Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: in a Heritage Conservation District (Part V)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register15 development applications open within 300 m
Good to know15 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 80 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
1 records on file: more than at 53% of Toronto houses (median 0).
- Zoning review91 026609 LTOClosedJun 14, 1991 · 60 CHURCH ST
Check before you build
Site-specific exception 900.11.10(2170)
Needs a closer look3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Section 12(1) 397 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 260 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 261 m²
- Frontage
- 8.7 m
- Depth
- 30.9 m
- Street
- Church St
- Corner lot
- Yes, also on Court St30.9 m along it
- Public lane
- Court Sq, 10.7 m along it
- Max height
- 23 m
- Max lot coverage
- —
- Major Transit Station Area: Queen. The lot is inside the Queen Major Transit Station Area approved by the Province (Site and Area Specific Policy 605). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Priority retail street: Church Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 4.0 (c3.0; r4.0) SS1 (x2170) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
Around this lot
- Minor variances approved
- 93%13 of 14 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 29
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).
20 KING ST W · Jun 17, 2026 · 346 m away - Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 430 m away - Minor varianceApproved
To permit a reduction in the number of required resident parking spaces and nine obstructed parking spaces, on-site.
89 CHURCH ST · Jan 15, 2025 · 176 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 552-2019(LPAT)), for the existing four-storey commercial/office building, by permitting the dwelling unit use through the conversion of the second and third storeys from commercial/offices uses into residential dwelling units (live/work units). Also, to permit a new residential lobby, facing King Street East. No visitor parking spaces and accessible parking spaces will be provided on-site. There will be a total of three commercial units and 11 residential dwelling units (7 dwelling units and 1 commercial unit on the second level, and 4 dwelling units and 2 commercial units on the third level) within this mixed-use building.
71 KING ST E · Dec 11, 2024 · 110 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-laws 218-2021 and 219-2021), for a new 34-storey mixed-use building (which is currently under construction), by reducing the minimum number of vehicular parking spaces. There will be a total of 369 residential dwelling units on this lot.
90 QUEEN ST E · Oct 23, 2024 · 357 m away
Latest activity nearby
- Building permit
Revision #1 to layout changes and hvac changes due to site conditions.Proposal for interior alterations for restaurant use.
1 ADELAIDE ST E · Nov 25, 2026 · 250 m away - Zoning review
Application On Hold
91 FRONT ST E · Nov 24, 2026 · 294 m away - Building permit
Proposal for interior alterations with mechanical, plumbing, and electrical work to suit new layout on floor 4.
99 QUEEN ST E · Nov 20, 2026 · 298 m away - Building permit
Revision No.1: New Fire Shutter Window
30 ADELAIDE ST E · Nov 20, 2026 · 164 m away - Building permit
nstallation of Eighteen (18) electromagnetic locking device including all associated life safety requirements
50 RICHMOND ST E · Nov 19, 2026 · 263 m away - Building permit
Installation of 2 Double (9th Floor) and 3 Double (10th Floor) Electromagnetic locks using a power supply system
1 ADELAIDE ST E · Nov 18, 2026 · 250 m away - Building permit
Proposal for additions and interior alterations to existing Nightclub at 17-19 Toronto St.
19 TORONTO ST · Nov 16, 2026 · 89 m away - Building permit
Rev 02: Addition of exterior window replacement; Change to 3rd & 4th floor corridor walls from new metal stud FRR to existing wood stud with new FRR; Door replacement at 2nd floor Bar EntranceREV 01: - addition of exterior window replacement, change to 3rd & 4th floor corridor walls from new metal stud FRR to existing wood stud with new FRR, door replacement at 2nd floor Bar EntranceProposal for interior renovations to 3rd & 4th Floors; extention of exit stair; addition of roof-top stair enclosure; plus wood deck and guard on the roof. New sprinkler system for the entire building.
124 CHURCH ST · Nov 16, 2026 · 203 m away - Building permit
Revision 01 - Revisions to address clarify structural concerns and complete phase 2 of heating system retrofit.----------------------------------------------------------Replacement of existing heating system with Air Source Heat Pumps and a back up condensing boiler. Mechanical room update to renew building pumps.
6 ADELAIDE ST E · Nov 9, 2026 · 256 m away - Building permit
Proposed localized concrete repairs for the below grade basements to address spalding concrete and minor water penetration.
69 YONGE ST · Nov 9, 2026 · 271 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- King Station5 min walk
- Nearest TTC stop
- King St East at Church St West Side1 min walk
- Nearest cycling route
- Adelaide St ECycle Track, 1 min walk
- Nearest traffic count
- 6,090 vehicles in 8 hKing St E / Church St, 80 m away, Jun 29, 2023
- Serious collisions within 500 m
- 152021–2026, killed or seriously injured: 2 fatal, 7 with pedestrians, 3 with cyclists
- Parks
- Courthouse Square Park1 min walk
- Toronto Sculpture Garden2 min walk
- St. James Park2 min walk
Schools within 1 km
- KEYSTONE INTERNATIONAL SCHOOLS Private 1 min walk
- VICTORIA STREET LINC English Public 4 min walk
- GEORGE BROWN COLLEGE - ST JAMES CAMPUS College 6 min walk
- DOWNTOWN ALTERNATIVE SCHOOL English Public 8 min walk
- ST MICHAEL CATHOLIC ELEMENTARY SCHOOL - BLDG 1 English Separate 8 min walk
- ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 9 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.