HousePrecheckCheck an address

60 Wellesley St EToronto · zoning, lot size and permit records

Residential · R (d2.5) (x878)10.7 × 50.3 m536 m²on Wellesley St E

Not a home

Paul Kane House Parkette - Prop B

The City of Toronto's real estate inventory lists Paul Kane House Parkette - Prop B here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 21 235904 STE 13 SB (1 block, 2021); 21 235897 STE 13 OZ (Official Plan and Zoning By-law amendment for 28-storey and 7-storey mixed-use building..., 2021). Larger work can mean noise and trucks next door; read what each one is for.
  • 23 development applications open within 300 m, up to 75 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: Bloor-YongeThe City plans more homes around the station: good for transit, and more building over time.
N20 m
10.7 m frontage50.3 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 21 235904 STE 13 SB (1 block, 2021); 21 235897 STE 13 OZ (Official Plan and Zoning By-law amendment for 28-storey and 7-storey mixed-use building..., 2021).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 23 development applications open within 300 m

    Good to know

    23 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 75 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • Development application26 119147 STE 13 OZClosed

    Combined Official Plan & Zoning By-law amendment for a 36-storey purpose built rental mixed-use tower atop a 5-storey podium with 409 residential rental units and retail at grade.

    Feb 20, 2026 · 64 WELLESLEY ST E · City file
  • Development application21 235904 STE 13 SBUnder Review

    1 block

    Nov 9, 2021 · 64 WELLESLEY ST E · City file
  • Development application21 235897 STE 13 OZCouncil Approved

    Official Plan and Zoning By-law amendment for 28-storey and 7-storey mixed-use buildings having a non-residential gross floor area of 883.9 square metres, and a residential gross floor area of 26017.0 square metres. 369 units are proposed, of which 76 are rental replacement units.

    Nov 9, 2021 · 64 WELLESLEY ST E · City file
  • Development application17 210131 STE 27 OZClosed

    A Zoning By-law Amendment and Official Plan Amendment application to redevelop the properties at 64-66 Wellesley St E and 552-570 Church St with a 39-storey mixed-use building (132.6 metres plus mechanical penthouse), containing 442 dwelling units, 4,828 square metres of retail space and a 320 square metre public space at the corner of Church and Wellesley Street. This application is a revision to the previously submitted proposal for a 43-storey mixed-use building (154.3 metres plus 7.0 metre mechanical penthouse), containing 430 residential units as well as 1,400 square metres of street-related retail space and a 260 square metre publicly accessible plaza.

    Aug 2, 2017 · 64 WELLESLEY ST E · City file

Check before you build

  • Site-specific exception 900.2.10(878)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(878)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(4).

  2. Older by-law A

    Section 12(1) 434 of former City of Toronto By-law 438-86

1 part for other addresses
  • B On 56 Wellesley St. E., former City of Toronto by-law 443-84.
By-law 569-2013, Chapter 900

Lot facts

Area
536 m²
Frontage
10.7 m
Depth
50.3 m
Street
Wellesley St E
Corner lot
No
Public lane
None
Max height
30 m
Max lot coverage
—
  • Site and Area Specific Policy 382. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d2.5) (x878) (Residential). Chapter 10, section 10.10 of the by-law. Source

Around this lot

Minor variances approved
96%26 of 27 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
4
Development applications
47

Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 27 variance decisions: more than at 59% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a complete third storey addition and a rear rooftop terrace. The existing home occupation will be maintained.

    63 ST NICHOLAS ST · Feb 15, 2023 · 392 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached rooming house by constructing a rear four-storey addition. A total of 26 rooms for living accommodation will be provided.

    344 JARVIS ST · Sep 21, 2022 · 495 m away
  • Minor varianceApproved

    To alter the existing three-storey office building by constructing a new elevator and a new dormer over the elevator shaft.

    92 ISABELLA ST · Jun 30, 2021 · 347 m away
  • Minor varianceApproved

    To alter the existing three-storey townhouse by constructing side one-storey additions, a rear attached garage with rooftop deck and a side third storey addition.

    10 ST JOSEPH ST · Jan 20, 2021 · 310 m away
  • Minor varianceApproved

    To alter the existing three-storey mixed use building by converting a portion of the basement into a dwelling unit.

    66 GLOUCESTER ST · Oct 8, 2020 · 183 m away

Latest activity nearby

  • Building permit

    Proposed interior alterations for dental office

    16 WELLESLEY ST W · Nov 10, 2026 · 298 m away
  • Building permit

    Proposed interior alteration at second, third, fifth and sixth floor to convert the property from office building to mixed-use building; Proposed: 10 residential units, 1 wellness studio and 5 officesExisting: 1 wellness studio at first floor and 1 office at fourth floor

    9 ST NICHOLAS ST · Nov 9, 2026 · 286 m away
  • Building permit

    2 Wall Sign****AXIA STATION****

    608 YONGE ST · Nov 5, 2026 · 254 m away
  • Building permit

    REV: Proposed revision for ventilation adjustments based on as-built conditionProposal to replace heating plant, domestic hot water heating, potable water distribution, ventilation and air conditioning systems.

    2 GLOUCESTER ST · Nov 3, 2026 · 265 m away
  • Building permit

    Interior renovation of existing X-ray Rooms 240, 219, 236 and 231, to be completed in four sequential phases, with one room renovated at a time. The project also included the installation of three new X-ray machines during Phases 2, 3 and 4.

    43 WELLESLEY ST E · Oct 28, 2026 · 92 m away
  • Building permit

    Proposal for interior alterations to an optometry office within a single ground-floor unit of an existing 55-storey high-rise building.

    12 WELLESLEY ST W · Oct 26, 2026 · 287 m away
  • Zoning review

    Closed

    12 ALEXANDER ST · Oct 20, 2026 · 292 m away
  • Building permit

    REV01: As bubbled on drawings.HVAC - Proposal for interior alterations to convert existing storage into leasing office and storage.

    15 DUNDONALD ST · Sep 30, 2026 · 156 m away
  • Building permit

    Proposal for installation of an art work on the front face of existing building. Weight 150kg

    519 CHURCH ST · Sep 25, 2026 · 116 m away
  • Zoning review

    Cancelled

    584 CHURCH ST · Sep 22, 2026 · 125 m away

Neighbourhood: Church-Wellesley

About the area around the lot, not the lot itself.

Nearest station
Wellesley Station3 min walk
Nearest TTC stop
Wellesley St East at Church St1 min walk
Nearest cycling route
Wellesley St ECycle Track, 1 min walk
Nearest traffic count
14,434 vehicles in 14 hWellesley St E / Church St, 80 m away, Sep 26, 2026
Serious collisions within 500 m
102021–2026, killed or seriously injured: 0 fatal, 6 with pedestrians, 1 with cyclists
Parks
Paul Kane House Parkette1 min walk
Barbara Hall Park1 min walk
James Canning Gardens3 min walk

Schools within 1 km

  • THE ABELARD CENTRE FOR EDUCATION Private 3 min walk
  • NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 4 min walk
  • CHURCH ST JR & NATIVE LEARNING CTR English Public 5 min walk
  • THE YMCA ACADEMY SECONDARY SCHOOL Private 5 min walk
  • JARVIS COLLEGIATE INSTITUTE English Public 6 min walk
  • NATIONAL BALLET SCHOOL - BETTY OLIPHANT THEATRE Private 6 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureChurch-WellesleyMedian neighbourhood
Median household income (2020)$60,400$84,500
Households that own their home24%54%
Population (2021)22,32016,813
Homes built in 1960 or before15%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleChurch-WellesleyCity median
Assault1264.6636.3
Robbery93.269.5
Homicide3.35.3
Auto theft46.6192.6
Theft over $5,000106.546.1
Break and enter146.4172.8
Theft from vehicles206.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.