HousePrecheckCheck an address

60 Birmingham StToronto · zoning, lot size and permit records

Also 160 Dwight Ave, 175 New Toronto St, 177 New Toronto St, 179 New Toronto St, 181 New Toronto St

Employment · E 1.0 (x54)214.1 × 353.6 m75,593 m²on Birmingham Stcorner, also on Third St

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • Permits or applications open on this parcelRecent records on this lot: 26 142431 (Interior alteration to the existing warehouse office and shipping office. - Unit 2, 2026); 24 133069 (Renovation of warehouse to add electriacl/server room from existing electrical panel walls, 2025); 26 221422 (REVISION - Interior renovation and fit-out of an existing facility for ISO-classified c..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
N50 m
214.1 m frontage353.6 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: listed

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • 3 building permits open, the oldest since 2014

    Needs a closer look

    Still open in the City's records: 24 159328 (Renovation of wharehouse to Electrical Service Room; Related 24133069 FSU 00 FS, 2024, status Permit Issued); 24 110031 (Proposed interior renovation/alteration for tenant improvement for existing warehouse/o..., 2024, status Permit Issued); 14 145605 (Proposal 300 mm domestic water service, which will function as a backup water supply to..., 2014, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 142431 (Interior alteration to the existing warehouse office and shipping office. - Unit 2, 2026); 24 133069 (Renovation of warehouse to add electriacl/server room from existing electrical panel walls, 2025); 26 221422 (REVISION - Interior renovation and fit-out of an existing facility for ISO-classified c..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. A0135/26EYK (To permit self storage warehouses, 2026); A0002/21EYK (To construct three new warehouse buildings, 2021).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

65 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 221422Under Review

    REVISION - Interior renovation and fit-out of an existing facility for ISO-classified cleanrooms and support spaces, including new partitions, cleanroom systems, architectural finishes, HVAC, plumbing, electrical, lighting, fire alarm, sprinkler, and localized structural modifications.Proposal for partial demolition and replacement of existing slab on grade, new foundations for a future second floor, new sub-slab drainage, new exterior concrete pads and foundations for future mechanical equipment, and a structural skeleton of a future 0-hour smoke separation.

    Oct 29, 2026 · 60 BIRMINGHAM ST
  • Zoning review26 198349 ZAPClosed
    Jul 8, 2026 · 60 BIRMINGHAM ST
  • Minor varianceA0135/26EYKApproved

    To permit self storage warehouses.

    Jun 25, 2026 · 60 BIRMINGHAM ST
  • Building permit26 147453Closed

    The proposed work involves the installation of Warehouse Racking within the Warehouse Facility

    May 29, 2026 · 160 DWIGHT AVE
  • Building permit26 142431Inspection

    Interior alteration to the existing warehouse office and shipping office. - Unit 2

    May 28, 2026 · 160 DWIGHT AVE
  • Building permit24 133069Permit Issued

    Renovation of warehouse to add electriacl/server room from existing electrical panel walls.

    Jul 8, 2025 · 175 NEW TORONTO ST
  • Building permit23 229028Closed

    REV01: Propose revision to update beam elevations per constructionInstallation of Storage Rack

    Jun 10, 2025 · 175 NEW TORONTO ST
  • Building permit25 100542Cancelled

    Install 2 first party wall signs **JP Enterprises**

    Jan 3, 2025 · 60 BIRMINGHAM ST
Show 57 older records
  • Building permit24 208579Cancelled

    2 WALL SIGN

    Sep 5, 2024 · 60 BIRMINGHAM ST
  • Building permit24 159328Permit Issued

    Renovation of wharehouse to Electrical Service Room; Related 24133069 FSU 00 FS

    Aug 1, 2024 · 175 NEW TORONTO ST
  • Building permit24 156658Closed

    Installation of solar PV net metering system on existing roof or warehouse

    Aug 1, 2024 · 60 BIRMINGHAM ST
  • Building permit24 145791Closed

    Proposal for the Installation of solar PV net metering system on existing roof or warehouse

    Jul 30, 2024 · 160 DWIGHT AVE
  • Building permit24 145857Closed

    Proposal for the Installation of solar PV net metering system on existing roof or warehouse

    Jul 26, 2024 · 175 NEW TORONTO ST
  • Building permit23 213081Closed

    REV 01: Permit Revision including the removal of private offices, moving the location of the kitchenette and an addition of a washroom.Proposed interior renovation/alteration for tenant improvement for existing Group F2/D occupancy.

    May 23, 2024 · 160 DWIGHT AVE
  • Building permit24 110031Permit Issued

    Proposed interior renovation/alteration for tenant improvement for existing warehouse/office - Industrial T1, Hospital for Sick Kids

    Mar 18, 2024 · 160 DWIGHT AVE
  • Building permit23 198010Closed

    PROPOSED: INSTALLATION OF PALLET RACKING - UNIT 1

    Dec 11, 2023 · 160 DWIGHT AVE
  • Building permit23 194672Closed

    Interior renovation/alteration for tenant improvement for existing Group F2/D occupancy.

    Sep 19, 2023 · 175 NEW TORONTO ST
  • Zoning review22 181595 ZZUClosed
    Jul 25, 2022 · 60 BIRMINGHAM ST
  • Building permit21 144782Closed

    Conditional Permit - FNDPart Permit - Proposed new industrial shell building - Building # 1(part of development for 3 buildings) (RELATED ADDRESSES 160 DWIGHT AVE & 175 NEW TORONTO ST.)-

    Feb 3, 2022 · 60 BIRMINGHAM ST
  • Building permit21 145142Superseded

    Part Permit - Proposed new industrial shell building - Building # 3(part of development for 3 buildings). Formerly 60 Birmingham St.RELATED ADDRESSES 60 BIRMINGHAM & 160 DWIGHT AVE)-FND

    Nov 25, 2021 · 175 NEW TORONTO ST
  • Building permit21 145099Superseded

    Part Permit - Proposed new industrial shell building - Building # 2(part of development for 3 buildings). Formerly 60 Birmingham St, (RELATED ADDRESSES 60 BIRMINGHAM & 175 NEW TORONTO ST.)-FND60 BIRMINGHAM BLD # 1 (Related addresses 160 Dwight Ave & 175 New Toronto St.)

    Nov 25, 2021 · 160 DWIGHT AVE
  • Zoning review20 152169 PSPClosed
    Jul 15, 2021 · 60 BIRMINGHAM ST
  • Minor varianceA0002/21EYKApproved

    To construct three new warehouse buildings.

    Mar 9, 2021 · 60 BIRMINGHAM ST
  • Zoning review20 232990 ZPRClosed
    Dec 22, 2020 · 60 BIRMINGHAM ST
  • Building permit20 204883Closeddemolition

    Proposal to demolish the food processing plant and auxiliary building on the lands including the retention and maintenance of the portions of the south and west facade of the two storey heritage brick building municipally known as 60 Birmingham Street for its its incorporation into the redevelopment of the lands being considered in related site plan application 20 152169 WET 03 SA.

    Nov 18, 2020 · 60 BIRMINGHAM ST
  • Building permit20 188181Closed

    Proposed to temporarily remove portion of building roof structure to remove equipment/permanently remove indoor steel platforms to the existing industrial building.

    Sep 16, 2020 · 60 BIRMINGHAM ST
  • Development application20 152169 WET 03 SAClosed

    3 one-storey buildings proposed for Industrial/warehousing use.

    Jun 4, 2020 · 60 BIRMINGHAM ST · City file
  • Building permit19 160730Closed

    Install one certified tent (14-251055) 15'x15' Hoecker Frame TentAnchored with steel stakes From May 31st to June 2nd 2019

    Jun 11, 2019 · 60 BIRMINGHAM ST
  • Building permit15 162335Closed

    Interior alterations to existing kitchen area of *Campbells*

    Jun 8, 2015 · 60 BIRMINGHAM ST
  • Building permit15 111483Closed

    Proposal to construct addition to existing power plant to house new CHP equipment.

    Feb 25, 2015 · 60 BIRMINGHAM ST
  • Building permit14 145605Inspection

    Proposal 300 mm domestic water service, which will function as a backup water supply to the existing "Campbell's Soup" factory

    May 6, 2014 · 60 BIRMINGHAM ST
  • Building permit13 279561Closed

    Fire alarm panel replacement.

    Dec 27, 2013 · 60 BIRMINGHAM ST
  • Building permit11 241102Closed

    Proposed replacement existing AC unit with new rooftop unit for offices within an existing industrial building. No structural work is being proposed.

    Jul 22, 2011 · 60 BIRMINGHAM ST
  • Building permit11 168226Closed

    Proposed construction of (2) mezzanines, (1) interior and (1) exterior at the 'Power House' building for mechanical services only.

    Apr 28, 2011 · 60 BIRMINGHAM ST
  • Building permit10 215097Closed

    Replace existing AC unit with new rooftop unit for offices in existing industrial building.

    Jul 15, 2010 · 60 BIRMINGHAM ST
  • Building permit10 212370Closed - Dormant

    Interior alteration on ground floor to construct new presentation kitchen room.

    Jul 12, 2010 · 60 BIRMINGHAM ST
  • Building permit10 165175Closed

    Minor 3M2 alterations to an existing roof to Campbell Soup Company to install new roof top AC Unit,

    May 12, 2010 · 60 BIRMINGHAM ST
  • Building permit09 165687Closed

    To install one 20' x 40' certified temporary tent to be used from Sep.05/09 to Sep.23/09 as equipment storage and repair area. Certificate # 08-160898

    Sep 8, 2009 · 60 BIRMINGHAM ST
  • Building permit09 136690Closed

    Replace existing roof top air conditioning unit with new unit. Air conditioner is of the same capacity as existing.

    Jun 9, 2009 · 60 BIRMINGHAM ST
  • Zoning review09 129336 ZPRClosed
    Apr 23, 2009 · 60 BIRMINGHAM ST
  • Zoning review09 129325 ZPRCancelled
    Apr 23, 2009 · 60 BIRMINGHAM ST
  • Building permit08 223302Closed

    Installation of solar panels (approx. 85ft x 20ft) over portion of existing roof. The solar panels will provide additional source of energy.

    Dec 2, 2008 · 60 BIRMINGHAM ST
  • Building permit08 217906Closed

    Install 6 Backflow Devices on city water supplies to Campbell Soup Manufacturing Plant.

    Nov 5, 2008 · 60 BIRMINGHAM ST
  • Building permit08 168777Closed

    HVAC - Installation of a new roof top a/c unit

    Aug 1, 2008 · 60 BIRMINGHAM ST
  • Building permit08 170038Closed

    interior alters for extra access, stair to machine room on main floor

    Jun 18, 2008 · 60 BIRMINGHAM ST
  • Building permit08 103905Closed

    interior renovation of office space located on main floor

    May 14, 2008 · 60 BIRMINGHAM ST
  • Building permit08 150301Closed

    installation of access ladders to service HVAC existing equipment

    May 8, 2008 · 60 BIRMINGHAM ST
  • Building permit08 103483Closed

    Addition of two new windows and replace one existig window.

    Jan 28, 2008 · 60 BIRMINGHAM ST
  • Building permit07 274584Closed

    HVAC - Replace roof top A/C unit to industrial building

    Nov 23, 2007 · 60 BIRMINGHAM ST
  • Building permit06 139636Closed - Dormant

    Construct supports to support a new roof top A/C unit (New A/C System).

    Jun 6, 2006 · 60 BIRMINGHAM ST
  • Building permit05 161633Closed - Dormant

    one storey addition to industrial bldg

    Oct 11, 2005 · 60 BIRMINGHAM ST
  • Building permit05 144327Closed - Dormant

    remove existing 25 ton rooftop unit and replace with 30 ton with 11 VAV boxes & structural reinforcing work to support roof unit

    Jul 19, 2005 · 60 BIRMINGHAM ST
  • Building permit05 112139Closed - Dormant

    an addition to existing chiller BUILDING

    Jun 9, 2005 · 60 BIRMINGHAM ST
  • Building permit04 135164Closednew building

    Construct a 1-storey water chiller.

    Sep 7, 2004 · 60 BIRMINGHAM ST
  • Zoning review04 120944 LTOClosed
    Mar 30, 2004 · 60 BIRMINGHAM ST
  • Building permit03 172177Closed - Dormant

    Plumbing - Interior alteration of a food grade process clean room within an existing industrial building. - Interior Alterations

    Oct 28, 2003 · 60 BIRMINGHAM ST
  • Building permit03 186646Cancelled

    Interior alteration to add mezzanine and platform

    Oct 17, 2003 · 60 BIRMINGHAM ST
  • Building permit02 154794Closed

    Interior and Exterior Alterations to Install New Process Steam Boiler to Campbell's Soup

    Sep 19, 2002 · 60 BIRMINGHAM ST
  • Building permit02 157109Closed - Dormant

    Plumbing - Interior alterations--Kitchen and Washroom Renovation--to Board Room. - Interior Alterations

    Aug 6, 2002 · 60 BIRMINGHAM ST
  • Building permit02 117158Closed

    2 Electro-magnetic Locks to Office area in Industrial Building.

    Mar 19, 2002 · 60 BIRMINGHAM ST
  • Building permit99 084312Closed

    MEZZANINE ADD & INT ALTS TO BOILER PLANT

    Jun 24, 1999 · 60 BIRMINGHAM ST
  • Building permit98 084416Closed

    INT. ALTERATIONS TO INDUSTRIAL BUILDING

    Jun 26, 1998 · 60 BIRMINGHAM ST
  • Building permit96 085600Closed

    ''CAMPBELLS SOUP'' INTERIOR ALTERATIONS

    May 14, 1996 · 60 BIRMINGHAM ST
  • Building permit96 085590Closed

    ''CAMPBELL SOUP'' INTERIOR ALTERATIONS

    May 1, 1996 · 60 BIRMINGHAM ST
  • Building permit95 083588Closed

    ''CAMPBELL SOUP'' INTERIOR ALTERATIONS

    Oct 5, 1995 · 60 BIRMINGHAM ST

Check before you build

  • Site-specific exception 900.20.10(54)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.20.10(54)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    City of Toronto by-law 339-2012.

By-law 569-2013, Chapter 900

Lot facts

Area
75,593 m²
Frontage
214.1 m
Depth
353.6 m
Street
Birmingham St
Corner lot
Yes, also on Third St353.6 m along it
Public lane
None
House footprint
10,411 m²roof up to 21.1 m
Back yard
45 mhouse to rear lot line
Side yards
8 m and 85.8 mhouse to side lot lines
Buildings on the lot
56house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 1.0 (x54) (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
  • 38 City trees in front of this lot. The City's street tree inventory lists 38 trees at this address: apple, sargents (56 cm), apple, sargents (55 cm), linden, littleleaf (52 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
96%22 of 23 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
3
Development applications
2

Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 23 variance decisions: more than at 54% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit self storage warehouses.

    60 BIRMINGHAM ST · Jun 25, 2026 · 179 m away
  • Minor varianceApproved

    To construct a second storey addition above the existing building and a roof top patio.

    1 TOFFEE CRT · Nov 23, 2023 · 480 m away
  • Minor varianceApproved

    To construct a new one-storey addition above the existing building, and a new roof top amenity space.

    1 TOFFEE CRT · Jun 30, 2022 · 480 m away
  • Minor varianceApproved

    To construct three new warehouse buildings.

    60 BIRMINGHAM ST · Mar 9, 2021 · 179 m away

Latest activity nearby

  • Building permit

    REVISION - Interior renovation and fit-out of an existing facility for ISO-classified cleanrooms and support spaces, including new partitions, cleanroom systems, architectural finishes, HVAC, plumbing, electrical, lighting, fire alarm, sprinkler, and localized structural modifications.Proposal for partial demolition and replacement of existing slab on grade, new foundations for a future second floor, new sub-slab drainage, new exterior concrete pads and foundations for future mechanical equipment, and a structural skeleton of a future 0-hour smoke separation.

    60 BIRMINGHAM ST · Oct 29, 2026 · 179 m away
  • Building permit

    Proposal to install a backwater valve.

    139 LAKE CRES · Oct 22, 2026 · 197 m away
  • Building permit

    Proposal to construct a new loading dock to existing food bank storage facility - Daily Bread Food Bank

    191 NEW TORONTO ST · Aug 10, 2026 · 242 m away
  • Zoning review

    Closed

    84 MURRIE ST · Jul 22, 2026 · 251 m away
  • Building permit

    1 Wall Sign ** DAILY BREAD FOOD BANK / COMMUNITY FOOD HUB **

    191 NEW TORONTO ST · Jul 20, 2026 · 242 m away
  • Zoning review

    Closed

    60 BIRMINGHAM ST · Jul 8, 2026 · 179 m away
  • Minor varianceApproved

    To permit self storage warehouses.

    60 BIRMINGHAM ST · Jun 25, 2026 · 179 m away
  • Building permitnew building, new house

    Proposal to demolish existing dwelling and construct a new two-storey single family dwelling with front covered porch and rear deck.See also 26-134379 DEM 00 DM and 25-111085 ZAP 00 ZR

    177 SYMONS ST · Jun 4, 2026 · 172 m away
  • Building permit

    The proposed work involves the installation of Warehouse Racking within the Warehouse Facility

    160 DWIGHT AVE · May 29, 2026 · 75 m away
  • Building permit

    Interior alteration to the existing warehouse office and shipping office. - Unit 2

    160 DWIGHT AVE · May 28, 2026 · 75 m away

Neighbourhood: New Toronto

About the area around the lot, not the lot itself.

Nearest station
Mimico GO Station19 min walk
Nearest TTC stop
Islington Ave at New Toronto St7 min walk
Nearest cycling route
Birmingham StCycle Track, 3 min walk
Nearest traffic count
1,850 vehicles in 8 hDwight Ave / Symons St, 120 m away, Oct 21, 2021
Serious collisions within 500 m
12021–2026, killed or seriously injured: 1 fatal, 1 with pedestrians, 0 with cyclists
Parks
Hillside Park4 min walk
Lamp Ground5 min walk
Sixth Street Park7 min walk

Schools within 1 km

  • SECOND STREET JR MDL SCHOOL English Public 5 min walk
  • SEVENTH STREET JR SCHOOL English Public 12 min walk
  • CHILDREN'S URBAN ENRICHMENT STUDIO Private 13 min walk
  • JOHN ENGLISH JR MDL SCHOOL English Public 13 min walk
  • MIMICO ADULT CENTRE English Public 14 min walk
  • ST LEO CATHOLIC ELEMENTARY SCHOOL (FUTURE ADDRESS FOR MAIN ENTRANCE) English Separate 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureNew TorontoMedian neighbourhood
Median household income (2020)$68,500$84,500
Households that own their home44%54%
Population (2021)11,34516,813
Homes built in 1960 or before45%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleNew TorontoCity median
Assault903.2636.3
Robbery76.569.5
Shootings15.310.5
Auto theft145.4192.6
Theft over $5,00091.946.1
Break and enter183.7172.8
Theft from vehicles244.9188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.