HousePrecheckCheck an address

60 Grosvenor StToronto · zoning, lot size and permit records

48.5 × 41.9 m2,021 m²on Grosvenor St

Not a home

Land without a building

The City's 3D model of buildings shows nothing standing on this parcel: vacant land, a parking lot or a yard. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Empty land or parkingWhat gets built here matters most to the street: read the applications on it and around it below.
  • Permits or applications open on this parcelStill open in the City's records: 13 203211 (Proposal to use area of demolished building (12 190434 DEM) as a temporary parking lot..., 2013, status Permit Issued). Larger work can mean noise and trucks next door; read what each one is for.
  • 5 development applications open within 300 m, up to 67 storeysNew buildings may go up around here in the next years. More change nearby than at 99% of Toronto houses.
N20 m
48.5 m frontage41.9 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2013

    Needs a closer look

    Still open in the City's records: 13 203211 (Proposal to use area of demolished building (12 190434 DEM) as a temporary parking lot..., 2013, status Permit Issued).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 67 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit13 203211Permit Issued

    Proposal to use area of demolished building (12 190434 DEM) as a temporary parking lot with 76 spaces for OPP use while garage repairs are in progress at 900 Bay St.

    Jul 22, 2013 · 60 GROSVENOR ST
  • Zoning review13 156789 ZZCClosed
    Apr 25, 2013 · 60 GROSVENOR ST
  • Zoning review13 142626 LPRClosed
    Apr 2, 2013 · 60 GROSVENOR ST
  • Building permit12 190434Closeddemolition

    Demolition of the existing 6 storey building complete with 1 below grade level. The area of the building is 5,263m².

    Oct 18, 2012 · 60 GROSVENOR ST
  • Development application10 164329 STE 27 SAClosed

    Revised Site Plan submission on October 1, 2010 with a podium. SITE PLAN APPROVAL APPLICATION FOR new 39 storey government office building 3 levels of parking. 450 parking spaces. mechanical penthouse on top.

    Apr 27, 2010 · 60 GROSVENOR ST
  • Building permit00 124636Closed

    install on 3rd floor: 5 w.b., see 427099 - cost included

    Jan 31, 2000 · 60 GROSVENOR ST
  • Building permit94 023005Closed

    MAKE INTERIOR ALTERATIONS TO 4TH FLOOR SOUTH-WING. EDC

    Nov 25, 1994 · 60 GROSVENOR ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
2,021 m²
Frontage
48.5 m
Depth
41.9 m
Street
Grosvenor St
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%10 of 10 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    19

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 10 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 88-2023(OLT)) for the 40-storey mixed-use building (which is currently under construction), by increasing the residential gross floor area, building height (41-storeys; 123.5 m to 127.6 m and 129.2 m to 133.6 m), and the height of the elevator overrun projection. There will be a total of 516 residential dwelling units on this site.

      20 MAITLAND ST · Apr 1, 2026 · 408 m away
    • Minor varianceApproved

      To alter the development standards for the previously approved 32-storey and 46-storey, two-tower mixed-use, purpose built rental development with 30 Percent affordable dwelling units and a child care center (approved under Site Specific Zoning By-law 1096-2021), by redistributing the building heights to 33 and 41storeys, increasing podium setbacks, reducing street wall heights, reducing the size of podium to create two separate buildings connected only below grade, decreasing the amount of indoor amenity space, reducing the number of two or more bedroom units, eliminating the resident and non-residential parking requirements, and decreasing the amount of residential visitor spaces. Site plan control application 19 127591 STE 13 SA is under review.

      27 GROSVENOR ST · Jul 30, 2025 · 175 m away
    • Minor varianceApproved

      To alter the development standards for the 40-storey mixed-use building (as approved under Site Specific Zoning By-law 88-2023) by increasing the total number of residential dwelling units, the overall and residential gross floor area, the building height, and the maximum projection height of an elevator overrun. Also, to reduce the total number of residential dwelling units with 3 or more bedrooms, the required amenity space, and the total number of residential visitor parking spaces. The new 45-storey mixed-use building (excluding the mechanical penthouse) will have a total of 572 residential dwelling units, 78 residential parking spaces, and 7 residential visitor parking spaces. This is currently undergoing Site Plan Control (Application Number 19 240163 STE 13 SA).

      26 MAITLAND ST · Apr 23, 2025 · 427 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 193-2024(OLT)), for a new 59-storey mixed-use building, by permitting a private student residence use on this lot. There will be a total of 587 residential dwelling units within this building.

      510 YONGE ST · Mar 19, 2025 · 280 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 621-2012(OMB), amending By-law 438-86), for the lot containing an existing three-storey vacant Heritage building (John Irwin House, municipally known as 9 Greenville Street) and the adjacent mixed-use condominium building (municipally known as 15 Grenville Street), by increasing the maximum permitted non-residential Gross Floor Area on the lot. Also, to permit medical/dental office and clinic uses that would be located on the ground, second, and third levels as well as within the basement of the existing three-storey Heritage building (John Irwin House).

      9 GRENVILLE ST · Feb 19, 2025 · 285 m away

    Latest activity nearby

    • Minor variancePending

      To alter the development standards for the previously approved two-tower mixed-use development (approved under Site Specific Zoning By-law 1096-2021), by reducing the height of a portion of the first storey (to include a mezzanine level located between the first and second storeys). There will be a total of 767 rental dwelling units (of which 30.4% (233 units) will be affordable rental units), as well as a childcare center on this lot. A related Site Plan Control application (under File Number 19 127591 STE 13 SA) has received Notice of Approval conditions.

      27 GROSVENOR ST · Nov 25, 2026 · 175 m away
    • Building permit

      Interior alterations for a new medical office - Toronto Endoscopy Clinic - Unit 700

      790 BAY ST · Nov 19, 2026 · 253 m away
    • Building permit

      Interior demolition to the 3rd and 4th floors.

      77 GRENVILLE ST · Nov 18, 2026 · 159 m away
    • Building permit

      INTERIOR ALTERATIONS TO GROUND FLOOR VACANT COMMERCIAL UNIT 3 FOR PROPOSED COFFEE SHOP: 'DARKHORSE ESPRESSO'

      484 YONGE ST · Nov 16, 2026 · 282 m away
    • Building permit

      Rev 01 - Proposed alterations to sprinkler system leve 3-14Proposal for sprinkler.

      900 BAY ST · Nov 12, 2026 · 107 m away
    • Building permit

      Proposal for sprinklers for Hearst Tower Level 8-11.

      900 BAY ST · Nov 10, 2026 · 107 m away
    • Building permit

      Proposal for sprinklers for Hepburn Tower Level 3-7.

      900 BAY ST · Nov 10, 2026 · 107 m away
    • Building permit

      Proposal for sprinklers for Hearst Tower Level 8-10.

      900 BAY ST · Nov 9, 2026 · 107 m away
    • Building permit

      Proposal for sprinklers for Hearst Tower Level 3-7.

      900 BAY ST · Nov 9, 2026 · 107 m away
    • Building permit

      1 projecting sign**SHIRIN JAAN**

      508 YONGE ST · Nov 5, 2026 · 280 m away

    Neighbourhood: Bay-Cloverhill

    About the area around the lot, not the lot itself.

    Nearest station
    Queen's Park Station7 min walk
    Nearest TTC stop
    Bay St at Grosvenor St1 min walk
    Nearest cycling route
    Bay StSharrows - Arterial - Connector, 1 min walk
    Nearest traffic count
    13,886 vehicles in 8 hBay St / Grosvenor St, 90 m away, Dec 18, 2018
    Serious collisions within 500 m
    82021–2026, killed or seriously injured: 2 fatal, 6 with pedestrians, 1 with cyclists
    Parks
    Opera Place3 min walk
    Breadalbane Park3 min walk
    Dr. Lillian McGregor Park3 min walk

    Schools within 1 km

    • ST JOSEPH'S COLLEGE SCHOOL English Separate 4 min walk
    • THE YMCA ACADEMY SECONDARY SCHOOL Private 4 min walk
    • TORONTO SCHOOL OF THEOLOGY - U OF T, BLDG 434 University 6 min walk
    • ORDE STREET JR PUBLIC SCHOOL English Public 10 min walk
    • RONALD MCDONALD HOUSE Private 11 min walk
    • CHURCH ST JR & NATIVE LEARNING CTR English Public 11 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureBay-CloverhillMedian neighbourhood
    Median household income (2020)$58,400$84,500
    Households that own their home30%54%
    Population (2021)16,67016,813
    Homes built in 1960 or before4%29%
    Homes needing major repairs3%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleBay-CloverhillCity median
    Assault601.9636.3
    Robbery74.769.5
    Auto theft16.6192.6
    Theft over $5,00087.246.1
    Break and enter286.4172.8
    Theft from vehicles145.3188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.