HousePrecheckCheck an address

600 Eglinton Ave EToronto · zoning, lot size and permit records

Commercial residential · CR 2.5 (c2.0; r2.5) SS2 (x2208)32.9 × 42.7 m1,404 m²on Eglinton Ave Ebacks onto Ln N Eglinton E Bruce Park

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelRecent records on this lot: 25 213568 (Proposal for relocation of wall in 5th floor gym area and enclose existing storage, 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 22 development applications open within 300 m, up to 46 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: LeasideThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
32.9 m frontage42.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2017

    Needs a closer look

    Still open in the City's records: 17 155737 (Proposal to demolish existing fence and exterior landscape retaining wall and construct..., 2017, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 213568 (Proposal for relocation of wall in 5th floor gym area and enclose existing storage, 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 22 development applications open within 300 m

    Good to know

    22 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 46 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Building permit25 213568Inspection

    Proposal for relocation of wall in 5th floor gym area and enclose existing storage

    Oct 10, 2025 · 600 EGLINTON AVE E
  • Building permit17 155737Inspection

    Proposal to demolish existing fence and exterior landscape retaining wall and construct new screen, low walls, and re clad columns.

    May 30, 2017 · 600 EGLINTON AVE E
  • Building permit11 239291Closed

    Proposal to install a back flow preventor in exiting apartment building.

    Aug 5, 2011 · 600 EGLINTON AVE E
  • Building permit97 025320Closed

    MAKE INTERIOR ALTERATIONS TO A PORTION OF THE FIRST FLOOR RETAIL AREA FOR 2 ADDITIONAL DWELLING UNITS. ALSO ALTER FRONT ELEVATION. SEE C. OF A DECISION /LM

    Feb 9, 1998 · 600 EGLINTON AVE E

Check before you build

  • Site-specific exception 900.11.10(2208)

    Needs a closer look

    3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2208)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(2) 118 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(2) 119 of former City of Toronto By-law 438-86

  3. Older by-law C

    Section 12(2) 270(a) of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
1,404 m²
Frontage
32.9 m
Depth
42.7 m
Street
Eglinton Ave E
Corner lot
No
Public lane
Ln N Eglinton E Bruce Park, 32 m along it
Max height
18 m
Max lot coverage
—
  • Major Transit Station Area: Leaside. The lot is inside the Leaside Major Transit Station Area approved by the Province (Site and Area Specific Policy 681). Source
  • Yonge-Eglinton Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone CR 2.5 (c2.0; r2.5) SS2 (x2208) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: elm, siberian (32 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
90%46 of 51 decisions
Garden suite permits
4
Laneway suite permits
0
Multiplex permits
7
Development applications
32

Within 300 m, last 10 years. 11 suite and multiplex permits: more than at 77% of Toronto houses (median 3). 51 variance decisions: more than at 86% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    The proposal seeks approval for a 47 storey mixed-use residential building, refinements to the approved development concept, include an increase in height, adjustments to the tower massing, and design.

    589 EGLINTON AVE E · Sep 17, 2026 · 94 m away
  • Minor varianceApproved

    To alter the development standards (as approved by Site-Specific Zoning By-law No. 109-2025(OLT)) to permit the proposed 37-storey mixed use building with 489 residential units and ground floor retail space. The related Site Plan application (File No. 22 177065 NNY 15 SA) is currently under review.

    2 GLAZEBROOK AVE · Feb 5, 2026 · 285 m away
  • Minor varianceApproved

    To alter the previously approved 9-storey mixed-use building, which is currently under construction. The variances are being requested to allow for a 0.3 metre increase in building height, to alter the permitted location of functional building elements on the roof and to reduce the supply of visitor parking. Cross-reference City of Toronto By-law No. 1184-2022 (Ontario Land Tribunal).

    1710 BAYVIEW AVE · Mar 6, 2025 · 277 m away
  • Minor varianceApproved

    Proposal to increase the maximum gross floor area and height of the buildings

    1837 BAYVIEW AVE · Jul 18, 2024 · 308 m away
  • Minor varianceApproved

    Proposal for rear addition and interior alterations to convert commercial/residential to commercial only - medical office.

    1709 BAYVIEW AVE · Oct 20, 2022 · 409 m away

Latest activity nearby

  • Building permit

    Shoring and excavation for remediation purposes

    1802 BAYVIEW AVE · Nov 12, 2026 · 174 m away
  • Building permit

    Proposed repairs to rear portion of existing dwelling due to water damage

    573 ROEHAMPTON AVE · Nov 5, 2026 · 101 m away
  • Building permitnew building, new house, secondary suite

    Proposal to demolish existing house and construct a new two-storey, two-unit detached dwelling with an attached garage.

    134 BANFF RD · Oct 26, 2026 · 299 m away
  • Building permitgarden suite

    Proposal for a 2-storey garden suite

    608 SOUDAN AVE · Sep 24, 2026 · 297 m away
  • Zoning review

    Notice Sent

    1720 BAYVIEW AVE · Sep 21, 2026 · 243 m away
  • Minor varianceApproved

    The proposal seeks approval for a 47 storey mixed-use residential building, refinements to the approved development concept, include an increase in height, adjustments to the tower massing, and design.

    589 EGLINTON AVE E · Sep 17, 2026 · 94 m away
  • Zoning review

    Closed

    55 BANFF RD · Sep 11, 2026 · 295 m away
  • Zoning review

    Application Received

    2 GLAZEBROOK AVE · Sep 8, 2026 · 285 m away
  • Zoning review

    Application Received

    2 GLAZEBROOK AVE · Sep 8, 2026 · 285 m away
  • Zoning review

    Cancelled

    2 GLAZEBROOK AVE · Sep 8, 2026 · 285 m away

Neighbourhood: Mount Pleasant East

About the area around the lot, not the lot itself.

Nearest station
Leaside Station4 min walk
Nearest TTC stop
Eglinton Ave East at Bayview Ave2 min walk
Nearest cycling route
Broadway AveSigned Route (No Pavement Markings), 5 min walk
Nearest traffic count
22,485 vehicles in 14 hEglinton Ave E / Hoyle Ave, 60 m away, May 6, 2025
Serious collisions within 500 m
02021–2026, killed or seriously injured
Parks
Charlotte Maher Park2 min walk
Howard Talbot Park3 min walk
Bessborough Parkette6 min walk

Schools within 1 km

  • LEASIDE HIGH SCHOOL English Public 9 min walk
  • CHILDREN'S GARDEN JUNIOR SCHOOL Private 9 min walk
  • MAURICE CODY JR PUBLIC SCHOOL English Public 11 min walk
  • POLARIS LEARNING CENTRE SCHOOL Private 12 min walk
  • TORONTO STEM SCHOOL Private 13 min walk
  • BESSBOROUGH DRIVE ELEMENTARY SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMount Pleasant EastMedian neighbourhood
Median household income (2020)$110,000$84,500
Households that own their home55%54%
Population (2021)16,37016,813
Homes built in 1960 or before52%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMount Pleasant EastCity median
Assault336.5636.3
Robbery10.269.5
Auto theft224.4192.6
Theft over $5,00045.946.1
Break and enter204172.8
Theft from vehicles107.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.