Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
2 building permits open, the oldest since 2021
Needs a closer lookStill open in the City's records: 22 211601 (Installation of doors and associated partitions and hardware to create two barrier-free..., 2022, status Permit Issued); 21 151988 (New open-air storage shed for Toronto Water Center, 2021, status Revocation Pending).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Work or applications in progress
Good to knowRecent records on this lot: 26 185305 (Proposed additional offices and interior alterations of existing suites in building C, 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 Committee of Adjustment file on this lot
Good to know1 approved. A130/08SC (The applicant is requesting relief from the Zoning By-law to allow an addition of 21 ne..., 2008).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
15 records on file: more than at 100% of Toronto houses (median 0).
- Building permit26 185305Permit Issued
Proposed additional offices and interior alterations of existing suites in building C.
Jul 27, 2026 · 60 TIFFIELD RD - Building permit22 211601Permit Issued
Installation of doors and associated partitions and hardware to create two barrier-free vestibules.
Oct 25, 2022 · 60 TIFFIELD RD - Building permit21 191013Closed
Proposal for the installation of a new rooftop HVAC unit above stores area room #146 and associated HVAC conveying equipment in general office area 5 rooms #147, general office room #179 & service counter area room #148.
Aug 30, 2021 · 60 TIFFIELD RD - Building permit21 151988Revocation Pending
New open-air storage shed for Toronto Water Center
Jul 5, 2021 · 60 TIFFIELD RD - Building permit20 168998Closed
Proposal for new interior security vestibule at existing exit. Proposal to replace the existing windows with new opaque exterior wall assembly.
Aug 13, 2020 · 60 TIFFIELD RD - Building permit20 162468Closed
Proposal for interior alterations to existing office to facilitate addition of two new skylights.
Jul 29, 2020 · 60 TIFFIELD RD - Building permit20 162947Closed
Proposal to install one maglock on a first floor access to exit door. Install power supply and control system and tie into building fire alarm for emergency release of locks.
Jul 15, 2020 · 60 TIFFIELD RD - Building permit18 110107Closed
Proposed: Site work reconfiguring existing north and south parking lots to accommodate new outdoor generator THES electrical equipments and an additional parking spaces. Building C - converting existing THES transformer vault to new main electrical room. Building A - reconfiguring existing data hall and concerting existing office space to new non raised floor data hall. Building B - renovate and reconfigure existing office space to accommodate new server room with M&E support spaces, loading/staging room.
Apr 10, 2018 · 60 TIFFIELD RD
Show 7 older records
- Zoning review17 221645 ZPRClosedAug 23, 2017 · 60 TIFFIELD RD
- Building permit13 162725Closed
install 1 Mag Locks for City of Toronto
Jun 7, 2013 · 60 TIFFIELD RD - Building permit11 323812Closed
install 4 Mag Locks for City of Toronto
Jan 12, 2012 · 60 TIFFIELD RD - Minor varianceA130/08SCApproved
The applicant is requesting relief from the Zoning By-law to allow an addition of 21 new parking spaces along the frontage of 60 Tiffield Road (along the front wall of existing Building A and B). This will be implemented in conjunction with on-site swing parking measures. Enhanced landscaping and accessibility will be provided in the existing street yard space.
Apr 30, 2008 · 60 TIFFIELD RD - Building permit07 285197Closed
interior alterations to Toronto Water Centre, office bldg B warehouse & new roofing
Feb 7, 2008 · 60 TIFFIELD RD - Zoning review07 285118 ZALClosedDec 7, 2007 · 60 TIFFIELD RD
- Building permit07 285189Cancelled
interior partial demolition
Dec 7, 2007 · 60 TIFFIELD RD
Lot facts
- Area
- 27,460 m²
- Frontage
- 144.8 m
- Depth
- 194.2 m
- Street
- Tiffield Rd
- Corner lot
- No
- Public lane
- None
- House footprint
- 6,101 m²roof up to 17.4 m
- Back yard
- 68 mhouse to rear lot line
- Side yards
- 14 m and 47.3 mhouse to side lot lines
- Buildings on the lot
- 3house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Zone E 0.7 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
Around this lot
- Minor variances approved
- —no decisions on file
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 0
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To construct (3) 1-storey industrial office buildings.
5280 FINCH AVE E · Jul 24, 2024 · 449 m away - Minor varianceApproved
The applicant is seeking relief from the provisions of the Zoning By-law to construct a new 4-bay garage and storage building.
70 NASHDENE RD · Mar 17, 2016 · 451 m away
Latest activity nearby
- Zoning review
Closed
589 MIDDLEFIELD RD · Nov 6, 2026 · 272 m away - Building permit
Proposal for installing four gas-fired chillers to provide cooling for ice-making machines. The chillers will be used as primary cooling source and city water will be used as a back-up cooling source for the ice machines and will be discharged into the storm sewer (Approval provided by Toronto water).Also installing one combined heat and power unit (CHP).
605 MIDDLEFIELD RD · Oct 27, 2026 · 196 m away - Building permit
Interior Alteration to create Office area within units 17-18
595 MIDDLEFIELD RD · Sep 15, 2026 · 189 m away - Building permit
Installing four gas-fired chillers to provide cooling for ice-making machines. Also installing one combined heat and power unit (CHP).
605 MIDDLEFIELD RD · Aug 26, 2026 · 196 m away - Building permit
Proposed additional offices and interior alterations of existing suites in building C.
60 TIFFIELD RD · Jul 27, 2026 · 38 m away - Building permit
Proposal to install four gas-fired chillers to provide cooling for ice-making machines, one combined heat and power unit (CHP).
605 MIDDLEFIELD RD · Jul 21, 2026 · 196 m away - Zoning review
Cancelled
605 MIDDLEFIELD RD · Jun 22, 2026 · 196 m away - Building permit
INTERIOR ALTERATION (Unit demising wall to separate Unit 14 and 15 and creation one opening at existing non-rated block wall at Unit 15-17)
50 TIFFIELD RD · May 7, 2026 · 122 m away - Zoning review
Closed
589 MIDDLEFIELD RD · Feb 23, 2026 · 272 m away - Building permit
Proposal to create two new offices in existing warehouse
605 MIDDLEFIELD RD · Dec 16, 2025 · 196 m away
Neighbourhood: Milliken
About the area around the lot, not the lot itself.
- Nearest TTC stop
- Middlefield Rd at Richmond Park Blvd5 min walk
- Nearest cycling route
- Finch Corridor TrlMulti-Use Trail, 12 min walk
- Nearest traffic count
- 8,437 vehicles in 8 hMiddlefield Rd / Richmond Park Blvd, 300 m away, Feb 13, 2017
- Serious collisions within 500 m
- 02021–2026, killed or seriously injured
- Parks
- Richmond Park8 min walk
Schools within 1 km
- PERCY WILLIAMS JR PUBLIC SCHOOL English Public 13 min walk
- AGINCOURT INTERNATIONAL ACADEMY Private 14 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Milliken | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $81,000 | $84,500 |
| Households that own their home | 88% | 54% |
| Population (2021) | 23,980 | 16,813 |
| Homes built in 1960 or before | 2% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Milliken | City median |
|---|---|---|
| Assault | 334.2 | 636.3 |
| Robbery | 197.5 | 69.5 |
| Shootings | 19 | 10.5 |
| Auto theft | 607.7 | 192.6 |
| Theft over $5,000 | 125.3 | 46.1 |
| Break and enter | 254.5 | 172.8 |
| Theft from vehicles | 398.8 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.