Commercial residential · CR 12.0 (c8.0; r11.7) SS1 (x2325)24.1 × 34.5 m825 m²on Yonge Stcorner, also on Melinda Stbacks onto Ln W Yonge N Wellington

Not a home

A commercial or mixed-use building

Its main building is large, in a commercial zone: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 25 140807 STE 13 SA (Proposed redevelopment of the 12-storey office building at 60 Yonge Street with a 65-st..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • 15 development applications open within 300 m, up to 80 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: QueenThe City plans more homes around the station: good for transit, and more building over time.
N10 m
24.1 m frontage34.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2024

    Needs a closer look

    Still open in the City's records: 24 123898 (Proposed sprinkler intallation in an existing commerical unit, 2024, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 140807 STE 13 SA (Proposed redevelopment of the 12-storey office building at 60 Yonge Street with a 65-st..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 15 development applications open within 300 m

    Good to know

    15 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

49 records on file: more than at 100% of Toronto houses (median 0).

  • Zoning review25 140803 POZClosed
    Nov 4, 2025 · 60 YONGE ST
  • Development application25 140807 STE 13 SAUnder Review

    Proposed redevelopment of the 12-storey office building at 60 Yonge Street with a 65-storey mixed-use building that includes a 5-storey base building, topped with a 61-storey residential tower, for an overall building height of 246.2 metres (including the mechanical penthouse). A total of approximately 58 square metres of retail space is proposed on the ground floor, as well as 649 new residential units.

    Apr 7, 2025 · 60 YONGE ST · City file
  • Development application25 140803 STE 13 OZClosed

    Proposed redevelopment of the 12-storey office building at 60 Yonge Street with a 65-storey mixed-use building that includes a 5-storey base building, topped with a 61-storey residential tower, for an overall building height of 246.2 metres (including the mechanical penthouse). A total of approximately 58 square metres of retail space is proposed on the ground floor, as well as 649 new residential units.

    Apr 7, 2025 · 60 YONGE ST · City file
  • Building permit24 123898Permit Issued

    Proposed sprinkler intallation in an existing commerical unit.

    Aug 13, 2024 · 60 YONGE ST
  • Building permit23 135759Closed

    Proposal for the replacement of existing preaction panel protecting lan/telephone room on 4th floor

    May 5, 2023 · 60 YONGE ST
  • Building permit18 231222Closed

    Proposal to construct interior alterations to ground floor of existing office.

    Oct 24, 2018 · 60 YONGE ST
  • Building permit15 123773Closed

    Proposal to install 1 mag lock on the 2nd floor of the existing office building.

    Mar 5, 2015 · 60 YONGE ST
  • Building permit14 217907Closed

    Proposal for interior alterations to existing office space on the 2nd floor - BMO Financial Group

    Oct 15, 2014 · 60 YONGE ST
Show 41 older records
  • Building permit13 140821Closed

    To erect and display two non-illuminated projecting signs at the northerly elevation of the building in conjunction with an existing business operating on the premises. **Manpower**

    Apr 17, 2013 · 60 YONGE ST
  • Building permit13 108123Closed

    Proposal for interior alterations to ground floor of existing office building "Manpower Office" (170m2)

    Feb 4, 2013 · 60 YONGE ST
  • Building permit12 175133Closed

    Proposal to install two magnetic locks on a 11th floor office.

    May 23, 2012 · 60 YONGE ST
  • Building permit11 330735Closed

    Proposal for interior alterations to existing office space on the 8th flor - BMO Financial Group.

    Jan 11, 2012 · 60 YONGE ST
  • Building permit11 323962Closed

    Proposal for interior alterations to existing office space on the 11th floor - BMO Financial Group.

    Jan 11, 2012 · 60 YONGE ST
  • Building permit11 330260Closed

    Proposal to install two maglocks on first floor entrance of existing office building.

    Jan 9, 2012 · 60 YONGE ST
  • Building permit11 193133Closed

    Proposal for interior alterations to 10th floor office space. Tenant is BMO.

    May 27, 2011 · 60 YONGE ST
  • Building permit10 272073Closed

    Proposal to install one electromagnetic lock on 5th floor office space.

    Oct 14, 2010 · 60 YONGE ST
  • Building permit10 168861Closed

    Revision to existing building permit. See revision clouds.Interior alterations to a portion of the 2nd floor for "SCOTIABANK". The interior alterations is for approx. 88.26 sm of work area.

    Sep 21, 2010 · 60 YONGE ST
  • Building permit10 184382Closed

    Proposal for interior alterations to existing office space on the 5th floor.

    Jun 2, 2010 · 60 YONGE ST
  • Zoning review10 149552 LPRClosed
    Apr 12, 2010 · 60 YONGE ST
  • Building permit09 158001Closed

    Proposal to install 1 backflow prevention device to the existing water line.

    Aug 20, 2009 · 60 YONGE ST
  • Building permit09 154287Closed

    HVAC - Inteiror alterations to existing office space on the 9th floor.

    Aug 11, 2009 · 60 YONGE ST
  • Building permit09 114979Closed

    Proposal for interior alterations to existing office space for "SGGG FUND SERVICES INC" on the 12th floor. This proposal includes interior partiion layout changes to the storage room, staff room, file room and the data centre. This tenant occupies the entire floor.

    Mar 10, 2009 · 60 YONGE ST
  • Building permit08 212202Closed

    Interior alterations to existing office space - floor 10 - Amalgamet Canada

    Oct 29, 2008 · 60 YONGE ST
  • Building permit08 196846Cancelled

    Interior alterations to suite on 11th floor. Single Tenant. AIG

    Aug 28, 2008 · 60 YONGE ST
  • Building permit08 196842Cancelled

    Interior alterations to suite on 9th floor. Multi Tenant. AIG

    Aug 28, 2008 · 60 YONGE ST
  • Building permit08 196837Cancelled

    Interior alterations to suite on 12th floor. Single Tenant. AIG

    Aug 28, 2008 · 60 YONGE ST
  • Building permit08 196834Cancelled

    Interior alterations to suite on 8th floor. Single Tenant.

    Aug 28, 2008 · 60 YONGE ST
  • Building permit08 187215Closed

    interior alterations on portion of 9th floor, ste. 900, office space

    Aug 6, 2008 · 60 YONGE ST
  • Building permit08 153593Closed

    HVAC - Interior fit out for new 'Subway' Restaurant to GF unit.

    May 6, 2008 · 60 YONGE ST
  • Building permit08 104995Closed

    Install 6 maglocks total to GF, 11th, 8th and 5th floors.

    Feb 12, 2008 · 60 YONGE ST
  • Building permit07 105262Closed

    Interior alterations to portion of existing Offices on 6th and 11th floors. Single Tenant Floors. Same Tenant

    Feb 5, 2007 · 60 YONGE ST
  • Building permit06 200052Closed

    Interior alterations to portion of existing Office Unit on 7th floor. Enclose existing public corridor access. Single Tenant Floor

    Jan 4, 2007 · 60 YONGE ST
  • Building permit05 208538Closed

    Make interior alterations to 10th floor office.

    Dec 13, 2005 · 60 YONGE ST
  • Building permit05 205960Closed

    Interior alterations to existing office on the 4th floor

    Dec 5, 2005 · 60 YONGE ST
  • Building permit04 172518Closed

    Interior alterations to offices on 3rd floor

    Sep 9, 2004 · 60 YONGE ST
  • Building permit03 187146Closed

    HVAC replacement - 14 units

    Nov 5, 2003 · 60 YONGE ST
  • Building permit03 146720Closed

    HVAC - Alter existing h.v.a.c. system on the 8th, 9th, 11th and 12th floor office.Tenant: E*Trade Canada

    Jul 2, 2003 · 60 YONGE ST
  • Building permit03 130629Closed

    interior alterations to 7 floors

    May 8, 2003 · 60 YONGE ST
  • Building permit02 126789Closed

    Make interior alterations to existing restaurant on first floor for designated smoking room (14 seats). (total seating in restaurant 57 seats) Health Dept. Approval rec'd Tenant: The Croissant Tree

    Jul 25, 2002 · 60 YONGE ST
  • Building permit01 188382Closed

    install 5 mag locks on 1st floor.

    Dec 24, 2001 · 60 YONGE ST
  • Building permit01 166627Closed

    Make interior alterations to portion of 3rd, 4th, 5th, 6th and 8th floors

    Aug 9, 2001 · 60 YONGE ST
  • Building permit00 139230Closed

    Alter existing h.v.a.c. system on portion of the 11th floor office.Tenant: Versus Technologies cost incl. 139223

    May 4, 2000 · 60 YONGE ST
  • Building permit00 139231Closed

    Install fixture on the 11th floor office: 1 kitchen sinkcost incl. 139223

    Apr 17, 2000 · 60 YONGE ST
  • Building permit00 135069Closed

    Install fixture on 8th floor office: 1 kitchen sinkTenant: Versus Technologies cost incl. 00 - 135060

    Apr 11, 2000 · 60 YONGE ST
  • Building permit99 021337Closed

    INSTALL HVAC AT 12TH FLOOR - VERSUS TECHNOLOGIES REFER TO APPLICATION NUMBER: 430552

    Oct 20, 1999 · 60 YONGE ST
  • Building permit99 021338Closed

    INSTALL PLUMBING FIXTURES 12TH FL 1 BAR S., 1 HWT REFER TO APPLICATION NUMBER: 430552

    Sep 29, 1999 · 60 YONGE ST
  • Building permit97 021470Closed

    HVAC ALTERATIONS ON 9TH FLOOR. COST INCL: 403284 BP

    Sep 17, 1997 · 60 YONGE ST
  • Building permit97 019411Closed

    INSTALL H.V.A.C. SYSTEM COST INCL. UNDER FILE #401224(B)990 LG AT 10TH FLOOR - NOBLE PEAK RESOURCES LTD.

    Jul 28, 1997 · 60 YONGE ST
  • Zoning review97 026322 LTOClosed
    May 2, 1997 · 60 YONGE ST

Check before you build

  • Site-specific exception 900.11.10(2325)

    Needs a closer look

    6 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2325)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(1) 333 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(1) 397 of former City of Toronto By-law 438-86

  3. Older by-law C

    Section 12(2) 132 of former City of Toronto By-law 438-86

  4. Older by-law D

    Section 12(2) 195 of former City of Toronto By-law 438-86

  5. Older by-law E

    Section 12(2) 208 of former City of Toronto By-law 438-86

  6. Older by-law F

    Section 12(2) 276 of former City of Toronto By-law 438-86

3 parts for other addresses
  • G On 303 Bay St., the even numbered addresses of 40-44 King St. W., 104 Yonge St., former City of Toronto by-law 503-84
  • H On 1 King St. W., former City of Toronto by-law 303-90
  • I On 100 Yonge St., former City of Toronto by-law 173-88.
By-law 569-2013, Chapter 900

Lot facts

Area
825 m²
Frontage
24.1 m
Depth
34.5 m
Street
Yonge St
Corner lot
Yes, also on Melinda St34.5 m along it
Public lane
Ln W Yonge N Wellington, 32.1 m along it
House footprint
825 m²
Back yard
0.2 mhouse to rear lot line
Side yards
0 m and 0 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
5house, garage, sheds
Max height
76 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Queen. The lot is inside the Queen Major Transit Station Area approved by the Province (Site and Area Specific Policy 605). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Priority retail street: Yonge Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CR 12.0 (c8.0; r11.7) SS1 (x2325) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source

Around this lot

Minor variances approved
100%7 of 7 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
25

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 7 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing 26-storey non-residential building (office use) by constructing a one-storey ground floor addition (patio enclosure for an eating establishment), along the east side of the building.

    121 KING ST W · Jul 8, 2026 · 417 m away
  • Minor varianceApproved

    To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).

    20 KING ST W · Jun 17, 2026 · 144 m away
  • Minor varianceApproved

    To alter the existing 27-storey mixed-use building by reconstructing the commercial space on the ground floor to accommodate a larger frontage along University Avenue for the financial institution use (Scotiabank), and to accommodate a second eating establishment use (fronting King Street West). The total gross floor area of the financial institution use will be maintained (modifying the layout of the frontage to University Avenue and King Street West). The existing commercial office space (fronting University Avenue) will be removed.

    145 KING ST W · Feb 12, 2025 · 496 m away
  • Minor varianceApproved

    To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.

    89 CHURCH ST · Jan 15, 2025 · 478 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 552-2019(LPAT)), for the existing four-storey commercial/office building, by permitting the dwelling unit use through the conversion of the second and third storeys from commercial/offices uses into residential dwelling units (live/work units). Also, to permit a new residential lobby, facing King Street East. No visitor parking spaces and accessible parking spaces will be provided on-site. There will be a total of three commercial units and 11 residential dwelling units (7 dwelling units and 1 commercial unit on the second level, and 4 dwelling units and 2 commercial units on the third level) within this mixed-use building.

    71 KING ST E · Dec 11, 2024 · 245 m away

Latest activity nearby

  • Building permit

    Modification of the existing sprinkler system for a new tenant layout (Cubecom) on the 6th floor. Related Permit no. 26 223212 BLD 00 BA

    4 KING ST W · Nov 23, 2026 · 114 m away
  • Building permit

    Interior renovation for the addition of 3 new offices within suite

    200 BAY ST · Nov 23, 2026 · 270 m away
  • Building permit

    Proposal for interior alterations to existing offices.

    200 BAY ST · Nov 23, 2026 · 270 m away
  • Building permit

    Revision 01 - Relocate 2 smoke detectors at the interior staircase.---------------------------------------------------------------Proposal to extend existing interconnected stair between 55th and 56th floor to 57th floor

    40 KING ST W · Nov 23, 2026 · 186 m away
  • Building permit

    Proposed interior fit-out for new tenant 'SMART & BIGGAR'.

    40 KING ST W · Nov 20, 2026 · 186 m away
  • Building permit

    Proposal for interior alterations - demolition of interior partition layout and ceilings back to base condition; washroom renovation/corridor and plumbing fixture/finish

    199 BAY ST · Nov 19, 2026 · 135 m away
  • Building permit

    Proposal to design and install sprinkler modifications (return to base building protection) on level 22, suite 2250 in an existing office

    161 BAY ST · Nov 19, 2026 · 212 m away
  • Building permit

    Revision 01 - Revision to permit 26 155898 BLD 00 BA and 26 155898 HVA 00 BA. (Revised Layout)Proposed interior alteration to 21st and 22nd floor office

    199 BAY ST · Nov 19, 2026 · 135 m away
  • Building permit

    PROPOSED INTERIOR ALTERATION TO EXISTING GROUP D OCCUPANCY FOR KALOS LLP. INCLUDING BUILDING,MECHANICAL, PLUMBING AND MAGLOCK PERMITS.

    40 KING ST W · Nov 18, 2026 · 186 m away
  • Building permit

    PROPOSED INTERIOR ALTERATION TO EXISTING GROUP D OCCUPANCY FOR KALOS LLP. INCLUDING BUILDING,MECHANICAL, PLUMBING.

    40 KING ST W · Nov 18, 2026 · 186 m away

Neighbourhood: Yonge-Bay Corridor

About the area around the lot, not the lot itself.

Nearest station
King Station1 min walk
Nearest TTC stop
King Station - Southbound Platform1 min walk
Nearest cycling route
Yonge StBike Lane, 3 min walk
Nearest traffic count
17,327 vehicles in 14 hYonge St / Wellington St E / Wellington St W, 70 m away, Jan 20, 2026
Serious collisions within 500 m
132021–2026, killed or seriously injured: 2 fatal, 6 with pedestrians, 4 with cyclists
Parks
Berczy Park3 min walk
Courthouse Square Park5 min walk
Cloud Gardens5 min walk

Schools within 1 km

  • KEYSTONE INTERNATIONAL SCHOOLS Private 5 min walk
  • VICTORIA STREET LINC English Public 5 min walk
  • DOWNTOWN ALTERNATIVE SCHOOL English Public 10 min walk
  • ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 11 min walk
  • GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 11 min walk
  • ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 12 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureYonge-Bay CorridorMedian neighbourhood
Median household income (2020)$68,500$84,500
Households that own their home32%54%
Population (2021)12,64516,813
Homes built in 1960 or before2%29%
Homes needing major repairs2%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleYonge-Bay CorridorCity median
Assault3361.1636.3
Robbery300.169.5
Homicide125.3
Shootings1210.5
Auto theft162.1192.6
Theft over $5,000210.146.1
Break and enter552.2172.8
Theft from vehicles402.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.