HousePrecheckCheck an address

60 Colborne StToronto · zoning, lot size and permit records

≈ 44.2 × 68.4 m753 m²on Colborne Stcorner, also on Church St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 14 105232 (Proposal to construct a new parapet wall to an existing 1 storey sales centre/office, 2014, status Revocation Pending). Larger work can mean noise and trucks next door; read what each one is for.
  • 16 development applications open within 300 m, up to 80 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 44.2 m frontage≈ 68.4 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: in a Heritage Conservation District (Part V)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Building permit open since 2014

    Needs a closer look

    Still open in the City's records: 14 105232 (Proposal to construct a new parapet wall to an existing 1 storey sales centre/office, 2014, status Revocation Pending).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 5 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards, Zoning): 26 247432 ZON 00 IR (Zoning, 2026); 26 144613 ZON 00 IR (Zoning, 2026); 25 270634 ZON 00 IR (Zoning, 2025); and 2 more.

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 16 development applications open within 300 m

    Good to know

    16 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • 1 short-term rental registrations here

    Good to know

    1 active short-term rental registration at this address (Condominium).

    What it means. Short-term rentals are allowed only in the operator's own principal residence, so a buyer cannot count on the same rental income. In a condo, check the building's rules too.

    How to confirm. The City's short-term rental page explains registration and the principal residence rule. Details

    City of Toronto, Short-term Rental Registrations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

19 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 247432 ZON 00 IRClosed

    Zoning

    Oct 1, 2026 · 60 COLBORNE ST
  • By-law investigation26 144613 ZON 00 IRClosed

    Zoning

    Apr 15, 2026 · 60 COLBORNE ST
  • By-law investigation25 270634 ZON 00 IRClosed

    Zoning

    Dec 30, 2025 · 60 COLBORNE ST
  • Zoning review25 270519 LTOClosed
    Dec 30, 2025 · 60 COLBORNE ST
  • By-law investigation25 257929 PRS 00 IVClosed

    Order Issued Property Standards: Ceiling not maintained free of holes, cracks, damaged and deteriorated materials.; Wall(s) not maintained free of holes, cracks, damaged and deteriorated materials.

    Nov 7, 2025 · 60 COLBORNE ST
  • By-law investigation25 251175 PRS 00 IRClosed

    Property Standards

    Nov 7, 2025 · 60 COLBORNE ST
  • Zoning review21 107516 LPRClosed
    Jan 22, 2021 · 60 COLBORNE ST
  • Building permit19 190195Closed

    To erect and display one static non-illuminated wall sign. Erected on the mullions of the curtain wall of the east elevation of the building. Measuring 0.9m by 3m at the height of 4.36m from the grade.**THIRD WAVE COFFEE**

    Oct 7, 2019 · 60 COLBORNE ST
Show 11 older records
  • Building permit19 147070Closed

    Proposal for interior alteration for a new coffee shop in a vacant unit.

    May 21, 2019 · 60 COLBORNE ST
  • Building permit18 239338Closed

    Proposal for interior alterations for a new Restaurant 30 Seats or Less on the ground floor of the existing Multiple Use Building (Res/Non-Res). REFERENCE permit # 14-207315(02)

    Nov 7, 2018 · 60 COLBORNE ST
  • Building permit18 141325Closed

    Install 1 Maglock on Level 1South

    Apr 12, 2018 · 60 COLBORNE ST
  • Development application17 219094 STE 28 CDClosed

    Draft Plan of Standard Condominium to permit a 25-storey mixed-use building with retail at grade and 254 residential units above. A total of 169 vehicular parking spaces are proposed.

    Aug 18, 2017 · 60 COLBORNE ST · City file
  • Building permit14 207315Closed

    FS - Sprinkler Shop Drawing - To construct a new 25 storey condo building with 254 residential dwelling units, and retail uses on grade. There will also be five floors of below grade parking provided. See PB folder 14-265922

    Jul 4, 2017 · 60 COLBORNE ST
  • Building permit16 267947Approved

    Alternative solutions regards to public pool

    Dec 16, 2016 · 60 COLBORNE ST
  • Building permit14 185827Closed

    Proposal for stand alone shoring and excavation for soil remediation.

    Jul 7, 2016 · 60 COLBORNE ST
  • Building permit16 174389Approved

    This alternative solution proposal has been prepared to address the provision of 65mm hose connections in lieu of fire hose stations for the standpipe system that will be install in the 60 Colborne St. building.

    Jun 15, 2016 · 60 COLBORNE ST
  • Building permit14 105232Revocation Pending

    Proposal to construct a new parapet wall to an existing 1 storey sales centre/office.

    Jun 24, 2014 · 60 COLBORNE ST
  • Development application12 130075 STE 28 OZClosed

    Proposal to construct a 25 storey, 77.3 metre (82.3 metres including mechanical penthouse) mixed-use building including 281 residential condominium units and 890 square metres of commercial uses at grade. The proposal also includes five levels of below-grade parking with 186 vehicle parking spaces. The proposal is for 54-70 Colborne Street & 101 King Street East. Also see site plan application 12 130079 STE 28 SA

    Feb 29, 2012 · 60 COLBORNE ST
  • Zoning review08 181481 PRZClosed
    Jul 14, 2008 · 60 COLBORNE ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
753 m²
Frontage
44.2 mestimated, irregular lot
Depth
68.4 mestimated, irregular lot
Street
Colborne St
Corner lot
Yes, also on Church St68.4 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    88%7 of 8 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    29

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 8 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).

      20 KING ST W · Jun 17, 2026 · 358 m away
    • Minor varianceApproved

      To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.

      89 CHURCH ST · Jan 15, 2025 · 293 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 552-2019(LPAT)), for the existing four-storey commercial/office building, by permitting the dwelling unit use through the conversion of the second and third storeys from commercial/offices uses into residential dwelling units (live/work units). Also, to permit a new residential lobby, facing King Street East. No visitor parking spaces and accessible parking spaces will be provided on-site. There will be a total of three commercial units and 11 residential dwelling units (7 dwelling units and 1 commercial unit on the second level, and 4 dwelling units and 2 commercial units on the third level) within this mixed-use building.

      71 KING ST E · Dec 11, 2024 · 69 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-laws 218-2021 and 219-2021), for a new 34-storey mixed-use building (which is currently under construction), by reducing the minimum number of vehicular parking spaces. There will be a total of 369 residential dwelling units on this lot.

      90 QUEEN ST E · Oct 23, 2024 · 466 m away
    • Minor varianceApproved

      To alter the development standards for the 33-storey mixed-use building (approved under Site Specific Zoning By-Law 1195-2022), by converting the required office use space into hotel use space (for 142 hotel suites and related facilities) on floors 1 through 10. The site is subject to a current Site Plan Control Application (File 2017 235087 STE 28 SA).

      34 KING ST E · Sep 25, 2024 · 176 m away

    Latest activity nearby

    • Zoning review

      Application On Hold

      91 FRONT ST E · Nov 24, 2026 · 215 m away
    • Building permit

      Proposal for interior alteration to existing office suites 208, 216, 230 and 306

      56 THE ESPLANADE · Nov 23, 2026 · 253 m away
    • Building permit

      Revision No.1: New Fire Shutter Window

      30 ADELAIDE ST E · Nov 20, 2026 · 256 m away
    • Building permit

      Proposed cooling Tower Replacement scope on the roof and mechanical room, along with one heating coil replacement.

      33 YONGE ST · Nov 17, 2026 · 270 m away
    • Building permit

      Proposal for additions and interior alterations to existing Nightclub at 17-19 Toronto St.

      19 TORONTO ST · Nov 16, 2026 · 170 m away
    • Building permit

      Proposed localized concrete repairs for the below grade basements to address spalding concrete and minor water penetration.

      69 YONGE ST · Nov 9, 2026 · 251 m away
    • Building permit

      Revision 01 - due site conditions and landlord repairsProposed interior alterations and repairs due to fire damage.

      47 COLBORNE ST · Nov 9, 2026 · 65 m away
    • Building permit

      UNIT 301 INTERIOR NON-STRUCTURAL PARTITION DEMOLITION

      47 COLBORNE ST · Nov 6, 2026 · 65 m away
    • Building permit

      REV 01: Revision to permit to combine the two existing all gender washrooms into oneProposal for interior alterations for tenant fit out to existing unit. Unit 300

      41 FRONT ST E · Nov 6, 2026 · 180 m away
    • Building permit

      REVISION- 03Rev 02 - Scope clarified and simplified for future tenant (Back to Base project with plumbing rough-ins). Build out of future space by others (under separate future permit).REVISION 01:Interior alterations - back to base building - group A occupancy

      71 FRONT ST E · Nov 5, 2026 · 152 m away

    Neighbourhood: Downtown Yonge East

    About the area around the lot, not the lot itself.

    Nearest station
    King Station5 min walk
    Nearest TTC stop
    King St East at Church St West Side1 min walk
    Nearest cycling route
    Adelaide St ECycle Track, 3 min walk
    Nearest traffic count
    6,090 vehicles in 8 hKing St E / Church St, 50 m away, Jun 29, 2023
    Serious collisions within 500 m
    142021–2026, killed or seriously injured: 2 fatal, 7 with pedestrians, 3 with cyclists
    Parks
    Toronto Sculpture Garden1 min walk
    Courthouse Square Park2 min walk
    Berczy Park2 min walk

    Schools within 1 km

    • KEYSTONE INTERNATIONAL SCHOOLS Private 3 min walk
    • VICTORIA STREET LINC English Public 5 min walk
    • DOWNTOWN ALTERNATIVE SCHOOL English Public 6 min walk
    • GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 6 min walk
    • ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 7 min walk
    • ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 11 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureDowntown Yonge EastMedian neighbourhood
    Median household income (2020)$69,500$84,500
    Households that own their home36%54%
    Population (2021)17,70016,813
    Homes built in 1960 or before7%29%
    Homes needing major repairs4%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleDowntown Yonge EastCity median
    Assault2360.8636.3
    Robbery143.369.5
    Shootings11.910.5
    Auto theft75.6192.6
    Theft over $5,00099.546.1
    Break and enter274.7172.8
    Theft from vehicles390.1188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
    • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.