8
Theft from vehicles850.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.