HousePrecheckCheck an address

60 Havelock StToronto · zoning, lot size and permit records

4.2 × 17.5 m73 m²on Havelock St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.0 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 1 development application open within 300 m, up to 6 storeysNew buildings may go up around here in the next years. More change nearby than at 76% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N5 m
4.2 m frontage17.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 6 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
73 m²
Frontage
4.2 m
Depth
17.5 m
Street
Havelock St
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    84%37 of 44 decisions
    Garden suite permits
    7
    Laneway suite permits
    5
    Multiplex permits
    25
    Development applications
    3

    Within 300 m, last 10 years. 37 suite and multiplex permits: more than at 96% of Toronto houses (median 3). 44 variance decisions: more than at 79% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the existing three-storey mixed-used building (containing four residential dwelling units and one commercial unit) by constructing a rear (north) and side (west) three-storey addition. Also, to construct a mechanical room and side (east and west) stairwell access enclosures on the roof. There will be a total of four residential dwelling units, five commercial units and no parking spaces on this lot. The rear (north) attached ancillary building (carport) will be demolished.

      894 COLLEGE ST · Nov 4, 2026 · 404 m away
    • Minor varianceApproved

      To alter the existing one-storey ancillary building (detached garage, in the rear yard, abutting Parr Street and Macklem Avenue) by constructing a complete second storey addition (cantilevered on the north and east sides) to contain a second storey garden suite. There will be a total of two residential dwelling units on the lot (one unit occupying the main dwelling, and one unit occupying the ancillary building).

      288 GLADSTONE AVE · Nov 4, 2026 · 389 m away
    • Minor varianceApproved

      To construct a new two-storey detached ancillary building containing one laneway suite with two interior stacked bicycle parking spaces and a second storey side (south) juliette balcony. There will be a total of two residential dwelling units on this lot (one unit within the main building and one unit within the ancillary building).

      24 MUIR AVE · Sep 9, 2026 · 301 m away
    • Minor varianceApproved

      To alter the existing two-storey detached dwelling by constructing a rear two-storey addition, a complete third storey addition, a new front basement walkout, a new front ground floor covered porch with stairs, a new rear ground floor deck with stairs, and a rear third floor balcony. The existing rear detached garage will be demolished and the existing parking space within will be removed. Also, there will be a secondary suite located within the basement of the dwelling.

      61 ST ANNES RD · Sep 2, 2026 · 463 m away
    • Minor varianceApproved

      To construct a new two-storey detached ancillary building (containing a ground floor garage with one parking space, two bicycle parking spaces and a second storey laneway suite) cantilevered on the west side with a rear second storey balcony in the rear yard, abutting the laneway. There will be a total of two residential dwelling units on this lot (one unit within the main dwelling, and one unit within the ancillary building).

      155 RUSHOLME RD · Sep 2, 2026 · 156 m away

    Latest activity nearby

    • Building permit

      Proposal for interior alterations to main floor and third floor.

      37 HAVELOCK ST · Nov 24, 2026 · 63 m away
    • Building permitlaneway suite

      REVISION - to remove garage from first floor and add a gym/games room with bathroomProposal for demolition of existing 66m2 garage and construction of 79m2 laneway suite with garage.

      548 DOVERCOURT RD · Nov 24, 2026 · 285 m away
    • Building permit

      Proposed alterations and three storey rear addition to existing two-and-a-half storey dwelling.

      118 HAVELOCK ST · Nov 12, 2026 · 115 m away
    • Building permitdemolition, multiplex

      Proposal for demoliting existing SFD and constructing new 6plex.

      10 HAVELOCK ST · Nov 5, 2026 · 155 m away
    • Building permitmultiplex, new building, new house

      Proposal for new 6plex

      10 HAVELOCK ST · Nov 5, 2026 · 155 m away
    • Building permitlaneway suite

      Proposal to construct a rear second storey addition over the existing detached garage to use the addition as a laneway suite.

      155 RUSHOLME RD · Oct 28, 2026 · 156 m away
    • Building permit

      Proposed replacement of fire alarm control panel, annunciators, and initiating field devices.

      1 HAVELOCK ST · Oct 1, 2026 · 203 m away
    • Building permit

      Proposal for as-built third-floor unconditioned service room and exterior steel stair; structural revisions and new piers.

      217 RUSHOLME RD · Sep 30, 2026 · 183 m away
    • Building permitmultiplex

      Proposal for the reconstruction of existing rear addition and second floor deck. No changes made to the building footprint.

      110 HAVELOCK ST · Sep 24, 2026 · 81 m away
    • Building permit

      Proposed covered front porch on existing residence (front yard)

      206 RUSHOLME RD · Sep 14, 2026 · 148 m away

    Neighbourhood: Dufferin Grove

    About the area around the lot, not the lot itself.

    Nearest station
    Dufferin Station12 min walk
    Nearest TTC stop
    College St at Havelock St4 min walk
    Nearest cycling route
    Havelock StBike Lane - Contraflow, 1 min walk
    Nearest traffic count
    483 vehicles in 14 hLindsey Ave / Havelock St, 80 m away, Apr 8, 2025
    Serious collisions within 500 m
    52021–2026, killed or seriously injured: 2 fatal, 3 with pedestrians, 0 with cyclists
    Parks
    Dufferin Grove Park2 min walk
    Harrison-Dovercourt Parkette11 min walk
    Salem Parkette12 min walk

    Schools within 1 km

    • ST MARY CATHOLIC ACADEMY SECONDARY SCHOOL English Separate 6 min walk
    • THE ORCHARD MONTESSORI SCHOOL Private 8 min walk
    • DEWSON STREET JR PUBLIC SCHOOL English Public 8 min walk
    • ST HELEN CATHOLIC ELEMENTARY SCHOOL English Separate 9 min walk
    • BROCK JR PUBLIC SCHOOL English Public 10 min walk
    • OSSINGTON OLD ORCHARD JR PUBLIC SCHOOL English Public 11 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureDufferin GroveMedian neighbourhood
    Median household income (2020)$78,000$84,500
    Households that own their home42%54%
    Population (2021)11,21516,813
    Homes built in 1960 or before56%29%
    Homes needing major repairs10%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleDufferin GroveCity median
    Assault1224.5636.3
    Robbery111.369.5
    Auto theft111.3192.6
    Theft over $5,00087.546.1
    Break and enter270.3172.8
    Theft from vehicles278.3188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.