HousePrecheckCheck an address

6 Mulock AveToronto · zoning, lot size and permit records

Also 20 Mulock Ave, 22 Mulock Ave, 26 Mulock Ave, 2 Mulock Ave, 32 Mulock Ave and 1 more

36.5 × 87.3 m3,155 m²on Junction Rdcorner, also on Mulock Avebacks onto Ln E Keele S Hirons

Not a home

A commercial or mixed-use building

7 different civic addresses share this parcel, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 133643 (Proposal to extend sprinkler systems into unprotected places on basement, ground & 2nd..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 4 development applications open within 300 m, up to 39 storeysNew buildings may go up around here in the next years. More change nearby than at 97% of Toronto houses.
N50 m
36.5 m frontage87.3 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 133643 (Proposal to extend sprinkler systems into unprotected places on basement, ground & 2nd..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 39 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

9 records on file: more than at 99% of Toronto houses (median 0).

  • Building permit26 133643Inspection

    Proposal to extend sprinkler systems into unprotected places on basement, ground & 2nd floor areas.

    Mar 30, 2026 · 22 MULOCK AVE
  • Building permit26 118358Cancelled

    Extend existing basement, ground and 2nd floor sprinkler systems into unprotected paces.

    Feb 18, 2026 · 22 MULOCK AVE
  • Building permit18 179804Closed

    Revision 01: addition of windows to the east elevation.

    Apr 30, 2021 · 6 MULOCK AVE
  • Building permit18 229012Closed

    Proposal to construct a two storey addition to existing single storey laundry processing plant. Scope included rebuilding of area damaged by fire.

    Jan 14, 2020 · 20 MULOCK AVE
  • Building permit17 211443Closed

    Proposed Industrial Elevator Shaft Construction (Not for use to transport people)

    Aug 23, 2017 · 32 MULOCK AVE
  • Building permit17 181919Closeddemolition

    Proposal to demolish existing industrial structure due to fire damages.

    Jul 12, 2017 · 22 MULOCK AVE
  • Zoning review17 164112 ZZCClosed
    May 23, 2017 · 22 MULOCK AVE
  • Building permit10 153214Closed

    Remove an existing window and install roll-up garage door to the west elevation of an industrial building.

    May 13, 2010 · 54 JUNCTION RD
Show 1 older records
  • Zoning review09 127570 LTOClosed
    Apr 20, 2009 · 54 JUNCTION RD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
3,155 m²
Frontage
36.5 m
Depth
87.3 m
Street
Junction Rd
Corner lot
Yes, also on Mulock Ave87.3 m along it
Public lane
Ln E Keele S Hirons, 97.2 m along it
House footprint
953 m²roof up to 14.3 m
Back yard
0 mhouse to rear lot line
Side yards
0 m and 0.1 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
3house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    94%15 of 16 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    9
    Development applications
    14

    Within 300 m, last 10 years. 9 suite and multiplex permits: more than at 72% of Toronto houses (median 3). 16 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      The subject site will contain one residential apartment building and one non-residential building, connected by an underground parking garage (Level P1). This application is to alter the development standards for the 29-storey residential apartment building (Building 'A'), approved under Site Specific Zoning By-Law 1289-2022(OLT), by increasing the height (at the southeast corner of the tower that will have stepping down of heights), number of storeys (from 29-storeys to 36-storeys), total gross floor area on-site, total residential gross floor area on-site, number of dwelling units, and permitted balcony projections (on the east and west sides of the building). Also, to permit reducing building setbacks, separation distances, and the number of long-term and short-term residential bicycle parking spaces. There will be a total of 452 residential dwelling units on the lot (within Building 'A'). It should be noted that the 6-storey non-residential building (Building 'B') will be maintained as approved under the Site Specific By-law. A Site Plan Control application (File Number 20 22 140254 STE 09 SA) is currently under review.

      290 OLD WESTON RD · Aug 5, 2026 · 429 m away
    • Minor varianceApproved

      To alter the development standards for the eight-storey mixed-use building currently under construction (as approved under Site Specific Zoning By-Law 898-2021), by increasing the maximum permitted interior floor area for all retail services (to accommodate a commercial gym located on the second storey), and reducing the minimum length of two parking spaces located on level P2 of the underground parking garage. There will be a total of 120 residential dwelling units on this lot.

      2946 DUNDAS ST W · Jul 8, 2026 · 389 m away
    • Minor varianceApproved

      To maintain the existing semi-detached dwelling.

      499 KEELE ST · Apr 23, 2026 · 94 m away
    • Minor varianceApproved

      To maintain the existing semi-detached dwelling.

      499 KEELE ST · Apr 23, 2026 · 94 m away
    • Minor varianceApproved

      To convert the existing rear one-storey detached ancillary building (three-car garage, abutting the laneway) into a two-storey ancillary building (containing a one-car garage on the ground level, and one laneway suite that will occupy the north portion of the ground level and the second storey), by constructing a second storey addition with a second story balcony (located at the west side of the building). There will be a total of three residential dwelling units on this lot (two units within the detached main dwelling and one unit within the ancillary building).

      8 FORD ST · Mar 18, 2026 · 406 m away

    Latest activity nearby

    • Zoning review

      Closed

      409 KEELE ST · Nov 4, 2026 · 186 m away
    • Zoning review

      Closed

      26 CAWTHRA AVE · Nov 3, 2026 · 107 m away
    • Zoning review

      Closed

      545 KEELE ST · Oct 6, 2026 · 257 m away
    • Zoning review

      Closed

      43 JUNCTION RD · Sep 22, 2026 · 108 m away
    • Building permit

      Proposal to demolish the existing detached private garage in the rear yard and construct a new detached private garage in the rear yard.

      531 KEELE ST · Sep 1, 2026 · 183 m away
    • Building permit

      REVISION - as per the attached cover letterInterior alteration including associated mechanical, electrical, plumbing and structural work. New exterior cladding on west and part of north facade with no alteration to exterior wall assembly performance.

      388 KEELE ST · Jul 27, 2026 · 293 m away
    • Building permit

      Proposal to demolish the existing detached private garage in the rear yard and construct a new detached private garage in the rear yard.

      531 KEELE ST · Jul 24, 2026 · 183 m away
    • Building permit

      Proposal for addition to front entrance, interior alteration for lunchroom

      573 KEELE ST · Jul 23, 2026 · 292 m away
    • Building permit

      Proposal to add a new 1 1/2 hour fire rated exit door in the infant 2 classroom, and have added a 45 min. fire rated door to the first floor kitchen. Scope also includes fire acess route to satisfy requirements of Toronto Fire Services.

      51 VINE AVE · Jun 11, 2026 · 295 m away
    • Zoning review

      Closed

      530 KEELE ST · May 19, 2026 · 178 m away

    Neighbourhood: Junction Area

    About the area around the lot, not the lot itself.

    Nearest station
    Keele Station25 min walk
    Nearest TTC stop
    Keele St at Junction Rd1 min walk
    Nearest cycling route
    Davenport RdBike Lane, 6 min walk
    Nearest traffic count
    15,586 vehicles in 8 hKeele St / Junction Rd, 90 m away, Feb 1, 2022
    Serious collisions within 500 m
    12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
    Parks
    Keele - Mulock Parkette6 min walk
    Vine Avenue Playground6 min walk
    Constable Percy Cummins Parkette7 min walk

    Schools within 1 km

    • THE GREAT LAKES COLLEGE SCHOOL Private 8 min walk
    • LUCY MCCORMICK SR SCHOOL English Public 9 min walk
    • CARLETON VILLAGE JR & SR PUBLIC SCHOOL English Public 9 min walk
    • ST RITA CATHOLIC ELEMENTARY SCHOOL & MSGR FRASER SOUTHWEST English Separate 12 min walk
    • INDIAN ROAD CRESCENT JR PUBLIC SCHOOL English Public 13 min walk
    • ECOLE ELEMENTAIRE CHARLES SAURIOL French Public 13 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureJunction AreaMedian neighbourhood
    Median household income (2020)$96,000$84,500
    Households that own their home58%54%
    Population (2021)14,01016,813
    Homes built in 1960 or before55%29%
    Homes needing major repairs7%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleJunction AreaCity median
    Assault908.1636.3
    Robbery74.669.5
    Shootings6.210.5
    Auto theft236.4192.6
    Theft over $5,00087.146.1
    Break and enter304.8172.8
    Theft from vehicles578.5188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.