HousePrecheckCheck an address

60 Sussex AveToronto · zoning, lot size and permit records

Residential · R (d1.0) (x852)53.3 × 153.9 m8,183 m²on Sussex Avecorner, also on Robert Stbacks onto Ln N Sussex W Sussex Mews

Not a home

Robert St Playground

The City of Toronto's real estate inventory lists Robert St Playground here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelStill open in the City's records: 22 150990 (Subsurface piping connecting geothermal field (Robert St Field) to future student resid..., 2022, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 8 development applications open within 300 m, up to 37 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
  • Major Transit Station Area: SpadinaThe City plans more homes around the station: good for transit, and more building over time.
N50 m
53.3 m frontage153.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2022

    Needs a closer look

    Still open in the City's records: 22 150990 (Subsurface piping connecting geothermal field (Robert St Field) to future student resid..., 2022, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 37 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

6 records on file: more than at 95% of Toronto houses (median 0).

  • By-law investigation26 167358 GRA 00 IRClosed

    Graffiti

    May 26, 2026 · 60 SUSSEX AVE
  • Building permit22 150990Inspection

    Subsurface piping connecting geothermal field (Robert St Field) to future student residence building (700 Spadina) and townhouses (54 Sussex).

    Jun 22, 2022 · 60 SUSSEX AVE
  • Building permit20 142493Closed

    Proposal for a site services modification for a new propsed use of land (geoexchange field/soccer field and community park). A water supply from the City water main along the boulevard and a storm sewer connection will be required.

    Apr 14, 2021 · 60 SUSSEX AVE
  • Building permit20 188469Closed

    Proposal to construct shade structures in an existing community park - Robert Street Field Community Area

    Sep 16, 2020 · 60 SUSSEX AVE
  • Building permit20 127357Closed

    Geothermal Piping System for a future low-carbon energy system. The proposed scope of work does not include any building

    Mar 25, 2020 · 60 SUSSEX AVE
  • Building permit19 213133Closeddemolition

    Proposal to demolish the existing service building, ice rink, and tennis court.

    Oct 22, 2019 · 60 SUSSEX AVE

Check before you build

  • Site-specific exception 900.2.10(852)

    Needs a closer look

    2 site-specific rules apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.2.10(852)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The lands must comply with exception 900.2.10(4)

  2. Rule B

    On 60 Sussex Ave, a post-secondary school is permitted.

2 parts for other addresses
  • A On 666 Spadina Ave., former City of Toronto by-law 20-69
  • B On 704 Spadina Ave., former City of Toronto by-law 841-80.
By-law 569-2013, Chapter 900

Lot facts

Area
8,183 m²
Frontage
53.3 m
Depth
153.9 m
Street
Sussex Ave
Corner lot
Yes, also on Robert St153.9 m along it
Public lane
Ln N Sussex W Sussex Mews, 160.5 m along it
House footprint
530 m²roof up to 4.9 m
Back yard
85.7 mhouse to rear lot line
Side yards
15.8 m and 28.5 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
13 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Spadina. The lot is inside the Spadina Major Transit Station Area approved by the Province (Site and Area Specific Policy 597). Source
  • Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone R (d1.0) (x852) (Residential). Chapter 10, section 10.10 of the by-law. Source
  • 18 City trees in front of this lot. The City's street tree inventory lists 18 trees at this address: maple, silver (118 cm), maple, silver (91 cm), maple, norway (62 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
93%39 of 42 decisions
Garden suite permits
0
Laneway suite permits
5
Multiplex permits
5
Development applications
20

Within 300 m, last 10 years. 10 suite and multiplex permits: more than at 75% of Toronto houses (median 3). 42 variance decisions: more than at 77% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To construct a new rear two-storey detached ancillary building containing a one-car garage on the first level and storage space on the second level, abutting Albert Jackson Laneway. The existing rear one-storey detached ancillary building (garage) will be demolished.

    110 BRUNSWICK AVE · Aug 12, 2026 · 487 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear second storey addition with a balcony above the existing rear one-storey portion of the dwelling. Also, to permit the existing habitable space within the attic, which was converted without an authorized building permit.

    240 MAJOR ST · May 13, 2026 · 144 m away
  • Minor varianceApproved

    To alter the existing three-storey semi-detached dwelling by constructing a two-storey addition (including a basement level) to a portion of the rear south wall. Also, to construct a rear second storey addition (enclosing the balcony into habitable space), and a rear third storey addition with a balcony. The existing one-storey ancillary building (detached garage, in the rear yard, abutting the laneway) will be maintained and unaltered.

    147 MAJOR ST · Apr 1, 2026 · 415 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey townhouse dwelling by constructing a front covered porch with stairs.

    225 1/2 BORDEN ST · Feb 25, 2026 · 291 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear second storey deck which will provide a covered porch below. Also, to construct a new one-storey ancillary building (detached garage), in the rear yard abutting the laneway.

    125 BORDEN ST · Mar 26, 2025 · 463 m away

Latest activity nearby

  • Zoning review

    Not Started

    700 SPADINA AVE · Nov 24, 2026 · 105 m away
  • Building permit

    Proposal for installation of roof edge railings, roof mounted stair, fixed ladder and ladder port at TTC's Spadina Stn -Main Entrance

    7 SPADINA RD · Oct 28, 2026 · 252 m away
  • Building permit

    Proposal for installation of roof edge railings and ladder port at TTC's Spadina Stn. - Walmer Entrance

    9 WALMER RD · Oct 28, 2026 · 222 m away
  • Minor variancePending

    To alter the development standards for the eight-storey residential apartment building (approved under Site Specific Zoning By-Laws 879-2009(OMB) and 880-2009(OMB)), increasing the height (from 25.5 m to 26.1 m), and reducing the rear projection (at the rear of the building at levels three to eight). A Site Plan Control application (File Number 20 20 162492 STE 11 SA) is currently under review. There will be a total of 16 residential dwelling units within the apartment building on this lot.

    15 GLEN MORRIS ST · Oct 21, 2026 · 268 m away
  • Building permit

    1 OVERHANGING STRUCTURE SIGN + 1 PROJECTING SIGN**SMASH BUDDY**

    708 SPADINA AVE · Oct 13, 2026 · 93 m away
  • Building permit

    1 OVERHANGING STRUCTURE SIGN + 1 PROJECTING SIGN**PHOLOSOPHY**

    704 SPADINA AVE · Oct 13, 2026 · 98 m away
  • Building permit

    1 overhanging structure sign + 1 projecting sign**OXYGEN**

    698 SPADINA AVE · Oct 13, 2026 · 110 m away
  • Building permit

    Renovation of the existing basement archive, with the existing use maintained, including floor lowering and associated structural, architectural, mechanical, and electrical alterations.

    310 BLOOR ST W · Sep 28, 2026 · 278 m away
  • Building permit

    Proposal for the installation of a fire sprinkler system

    98 HARBORD ST · Sep 24, 2026 · 249 m away
  • Zoning review

    Closed

    720 SPADINA AVE · Sep 14, 2026 · 61 m away

Neighbourhood: University

About the area around the lot, not the lot itself.

Nearest station
Spadina Station7 min walk
Nearest TTC stop
Spadina Ave at Sussex Ave South Side3 min walk
Nearest cycling route
Bloor St WCycle Track, 2 min walk
Nearest traffic count
10,680 vehicles in 8 hSpadina Ave / Sussex Ave, 140 m away, Nov 15, 2011
Serious collisions within 500 m
32021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 2 with cyclists
Parks
Matt Cohen Park2 min walk
Huron - Washington Parkette4 min walk
Paul Martel Park4 min walk

Schools within 1 km

  • PAUL PENNA DOWNTOWN JEWISH DAY SCHOOL & MILES NADAL JEWISH COMMUNITY CENTRE Private 2 min walk
  • UNIVERSITY OF TORONTO SCHOOLS Private 4 min walk
  • HOWLETT ACADEMY SCHOOL Private 6 min walk
  • TADDLE CREEK MONTESSORI SCHOOL Private 6 min walk
  • SCHOOL OF CONTINUING STUDIES - U OF T, BLDG 103 University 6 min walk
  • CENTRAL TECHNICAL SCHOOL English Public 7 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureUniversityMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home39%54%
Population (2021)6,43516,813
Homes built in 1960 or before59%29%
Homes needing major repairs11%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleUniversityCity median
Assault1740.5636.3
Robbery133.969.5
Homicide12.25.3
Auto theft182.6192.6
Theft over $5,000121.746.1
Break and enter730.3172.8
Theft from vehicles353188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.