HousePrecheckCheck an address

60 Singer CrtToronto · zoning, lot size and permit records

111.3 × 85.4 m8,411 m²on Singer Crt

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelRecent records on this lot: 19 264391 NNY 17 OZ (Zoning By Law and Official Plan Amendment Application to permit a mixed use development..., 2019). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 48 storeysNew buildings may go up around here in the next years. More change nearby than at 94% of Toronto houses.
N50 m
111.3 m frontage85.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 19 264391 NNY 17 OZ (Zoning By Law and Official Plan Amendment Application to permit a mixed use development..., 2019).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 48 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • Development application21 220950 NNY 17 CDClosed

    Draft Plan of Standard Condominium application for 18-storey and 29-storey buildings with a total of 466 residential units, 474 residential parking spaces and 66 visitor parking spaces. This is known as Block 11 of Concord Park Place. Associated site plan control application 18 263017 NNY 24 SA.

    Oct 3, 2021 · 60 SINGER CRT · City file
  • Development application19 264391 NNY 17 OZOMB Approved

    Zoning By Law and Official Plan Amendment Application to permit a mixed use development containing 36,085 square metres of office space, 4,996 square metres of retail space, a 740 square metre day nursery, and 513 residential units. The office component is located in a 22 storey building, and the residential component is located in a 25 storey building, with the mixed use podium located at its base. Application has been appealed to the Ontario Land Tribunal (File No. OLT-001718).

    Dec 23, 2019 · 60 SINGER CRT · City file

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
8,411 m²
Frontage
111.3 m
Depth
85.4 m
Street
Singer Crt
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%1 of 1 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    9

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the existing detached dwelling by constructing a second storey addition, a rear two-storey addition and a rear deck. Please note that more than 50% of the existing building's main walls are to be demolished, therefore, the proposal is considered a new dwelling. NOTE: This application was previously deferred at the Committee of Adjustment hearing on October 23, 2025.

      23 AMBROSE RD · Feb 19, 2026 · 290 m away
    • Minor varianceApproved

      To request relief from the provisions of the former City of North York Zoning By-law No. 7625, as amended by By-law No. 959-2013(OMB), to facilitate the sharing of the non-residential and residential visitor parking spaces of the mixed-use development.

      40 ESTHER SHINER BLVD · Oct 23, 2025 · 395 m away
    • Minor varianceApproved

      A mixed use building with three towers (19, 31 and 27 storeys) and a total gross floor area of 82,241.56 sq.m. 990 dwelling units, 754 bicycle parking spaces, 1,079 parking spaces and 3 loading space are proposed.

      1001 SHEPPARD AVE E · Mar 11, 2021 · 499 m away
    • Minor varianceApproved

      To construct a new dwelling.

      21 ARROWSTOOK RD · May 8, 2019 · 424 m away
    • Minor varianceApproved

      To legalize and maintain the existing undersized underground parking spaces.

      1001 SHEPPARD AVE E · Feb 7, 2019 · 499 m away

    Latest activity nearby

    • Building permit

      Revision to the washroom layoutInterior alterations to an existing office - Unit 308

      1110 SHEPPARD AVE E · Oct 22, 2026 · 120 m away
    • Building permit

      Proposal for interior alterations to a hair salon

      86 ESTHER SHINER BLVD · Sep 24, 2026 · 266 m away
    • Zoning review

      Closed

      15 AMBROSE RD · Aug 10, 2026 · 238 m away
    • Zoning review

      Closed

      15 AMBROSE RD · Aug 10, 2026 · 238 m away
    • Building permit

      to erect and display total of 10 first party signs, all displaying static copy (4 Overhanging Structure Signs + 6 Wall Signs) with the following dimensions: Overhanging Structure Signs:Sign 1 1.82m L x 1.94m W x 0.42m D x 6.16m H above Grade, Sign Face area of 3.53 square metres, 1st storey, North elevation, illuminated. Sign 2 1.82m L x 1.94m W x 0.42m D x 6.16m H above Grade, Sign Face area of 3.53 square metres, 1st storey, South elevation, illuminatedSign 3 0.44m L x 3.35m W x 0.09m D x 4.78m H above Grade, Sign Face area of 1.47 square metres, 1st storey, West elevation , illuminatedSign 4 0.44m L x 3.35m W x 0.09m D x 4.78m H above Grade, Sign Face area of 1.47 square metres, 1st storey, East elevation, illuminatedWall Signs:Sign 5 0.76m L x 2.92m W x 0.06m D x 3.84m H above Grade, Sign Face area of 2.22 square metres, 1st storey, South elevation, non-illuminatedSign 6 0.08m L x 10.78m W x 0.08m D x 2.95m H above Grade, Sign Face area of 0.86 square metres, 1st storey, South elevation , non-illuminatedSign 7 0.98m L x 1.17m W x 0.08m D x 3.85m H above Grade, Sign Face area of 1.15 square metres, 1st storey, South elevation , non-illuminatedSign 8 0.81m L x 2.16m W x 0.1m D x 4.87m H above Grade, Sign Face area of 1.75 square metres, 1st storey, South elevation , non-illuminatedSign 9 0.81m L x 2.16m W x 0.1m D x 5.69m H above Grade, Sign Face area of 1.75 square metres, 1st storey, West elevation , non-illuminatedSign 10 0.81m L x 2.16m W x 0.1m D x 5.69m H above Grade, Sign Face area of 1.75 square metres, 1st storey, North elevation, non-illuminated***PETRO CANADA***

      1019 SHEPPARD AVE E · Jun 23, 2026 · 248 m away
    • Building permitdemolition

      Proposed new house by renovation by removing the portion of the house above the existing foundation wall, demolishing existing main floor structure, main floor interior and exterior walls, and roof. See also 25-223065 NNY 17 MV and 26-139492 BLD 00 NH

      23 AMBROSE RD · May 21, 2026 · 290 m away
    • Building permitnew building, new house

      Proposed new house by renovation by removing the portion of the house above the existing foundation wall, demolishing existing main floor structure, main floor interior and exterior walls, and roof. See also 25-223065 NNY 17 MV

      23 AMBROSE RD · May 6, 2026 · 290 m away
    • Building permitdemolition

      Proposed new house by renovation by removing the portion of the house above the existing foundation wall, demolishing existing main floor structure, main floor interior and exterior walls, and roof. See also 25-223065 NNY 17 MV and 26-139492 BLD 00 NH

      23 AMBROSE RD · Apr 7, 2026 · 290 m away
    • Development application

      Draft Plan of Condominium for 322 new units to be located within a 31-storey building. There will be 85 residential parking spaces.

      1200 SHEPPARD AVE E · Mar 17, 2026 · 108 m away · City file
    • Building permit

      This proposal addresses the standpipe system to be installed in the new sprinklered, residential Central Park Tower 3a at 1200-1220 Sheppard Avenue East, Toronto. The Tower 3a project is the second phase ('Phase 2A') of construction of a 4-tower building. The Tower 3a project will be 31 storeys in height with four basement levels devoted primarily to vehicle parking.

      1200 SHEPPARD AVE E · Mar 10, 2026 · 248 m away

    Neighbourhood: Bayview Village

    About the area around the lot, not the lot itself.

    Nearest station
    Leslie Station3 min walk
    Nearest TTC stop
    Leslie Station2 min walk
    Nearest cycling route
    Esther Shiner BlvdBike Lane, 3 min walk
    Nearest traffic count
    3,624 vehicles in 8 hOld Leslie St, 150 m away, Apr 12, 2001
    Serious collisions within 500 m
    22021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 1 with cyclists
    Parks
    Ambrose Parkette2 min walk
    Maureen Parkette4 min walk
    East Don Parkland5 min walk

    Schools within 1 km

    • BAY SCHOOL OF CANADA Private 2 min walk
    • NORTH YORK LINC English Public 13 min walk
    • DUNLACE PUBLIC SCHOOL English Public 14 min walk
    • ELKHORN PUBLIC SCHOOL English Public 15 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureBayview VillageMedian neighbourhood
    Median household income (2020)$83,000$84,500
    Households that own their home60%54%
    Population (2021)22,33016,813
    Homes built in 1960 or before10%29%
    Homes needing major repairs6%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleBayview VillageCity median
    Assault439.5636.3
    Robbery56.669.5
    Auto theft139.8192.6
    Theft over $5,00049.946.1
    Break and enter176.4172.8
    Theft from vehicles169.8188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.