HousePrecheckCheck an address

60 Pearldale AveToronto · zoning, lot size and permit records

≈ 121.5 × 172.7 m16,144 m²on Duncanwoods Drcorner, also on Pearldale Ave

Not a home

Humber Summit Mdl School

The City's school locations place Humber Summit Mdl School on this parcel. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A school next doorDrop-off traffic around 8 to 9 am and 3 to 4 pm on school days, children walking; a short walk for a family.
  • Permits or applications open on this parcelStill open in the City's records: 18 189329 (Removal and reinstallation of existing photovoltaic system on an existing rooftop. Stru..., 2018, status Permit Issued); 17 272348 (FIRE ALARM SYSTEM REPLACEMENT, 2018, status Inspection); 05 129509 (one portable classroom, 2005, status Permit Issued); and 1 more. Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 121.5 m frontage≈ 172.7 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 4 building permits open, the oldest since 2004

    Needs a closer look

    Still open in the City's records: 18 189329 (Removal and reinstallation of existing photovoltaic system on an existing rooftop. Stru..., 2018, status Permit Issued); 17 272348 (FIRE ALARM SYSTEM REPLACEMENT, 2018, status Inspection); 05 129509 (one portable classroom, 2005, status Permit Issued); and 1 more.

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 223559 LGW 00 IRClosed

    Long Grass and Weeds

    Aug 21, 2026 · 60 PEARLDALE AVE
  • Building permit25 219221Closed

    Proposal for emergency exterior masonry wall replacement after vehicle impact.

    Oct 1, 2025 · 60 PEARLDALE AVE
  • Building permit18 189329Permit Issued

    Removal and reinstallation of existing photovoltaic system on an existing rooftop. Structural reinforcement of "Humber Summit Middle School" roof.

    Aug 13, 2018 · 60 PEARLDALE AVE
  • Building permit17 272348Inspection

    FIRE ALARM SYSTEM REPLACEMENT

    Jan 29, 2018 · 60 PEARLDALE AVE
  • Building permit16 118496Closed

    Proposal for structural work to construct new rooftop curb in order to replace the existing rootop unit. - "Humber Summit Middle School"

    Mar 31, 2016 · 60 PEARLDALE AVE
  • Building permit15 119335Closed

    Permit to install 2000 m2 of Photovoltaic Solar Panel Arrays on roof of existing TDSB school.

    Mar 3, 2015 · 60 PEARLDALE AVE
  • Building permit04 189402Closed

    to add 1 portable classroom

    Feb 14, 2006 · 60 PEARLDALE AVE
  • Building permit05 129509Permit Issued

    one portable classroom

    Jun 1, 2005 · 60 PEARLDALE AVE
Show 1 older records
  • Building permit03 147209Inspection

    HVAC - To add 4 portable classrooms - Non-Certified Portables

    Feb 11, 2004 · 60 PEARLDALE AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
16,144 m²
Frontage
121.5 mestimated, irregular lot
Depth
172.7 mestimated, irregular lot
Street
Duncanwoods Dr
Corner lot
Yes, also on Pearldale Ave172.7 m along it
Public lane
None
House footprint
4,578 m²roof up to 14.1 m
Back yard
21.4 mhouse to rear lot line
Side yards
20.1 m and 49.8 mhouse to side lot lines
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 7 City trees in front of this lot. The City's street tree inventory lists 7 trees at this address: honey locust (24 cm), honey locust (15 cm), cherry, choke shubert (14 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
6
Development applications
0

Within 300 m, last 10 years. 6 suite and multiplex permits: more than at 64% of Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new garden suite.

    11 CHERRYLAWN AVE · Apr 17, 2025 · 445 m away
  • Minor varianceApproved

    To create a secondary suite within the existing dwelling.

    20 NAVENBY CRES · Mar 28, 2024 · 476 m away
  • Minor varianceApproved

    To legalize and to maintain the existing one-storey rear addition.

    77 SONGWOOD DR · Feb 9, 2023 · 439 m away
  • Minor varianceApproved

    To construct a one-storey rear addition.

    19 GRACEDALE BLVD · Mar 24, 2022 · 450 m away
  • Minor varianceApproved

    To construct a one-storey rear addition.

    53 CHERRYLAWN AVE · Jul 13, 2021 · 484 m away

Latest activity nearby

  • Building permitmultiplex

    Interior alterations to convert Single Family Dwelling to a Detached Houseplex (4 units).

    2849 ISLINGTON AVE · Jun 26, 2026 · 274 m away
  • Building permitmultiplex

    Proposal for interior alterations to convert existing sfd to a 3 unit dwelling.See also 26 160549 WNP.

    2855 ISLINGTON AVE · Jun 25, 2026 · 292 m away
  • Building permitmultiplex

    Proposed legalization of as-built three dwelling units with minor interior alterations.

    2851 ISLINGTON AVE · Jun 25, 2026 · 283 m away
  • Building permitmultiplex

    Proposal to legalize 3 dwelling units & interior alterations.

    2853 ISLINGTON AVE · Jun 25, 2026 · 287 m away
  • Building permitmultiplex

    PROPOSED LEGALIZATION OF AS-BUILT THREE-DWELLING UNITS WITH MINOR INTERIOR ALTERATIONS.

    2857 ISLINGTON AVE · Jun 25, 2026 · 297 m away
  • Building permitmultiplex

    Convert and legalize as built existing dwelling into 3 units

    2851 ISLINGTON AVE · Jun 24, 2026 · 283 m away
  • Building permit

    1 Overhanging Structure Sign ** RED SWAN PIZZA **-Finchdale Plaza-

    2600 FINCH AVE W · Jun 11, 2026 · 264 m away
  • Building permitsecondary suite

    Proposal to construct a secondary unit including 1 window to be enlarged.

    95 MILADY RD · Jan 26, 2026 · 145 m away
  • Building permit

    Proposal for emergency exterior masonry wall replacement after vehicle impact.

    60 PEARLDALE AVE · Oct 1, 2025 · 27 m away
  • Building permitsecondary suite

    Drain - Proposal for a second suite in the basement.

    11 MILADY RD · Aug 5, 2025 · 258 m away

Neighbourhood: Humber Summit

About the area around the lot, not the lot itself.

Nearest station
Pearldale Station5 min walk
Nearest TTC stop
Finch Ave West at Pearldale Ave5 min walk
Nearest cycling route
Humber River Recreational TrlMulti-Use Trail - Entrance, 7 min walk
Nearest traffic count
19,639 vehicles in 14 hFinch Ave W / Ardwick Blvd / Pearldale Ave, 330 m away, Nov 8, 2025
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Gracedale Park2 min walk
Gord and Irene Risk Park5 min walk
Islington Park6 min walk

Schools within 1 km

  • HUMBER SUMMIT MDL SCHOOL English Public 1 min walk
  • GRACEDALE PUBLIC SCHOOL English Public 6 min walk
  • ST ROCH CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
  • SUCCESS ACADEMY Private 13 min walk
  • NILE ACADEMY SCHOOL - BLUE HAVEN CAMPUS Private 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureHumber SummitMedian neighbourhood
Median household income (2020)$80,000$84,500
Households that own their home72%54%
Population (2021)12,18516,813
Homes built in 1960 or before16%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleHumber SummitCity median
Assault1031.8636.3
Robbery191.169.5
Shootings30.610.5
Auto theft672.6192.6
Theft over $5,000191.146.1
Break and enter397.4172.8
Theft from vehicles282.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.