Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Building permit open since 2005
Needs a closer lookStill open in the City's records: 05 185379 (Interior alterations to 4th floor office (unit #402 &404), 2005, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)1 Committee of Adjustment file on this lot
Good to know1 approved. A0929/06TEY (To convert the existing "Business Centre" use on the ground floor to a "Guest Suite". A..., 2007).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)15 development applications open within 300 m
Good to know15 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 50 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
14 records on file: more than at 100% of Toronto houses (median 0).
- Building permit19 184884Closed
Proposed installation of fire sprinkler heads in the lobby of the existing apartment building.
Aug 8, 2019 · 60 ST CLAIR AVE W - Building permit13 108192Closed
Proposal to install 1 testable backflow prevention device in existing residential condo building.
Feb 7, 2013 · 60 ST CLAIR AVE W - Minor varianceA0929/06TEYApproved
To convert the existing "Business Centre" use on the ground floor to a "Guest Suite". A 92 unit condominium has recently been constructed that contains amenity space, a Business Centre and residential units.
Jan 17, 2007 · 60 ST CLAIR AVE W - Zoning review06 171104 ZPRClosedAug 28, 2006 · 60 ST CLAIR AVE W
- Building permit05 205604Closed
HVA in connection with BLD 00 333019
Feb 9, 2006 · 60 ST CLAIR AVE W - Building permit05 185379Inspection
Interior alterations to 4th floor office (unit #402 &404).
Sep 29, 2005 · 60 ST CLAIR AVE W - Zoning review05 123223 PLOClosedApr 14, 2005 · 60 ST CLAIR AVE W
- Building permit02 131992Closed
Alter BP 02-131992 for foundation in conjunction with building permit application 00-333019 Hold for WES approval Item #26 of Undertaking TF Received June 25/03 TF
Jul 11, 2003 · 60 ST CLAIR AVE W
Show 6 older records
- Building permit02 131991Closed
alter plans to BP#02-131991 for excavation and shoring in conjunction to BP00-333019.
Jun 10, 2003 · 60 ST CLAIR AVE W - Building permit00 333019Cancelled
alter plans to B.P.#00-333019. Revision to the electrical drawings.
Mar 6, 2003 · 60 ST CLAIR AVE W - Building permit00 325202Closed
Build 1 storey temporary sales office building (Maximum 18 months)
Dec 8, 2000 · 60 ST CLAIR AVE W - Building permit00 156384Closed
DEMOLISH 4 STOREY AND BASEMENT OFFICE BLD** HISTORICAL
Jul 26, 2000 · 60 ST CLAIR AVE W - Building permit99 117798Closed
Relocate existing fire alarm panel and relocate annunciator panel to main entrance.
Jan 7, 2000 · 60 ST CLAIR AVE W - Zoning review86 028224 LTOClosedJun 27, 1986 · 60 ST CLAIR AVE W
Check before you build
Site-specific exception 900.11.10(2257)
Needs a closer look6 site-specific rules and 6 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category
- Rule B
These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 2 of former City of Toronto By-law 438-86; (B) Section 12(2) 6 of former City of Toronto By-law 438-86
- Rule C
Section 12(2) 262 of former City of Toronto By-law 438-86
- Rule D
Section 12(2) 263 of former City of Toronto By-law 438-86
- Rule E
Section 12(2) 267 of former City of Toronto By-law 438-86
- Rule F
Section 12(2) 270(a) of former City of Toronto By-law 438-86.
- Older by-law A
In a Commercial Residential zone, where the maximum lawfully permitted height exceeds the width of the right-of-way of the street it abuts then: (i) the angular plane requirements of regulations 40.10.40.70(2)(E) and 40.10.40.70(2)(G) do not apply; (ii) the rear yard setback requirements of regulation 40.10.40.70(2)(B) do not apply; and (iii) if the rear main wall of a building does not contain windows or openings: (a) the building must be set back at least 3.0 metres from any rear lot line that abuts a lot in the Residential Zone category; and (b) no building setback is required from any other zone category
- Older by-law B
These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(1) 2 of former City of Toronto By-law 438-86; (B) Section 12(2) 6 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 262 of former City of Toronto By-law 438-86
- Older by-law D
Section 12(2) 263 of former City of Toronto By-law 438-86
- Older by-law E
Section 12(2) 267 of former City of Toronto By-law 438-86
- Older by-law F
Section 12(2) 270(a) of former City of Toronto By-law 438-86.
Lot facts
- Area
- 1,227 m²
- Frontage
- 31.4 m
- Depth
- 39.6 m
- Street
- St Clair Ave W
- Corner lot
- No
- Public lane
- None
- Max height
- 46 m
- Max lot coverage
- —
- Major Transit Station Area: St Clair. The lot is inside the St Clair Major Transit Station Area approved by the Province (Site and Area Specific Policy 721). Source
- Yonge-St. Clair Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Zone CR 4.0 (c1.0; r3.0) SS2 (x2257) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 93%28 of 30 decisions
- Garden suite permits
- 1
- Laneway suite permits
- 0
- Multiplex permits
- 1
- Development applications
- 21
Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 30 variance decisions: more than at 63% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceRefused
To construct a new three-storey non-residential building (including a mezzanine level), with various uses such as: adaptable spaces for community-oriented and commercial uses, a convertible auditorium space, an atrium gathering area, workshops, studios, meeting rooms, café, entertainment places of assembly, eating/take-out establishment(s), and recreation. There will be greenroof areas, an outdoor rooftop terrace, and the rooftop mechanical penthouse will be enclosed (above the second storey).
1560 YONGE ST · May 27, 2026 · 245 m away - Minor varianceApproved
To permit additional commercial use types on the ground floor of the 44-storey mixed-use building (currently under construction).
1 DELISLE AVE · Feb 18, 2026 · 206 m away - Minor varianceApproved
To permit a commercial school use (fitness studio occupying Units 106 and 109) on the first storey of the existing 21-storey non-residential building.
2 ST CLAIR AVE W · Jan 28, 2026 · 183 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1032-2022) for a mixed-use development comprised of a 13-storey building (Building 1) and three towers (Tower 1 with 44-storeys, Tower 2 with 38-storeys and Tower 3 with 25-storeys) connected by a shared podium on the lot by reallocating a proportion of residential density from Building 1 to Tower 1, increasing the building height of Tower 1 from 44-storeys (144 m) to 46-storeys (161.2 m), decreasing the height of Building 1 from 13-storeys (53.5 m) to four-storeys (25 m), increasing the height and projections of the mechanical penthouse and architectural crowning elements associated with Tower 1, modifying setbacks and separation distance by relocating Tower 2 (north toward Building 1) and by altering the podium element below Tower 3.
1 HEATH ST E · Dec 10, 2025 · 295 m away - Minor varianceApproved
To redescribe the lands as a result of the conveyance of the rear portion of the lot for parkland dedication.
30 ST CLAIR AVE W · Oct 29, 2025 · 125 m away
Latest activity nearby
- Consent (lot split)Pending
To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.File Numbers B0048/26TEY, B0059/26TEY, and B0060/26TEY are associated.
30 ST CLAIR AVE W · Oct 28, 2027 · 125 m away - Consent (lot split)Pending
To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.File Numbers B0048/26TEY, B0059/26TEY, and B0060/26TEY are associated.
40 ST CLAIR AVE W · Oct 28, 2027 · 94 m away - Consent (lot split)Pending
To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.File Numbers B0048/26TEY, B0059/26TEY, and B0060/26TEY are associated.
1 DELISLE AVE · Aug 10, 2027 · 206 m away - Building permit
Proposed localized concrete repairs for an underground parking garage
45 ST CLAIR AVE W · Nov 24, 2026 · 122 m away - Minor variancePending
Accepted
103 HEATH ST W · Nov 20, 2026 · 269 m away - Building permit
Proposal to install 1 maglocks in existing office space - UNIT 400
1 ST CLAIR AVE E · Nov 13, 2026 · 264 m away - Building permit
Proposal for maglock installation.
2 ST CLAIR AVE W · Nov 10, 2026 · 183 m away - Building permit
Revision 01: replacing existing porch structure. PROPOSAL TO REPLACE THE EXISTING FRONT WOOD PORCH WIITH CONCRETE PORCH
66 BALMORAL AVE · Nov 10, 2026 · 275 m away - Building permit
Interior alteration to convert an existing Group D office occupancy to a Group D nail salon (beautyparlour/personal service use). Building, Plumbing and HVAC included.
55 ST CLAIR AVE W · Nov 9, 2026 · 68 m away - Building permit
Proposal for interior alterations including new furniture layout, new finishes, and new partitions for meeting rooms.
95 ST CLAIR AVE W · Nov 3, 2026 · 170 m away
Neighbourhood: Yonge-St.Clair
About the area around the lot, not the lot itself.
- Nearest station
- St. Clair Station4 min walk
- Nearest TTC stop
- St Clair Ave West at Deer Park Cres East Side1 min walk
- Nearest cycling route
- Yonge StCycle Track, 4 min walk
- Nearest traffic count
- 15,303 vehicles in 14 hSt Clair Ave W / Deer Park Cres, 110 m away, Oct 18, 2025
- Serious collisions within 500 m
- 42021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 1 with cyclists
- Parks
- Yorkminster Park Baptist Church Park5 min walk
- Amsterdam Square5 min walk
- Lawton Parkette6 min walk
Schools within 1 km
- THE LINDEN SCHOOL Private 6 min walk
- THE YORK SCHOOL - JR CAMPUS Private 7 min walk
- DEER PARK JR & SR PUBLIC SCHOOL English Public 8 min walk
- THE YORK SCHOOL - MDL AND SR CAMPUS Private 8 min walk
- BROWN JR PUBLIC SCHOOL English Public 8 min walk
- DE LASALLE COLLEGE SCHOOL Private 10 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Yonge-St.Clair | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $94,000 | $84,500 |
| Households that own their home | 40% | 54% |
| Population (2021) | 12,905 | 16,813 |
| Homes built in 1960 or before | 45% | 29% |
| Homes needing major repairs | 5% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Yonge-St.Clair | City median |
|---|---|---|
| Assault | 270.8 | 636.3 |
| Robbery | 25.8 | 69.5 |
| Auto theft | 64.5 | 192.6 |
| Theft over $5,000 | 32.2 | 46.1 |
| Break and enter | 374 | 172.8 |
| Theft from vehicles | 116.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.