HousePrecheckCheck an address

60 Photography DrToronto · zoning, lot size and permit records

Also 3506 Eglinton Ave W, 3510 Eglinton Ave W, 70 Photography Dr, 75 Photography Dr, 80 Photography Dr and 2 more

Employment · EH 1.0 (x42)≈ 469.1 × 726.7 m207,020 m²on Photography Dr

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • 2 development applications open within 300 m, up to 48 storeysNew buildings may go up around here in the next years. More change nearby than at 68% of Toronto houses.
N50 m
≈ 469.1 m frontage≈ 726.7 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (35% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (32% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Natural Heritage System (31% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 2 development applications open within 300 m

    Good to know

    2 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 48 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

5 records on file: more than at 93% of Toronto houses (median 0).

  • Building permit25 187732Closed

    Proposal for Electromagnetic Locking Device to be installed at EMSF Open office room 202 (door 202B) of maintenance building (EG-HMQ-003)

    Jul 15, 2025 · 85 INDUSTRY ST
  • Building permit24 201139Closednew building

    Proposal for a rear temerarory detached air supported structure for the purpose of storage space.

    Feb 18, 2025 · 85 INDUSTRY ST
  • Building permit24 190199Cancelled

    To construct a temporary structure in the parking lot of an industrial building. The purpose of this sprung structure is for additional storage space.

    Jul 30, 2024 · 85 INDUSTRY ST
  • Development application15 261197 WET 12 SAClosed

    Maintenance and Storage Facility for Eglinton LRT

    Dec 5, 2015 · 3500 EGLINTON AVE W · City file
  • Development application13 139447 WET 12 SAClosed

    Eglinton Crosstown LRT - Mount Dennis Station

    Mar 24, 2013 · 3500 EGLINTON AVE W · City file

Check before you build

  • Site-specific exception 900.22.10(42)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.22.10(42)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    Regulations 60.30.30.20(1) and 60.30.40.70(3) do not apply to a transportation use: Prevailing By-laws and Prevailing Sections: (A) Section 16(350), former City of York zoning by-law 1-83.

  2. Older by-law A

    Regulations 60.30.30.20(1) and 60.30.40.70(3) do not apply to a transportation use: Prevailing By-laws and Prevailing Sections: (A) Section 16(350), former City of York zoning by-law 1-83.

By-law 569-2013, Chapter 900

Lot facts

Area
207,020 m²
Frontage
469.1 mestimated, irregular lot
Depth
726.7 mestimated, irregular lot
Street
Photography Dr
Corner lot
No
Public lane
None
House footprint
7,908 m²
Back yard
162.9 mhouse to rear lot line
Side yards
76.5 m and 162.7 mhouse to side lot lines
Buildings on the lot
13house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Mount Dennis Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone EH 1.0 (x42) (Employment Heavy Industrial). Chapter 60, section 60.30 of the by-law. Source

Around this lot

Minor variances approved
0%0 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permit

    Interior alterations to an existing one-storey F2 industrial building.

    88 INDUSTRY ST · Nov 16, 2026 · 292 m away
  • Zoning review

    Cancelled

    88 INDUSTRY ST · Jun 2, 2026 · 292 m away
  • Zoning review

    Closed

    88 INDUSTRY ST · May 11, 2026 · 292 m away
  • Zoning review

    Cancelled

    88 INDUSTRY ST · Apr 14, 2026 · 292 m away
  • Building permitdemolition

    Proposal to demolish existing 1 1/2 Storey SFD-detachedSee 21 232674 WET 05 SA for future development

    23 HOLLIS ST · Aug 25, 2025 · 260 m away
  • Building permitdemolition

    Proposal to demolish existing 1 1/2 Storey SFD-detachedSee 21 232674 WET 05 SA for future development

    21 HOLLIS ST · Aug 25, 2025 · 267 m away
  • Building permitdemolition

    Proposal to demolish existing 1 1/2 Storey SFD-detachedSee 21 232674 WET 05 SA for future development

    19 HOLLIS ST · Aug 25, 2025 · 271 m away
  • Building permitdemolition

    Proposal to demolish existing 1 1/2 Storey SFD-detachedSee 21 232674 WET 05 SA for future development

    17 HOLLIS ST · Aug 25, 2025 · 278 m away
  • Building permitdemolition

    Proposal to demolish existing 1 1/2 Storey SFD-detachedSee 21 232674 WET 05 SA for future development

    15 HOLLIS ST · Aug 25, 2025 · 289 m away
  • Building permit

    Proposal for Electromagnetic Locking Device to be installed at EMSF Open office room 202 (door 202B) of maintenance building (EG-HMQ-003)

    85 INDUSTRY ST · Jul 15, 2025 · 163 m away

Neighbourhood: Beechborough-Greenbrook

About the area around the lot, not the lot itself.

Nearest station
Mount Dennis Station3 min walk
Nearest TTC stop
Mount Dennis Station2 min walk
Nearest cycling route
Eglinton Ave W TrailMulti-Use Trail - Boulevard, 5 min walk
Nearest traffic count
2,713 vehicles in 8 hBertal Rd / Industry St, 250 m away, Mar 28, 2013
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
North Keelesdale Park5 min walk
Coronation Park - York7 min walk
Keelesdale Park7 min walk

Schools within 1 km

  • DENNIS AVENUE COMMUNITY SCHOOL (CLOSED LOCATION) English Public 10 min walk
  • OUR LADY OF VICTORY CATHOLIC ELEMENTARY SCHOOL English Separate 12 min walk
  • DARUL ARQAM ISLAMIC ACADEMY SCHOOL Private 13 min walk
  • YORK MEMORIAL COLLEGIATE INSTITUTE (UNDER CONSTRUCTION) English Public 15 min walk
  • KEELESDALE JR PUBLIC SCHOOL English Public 15 min walk
  • BALA AVENUE COMMUNITY SCHOOL English Public 15 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBeechborough-GreenbrookMedian neighbourhood
Median household income (2020)$62,400$84,500
Households that own their home34%54%
Population (2021)6,26016,813
Homes built in 1960 or before42%29%
Homes needing major repairs12%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBeechborough-GreenbrookCity median
Assault692.3636.3
Robbery148.369.5
Shootings12.410.5
Auto theft247.2192.6
Theft over $5,00037.146.1
Break and enter111.3172.8
Theft from vehicles148.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.