Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (20% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation Limit3 building permits open, the oldest since 2003
Needs a closer lookStill open in the City's records: 22 122900 (Repair to concrete balcony slabs and railing replacement to existing building, 2022, status Permit Issued); 14 196980 (Proposal to repair concrete slab of underground garage, 2014, status Permit Issued); 03 176491 (Repair to parking garage for condominium building, 2003, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)2 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Property Standards): 26 105552 PRS 00 IR (Property Standards, 2026); 25 266191 HEA 00 IR (Adequate Heat, 2025).
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
7 records on file: more than at 97% of Toronto houses (median 0).
- By-law investigation26 105552 PRS 00 IRClosed
Property Standards
Jan 16, 2026 · 60 STEVENSON RD - By-law investigation25 266191 HEA 00 IRClosed
Adequate Heat
Dec 14, 2025 · 60 STEVENSON RD - Building permit22 122900Permit Issued
Repair to concrete balcony slabs and railing replacement to existing building
May 9, 2022 · 60 STEVENSON RD - Building permit18 215657Closed
The existing Fire Alarm Control Panel (MIRTONE 790) located in the Electrical Room, and Fire Alarm Annunciator integrated with voice communication panel, located in the main entrance vestibule will be replaced with a new MIRCOM FX-2000 panel and annunciator. All of the original wiring and fire alarm elements (fire detectors, pull stations, speakers, switches, etc.) will remain with no alterations.
Sep 19, 2018 · 60 STEVENSON RD - Building permit14 196980Permit Issued
Proposal to repair concrete slab of underground garage.
Aug 7, 2014 · 60 STEVENSON RD - Building permit11 285820Closed
Proposed repairs to ramps and P1 level of existing parking garage of residential apartment building.
Nov 1, 2011 · 60 STEVENSON RD - Building permit03 176491Inspection
Repair to parking garage for condominium building
Oct 17, 2003 · 60 STEVENSON RD
Check before you build
Site-specific exception 900.8.10(99)
Needs a closer look1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Former City of Etobicoke By-law No. 621.
Lot facts
- Area
- 6,080 m²
- Frontage
- 96.6 mestimated, irregular lot
- Depth
- 100.6 mestimated, irregular lot
- Street
- Silverstone Dr
- Corner lot
- Yes, also on Stevenson Rd100.6 m along it
- Public lane
- None
- Max height
- —
- Max lot coverage
- 40%
- Major Transit Station Area: Mount Olive. The lot is inside the Mount Olive Major Transit Station Area approved by the Province (Site and Area Specific Policy 705). Source
- Zone RAC (u344) (x99) (Residential Apartment Commercial). Chapter 15, section 15.20 of the by-law. Source
- 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: honey locust (8 cm), zelkova (8 cm), linden, littleleaf greenspire (8 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%3 of 3 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 0
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 3 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To convert the existing swimming pool and unused storage lockers into 10 additional dwelling units, for a total of 186 residential units.
40 STEVENSON RD · Mar 10, 2022 · 75 m away
Latest activity nearby
- Building permit
Proposal to replace fire pump
40 STEVENSON RD · Jul 3, 2026 · 75 m away - Building permit
Proposal to restore balcony and railings.
45 SILVERSTONE DR · Apr 9, 2026 · 63 m away - Building permit
Proposal to repair of sewer line and installing of backwater valve
72 STEVENSON RD · May 9, 2025 · 222 m away - Building permit
Proposal for balcony and garage repairs. Replacement of all gaurdrails and local concrete repair for garage roof slab for an existing apartment buidling.
2548 KIPLING AVE · Jul 22, 2024 · 237 m away - Building permit
2 WALL SIGNS**LAZEEZ SHAWARMA**
6200 FINCH AVE W · Jun 11, 2024 · 263 m away - Building permit
Proposed balcony repairs, replacement of all gaurdrails and local concrete repair for garage roof slab for an existing apartment buidling.
2548 KIPLING AVE · Feb 21, 2024 · 237 m away - Building permit
The proposal contains one first party illuminated wall sign, erected at the second storey on the east elevation of the building at above noted premises.Dimensions:0.76m L x 2.44m W x 0.09m D at a height of 9.47m.
6100 FINCH AVE W · Nov 27, 2023 · 211 m away - Building permit
Proposed Interior alterations for a Tutoring Center at Unit # E203
6100 FINCH AVE W · Oct 5, 2023 · 211 m away - Building permit
Application for a permit to erect and display one illuminated wall sign.*****RIYASAT*****
6200 FINCH AVE W · Sep 7, 2023 · 263 m away - Building permit
Revision #01 - Changes to interior layout.Proposal to construct interior alterations to convert a auto part retail store into a restaurant with 194 seats.
6200 FINCH AVE W · Jun 23, 2023 · 263 m away
Neighbourhood: Mount Olive-Silverstone-Jamestown
About the area around the lot, not the lot itself.
- Nearest station
- Stevenson Station2 min walk
- Nearest TTC stop
- Stevenson Station Westbound Platform2 min walk
- Nearest cycling route
- Kipling Ave Bicycle TrlMulti-Use Trail - Boulevard, 5 min walk
- Nearest traffic count
- 14,575 vehicles in 14 hFinch Ave W: Kipling Ave - Albion Rd, 110 m away, Nov 12, 2025
- Serious collisions within 500 m
- 32021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 0 with cyclists
- Parks
- Highfield Park2 min walk
- Smithfield Park7 min walk
- Beaumonde Heights Park7 min walk
Schools within 1 km
- HIGHFIELD JR SCHOOL English Public 4 min walk
- ALBION LINC English Public 5 min walk
- NORTH ALBION COLLEGIATE INSTITUTE English Public 5 min walk
- ST ANDREW CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
- AMAIRAH PRIVATE SCHOOL Private 11 min walk
- NORTH KIPLING JR MDL SCHOOL English Public 14 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Mount Olive-Silverstone-Jamestown | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $76,500 | $84,500 |
| Households that own their home | 46% | 54% |
| Population (2021) | 31,345 | 16,813 |
| Homes built in 1960 or before | 14% | 29% |
| Homes needing major repairs | 11% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Mount Olive-Silverstone-Jamestown | City median |
|---|---|---|
| Assault | 788.6 | 636.3 |
| Robbery | 107.3 | 69.5 |
| Homicide | 2.9 | 5.3 |
| Shootings | 20.3 | 10.5 |
| Auto theft | 275.4 | 192.6 |
| Theft over $5,000 | 26.1 | 46.1 |
| Break and enter | 55.1 | 172.8 |
| Theft from vehicles | 130.5 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.