60 York StToronto · zoning, lot size and permit records

Commercial residential · CR 12.0 (c8.0; r11.7) SS1 (x2333)24.1 × 32.1 m762 m²on York Stbacks onto Ln E University N Heenan

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 24 120529 (Rev 02: Revised layoutRev 01: (Pending application form for scopeInstallation of new sp..., 2026); 26 142663 (Application for a permit to erect and display first party 1 wall sign and 1 projecting..., 2026); 26 104111 (1 wall sign**UNION HOTEL**, 2026); and 1 more. Larger work can mean noise and trucks next door; read what each one is for.
  • 2 development applications open within 300 m, up to 65 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.
  • Major Transit Station Area: KingThe City plans more homes around the station: good for transit, and more building over time.
N10 m
24.1 m frontage32.1 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: in a Heritage Conservation District (Part V)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Work or applications in progress

    Good to know

    Recent records on this lot: 24 120529 (Rev 02: Revised layoutRev 01: (Pending application form for scopeInstallation of new sp..., 2026); 26 142663 (Application for a permit to erect and display first party 1 wall sign and 1 projecting..., 2026); 26 104111 (1 wall sign**UNION HOTEL**, 2026); and 1 more.

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 65 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

13 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review26 230760 ZSVUnder Review
    Sep 1, 2026 · 60 YORK ST
  • Zoning review26 201980 ZPRClosed
    Jul 14, 2026 · 60 YORK ST
  • Building permit24 120529Revision Issued

    Rev 02: Revised layoutRev 01: (Pending application form for scopeInstallation of new sprinkler systems

    Jun 11, 2026 · 60 YORK ST
  • Building permit24 127910Ready for Issuance

    Revision 03: Revision to permit Interior alterations of the basement, main floor and second floor. - STRATHCONA HOTEL

    May 21, 2026 · 60 YORK ST
  • Building permit26 142663Permit Issued

    Application for a permit to erect and display first party 1 wall sign and 1 projecting sign, displaying static copy and illuminated, erected at the first storey.Dimensions:1 Wall Structure sign: 0.19m L x 0.61m W x 0.01m D at a height of 1.73 m on the east elevation.1 Projection sign: 0.56m L x 0.69m W x 0.15m D at a height of 2.62 m on the east elevation.**SAHNI****CAFE & LOUNGE**

    May 20, 2026 · 60 YORK ST
  • Building permit26 104111Permit Issued

    1 wall sign**UNION HOTEL**

    Feb 4, 2026 · 60 YORK ST
  • Building permit26 101641Cancelled

    1 WALL SIGN**UNION HOTEL**

    Jan 7, 2026 · 60 YORK ST
  • Building permit24 236999Closed

    1 wall sign**UNION HOTEL**

    Nov 21, 2024 · 60 YORK ST
Show 5 older records
  • Zoning review12 270561 ZZCClosed
    Oct 30, 2012 · 60 YORK ST
  • Building permit10 173097Closed

    Proposal to install two back flow prevention device to existing Hotel.

    May 14, 2010 · 60 YORK ST
  • Zoning review02 119698 ZSVClosed
    Mar 20, 2002 · 60 YORK ST
  • Zoning review01 202560 ZPRClosed
    Dec 13, 2001 · 60 YORK ST
  • Building permit01 121609Closed

    reclad portion of east elevation - grade to 3rd floor. hold for survey approval, amended encroachment agreement. survey rec'd

    Apr 30, 2001 · 60 YORK ST

Check before you build

  • Site-specific exception 900.11.10(2333)

    Needs a closer look

    1 site-specific rule and 5 older by-laws that still prevail apply to this lot. They can override the standard rules on this page. 1 part is limited to an area drawn on a by-law diagram; check whether this lot is in it.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2333)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2).

  2. Older by-law A

    Section 12(1) 333 of former City of Toronto By-law 438-86

  3. Older by-law B

    Section 12(1) 397 of former City of Toronto By-law 438-86

  4. Older by-law C

    Section 12(2) 132 of former City of Toronto By-law 438-86

  5. Older by-law D

    Section 12(2) 208 of former City of Toronto By-law 438-86

  6. Older by-law E

    Section 12(2) 276 of former City of Toronto By-law 438-86

  7. Older by-law Y · diagram area

    On the even numbered addresses 180 to 188 University Ave., 192 and 194 Adelaide St. W., City of Toronto by-law 469-06

22 parts for other addresses
  • F On 77 Adelaide St. W., former City of Toronto by-law 131-78
  • G On 105 Adelaide St. W., 77 Adelaide St. W., 120 King St. W., 130 King St. W., former City of Toronto by-laws 47-80 and 121-80
  • H On 141 Bay St., 45 Bay St., 40 Bay St., 55 Bremner Blvd., 222 Bremner Blvd., 280 Bremner Blvd., the odd numbered addresses of 61-71 Front St. W., 18 Yonge St., …
  • I On 220 Bay St., former City of Toronto by-law 475-91
  • J On 222 Bay St., the odd numbered addresses of 55-77 King St. W., 100 Wellington St. W., former City of Toronto by-law 207-88
  • K On or between the even numbered addresses of 390-394 Bay St., 65 Queen St. W., former City of Toronto by-law 119-68
  • L On 320 Bay St., former City of Toronto by-law 56-87
  • M On 121 King St W., Section 12(2) 135 of former City of Toronto By-law 438-86
  • N On 145R King St. W., the odd numbered addresses of 95-107 Wellington St. W., 70 York St., former City of Toronto by-law 442-88
  • O On 150 King St. W., 75 Simcoe St., former City of Toronto by-law 416-81
  • P On 150 King St W., Section 12(2) 121 of former City of Toronto By-law 438-86
  • Q On 200 King St. W., 71 Simcoe St., 73 Simcoe St., former City of Toronto by-law 417-81
  • R On 200 King St W., Section 12(2) 123 of former City of Toronto By-law 438-86
  • S On the even numbered addresses of 118A-120 Pearl St., 180 University Ave., former City of Toronto by-law 287-90 and Section 12(2) 235 of former City of Toronto …
  • T On 73 Richmond St. W. and 66 Temperance St., City of Toronto by-law 149-02
  • U On the lands municipally known as 75 Simcoe St. in 1981, Section 12(2) 120 and 12(2) 122 of former City of Toronto By-law 438-86
  • V On 1 University Ave., former City of Toronto by-laws 27-83 and 129-83
  • W On 33 University Ave., Section 12(2) 136 of former City of Toronto By-law 438-86
  • X On 155 University Ave., former City of Toronto by-law 283-85
  • Z On 79 Wellington St. W., 85 Wellington St. W., former City of Toronto by-law 318-83
  • AA On the odd numbered addresses of 95-107 Wellington St. W., former City of Toronto by-laws 30-83 and 592-84
  • AB On the even numbered addresses of 150-166 York St., former City of Toronto by-laws 335-80, 522-80, and 107-81.
By-law 569-2013, Chapter 900

Lot facts

Area
762 m²
Frontage
24.1 m
Depth
32.1 m
Street
York St
Corner lot
No
Public lane
Ln E University N Heenan, 3.9 m along it
House footprint
654 m²
Back yard
0.3 mhouse to rear lot line
Side yards
0 m and 1 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
6house, garage, sheds
Max height
76 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: King. The lot is inside the King Major Transit Station Area approved by the Province (Site and Area Specific Policy 606). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 12.0 (c8.0; r11.7) SS1 (x2333) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: honey locust (22 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%7 of 7 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
1
Development applications
3

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 7 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing 26-storey non-residential building (office use) by constructing a one-storey ground floor addition (patio enclosure for an eating establishment), along the east side of the building.

    121 KING ST W · Jul 8, 2026 · 164 m away
  • Minor varianceApproved

    To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).

    20 KING ST W · Jun 17, 2026 · 488 m away
  • Minor varianceApproved

    To alter the existing 17-storey mixed-use building by constructing a side (east) one-storey addition (patio enclosure for the existing outdoor dining area of Local Public Eatery), abutting Adelaide Street West, and York Street.

    141 ADELAIDE ST W · Jan 14, 2026 · 320 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 1219-2023(OLT) for a 61-storey mixed-use building, by increasing the building height to 67-storeys (223 m), the maximum gross floor area (residential and overall), a wind damper enclosure projection beyond the maximum building height, as well as to reduce the minimum non-residential gross floor area (remove the office uses), and reduce the number of loading spaces. There will be a total of 1,003 residential dwelling units on this lot (including 46 affordable units), subject to review under the related Site Plan Control Application (File 20 22 119164 STE 10 SA).

    100 SIMCOE ST · Sep 10, 2025 · 363 m away
  • Minor varianceApproved

    To alter the existing 27-storey mixed-use building by reconstructing the commercial space on the ground floor to accommodate a larger frontage along University Avenue for the financial institution use (Scotiabank), and to accommodate a second eating establishment use (fronting King Street West). The total gross floor area of the financial institution use will be maintained (modifying the layout of the frontage to University Avenue and King Street West). The existing commercial office space (fronting University Avenue) will be removed.

    145 KING ST W · Feb 12, 2025 · 150 m away

Latest activity nearby

  • Minor variancePending

    To alter the existing 42-storey mixed-use building by constructing a side (west) one-storey addition (to enclose the existing patio with two new side (west) principal entrances for the existing eating establishment), abutting Wellington Street West.

    155 WELLINGTON ST W · Nov 25, 2026 · 211 m away
  • Building permit

    Proposed interior demolition back to base, including mechanical and sprinkler work.

    130 KING ST W · Nov 24, 2026 · 218 m away
  • Building permit

    Proposed Interior build-out and alterations to an existing offices.

    150 KING ST W · Nov 24, 2026 · 238 m away
  • Building permit

    Rev 01 - Addition of the sink sewage sump pump in the meeting lounge 1713interior tenant fit-out including demolition, floor preparation, millwork installations, new doors and glazing, drywall partitions and ceilings, flooring and painting, appliance installation, and associated mechanical and electrical work

    121 KING ST W · Nov 24, 2026 · 164 m away
  • Building permit

    Proposal for interior alteration of a retail unit

    77 KING ST W · Nov 23, 2026 · 204 m away
  • Building permit

    17th Floor: -Remove temporary upright sprinklers.-Relocate up to two (2) fire hose cabinets. -Supply and install up to one (1) fire hose cabinet, c/w SV. Wiring and programming by others.-Supply and install up to one hundred fifty-seven (157) white concealed pendent sprinklers.-Supply and install up to forty-two (42) upright sprinklers.18th Floor:-Remove temporary upright sprinklers.-Relocate up to two (2) fire hose cabinets.-Supply and install up to one (1) fire hose cabinet, c/w SV. Wiring and programming by others.-Supply and install up to one hundred fifty-four (154) white concealed pendent sprinklers.-Supply and install up to forty-three (43) upright sprinklers.19th Floor:-Remove temporary upright sprinklers.-Relocate up to three (3) fire hose cabinets.-Supply and install up to one (1) fire hose cabinet, c/w SV. Wiring and programming by others.-Supply and install up to one hundred twenty (120) white concealed pendent sprinklers.-Supply and install up to forty-four (44) upright sprinklers.

    95 WELLINGTON ST W · Nov 23, 2026 · 89 m away
  • Building permit

    Interior renovation for the addition of 3 new offices within suite

    200 BAY ST · Nov 23, 2026 · 277 m away
  • Building permit

    Proposal for interior alterations to existing offices.

    200 BAY ST · Nov 23, 2026 · 277 m away
  • Building permit

    Proposal for localized loading dock slab concrete repairs and waterproofing replacement

    180 WELLINGTON ST W · Nov 20, 2026 · 159 m away
  • Building permit

    Proposed Fire/Security upgrades for 5 Fire Alarm Control Panels/Nodes by replacing CPU's and LCD's in existing Edwards Fire Alarm Panels ETS3.

    55 UNIVERSITY AVE · Nov 19, 2026 · 105 m away

Neighbourhood: Yonge-Bay Corridor

About the area around the lot, not the lot itself.

Nearest station
St Andrew Station3 min walk
Nearest TTC stop
St Andrew Station - Southbound Platform2 min walk
Nearest cycling route
University AveCycle Track, 1 min walk
Nearest traffic count
11,961 vehicles in 14 hYork St / Wellington St W, 50 m away, Jun 5, 2024
Serious collisions within 500 m
112021–2026, killed or seriously injured: 1 fatal, 6 with pedestrians, 5 with cyclists
Parks
Simcoe Park5 min walk
Olympic Park6 min walk
Roundhouse Park7 min walk

Schools within 1 km

  • VICTORIA STREET LINC English Public 11 min walk
  • KEYSTONE INTERNATIONAL SCHOOLS Private 12 min walk
  • OCAD UNIVERSITY - INCLUSIVE DESIGN INSTITUTE University 13 min walk
  • OCAD UNIVERSITY - STUDENT CENTRE University 14 min walk
  • OCAD UNIVERSITY - ABOVEGROUND ART SUPPLIES University 15 min walk
  • OCAD UNIVERSITY - THE LEARNING ZONE University 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-Bay CorridorMedian neighbourhood
Median household income (2020)$68,500$84,500
Households that own their home32%54%
Population (2021)12,64516,813
Homes built in 1960 or before2%29%
Homes needing major repairs2%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-Bay CorridorCity median
Assault3361.1636.3
Robbery300.169.5
Homicide125.3
Shootings1210.5
Auto theft162.1192.6
Theft over $5,000210.146.1
Break and enter552.2172.8
Theft from vehicles402.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.