HousePrecheckCheck an address

6 Horton BlvdToronto · zoning, lot size and permit records

Open space · O≈ 34.7 × 60.6 m1,171 m²on Horton Blvd

Not a home

A park or open space

The zoning by-law sets this parcel aside for parks and open space. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • 1 development application open within 300 m, up to 13 storeysNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.
N20 m
≈ 34.7 m frontage≈ 60.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet, including buildings of up to 13 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Lot facts

Area
1,171 m²
Frontage
34.7 mestimated, irregular lot
Depth
60.6 mestimated, irregular lot
Street
Horton Blvd
Corner lot
No
Public lane
None
Max height
11 m
Max lot coverage
33%
  • Zone O (Open Space). Chapter 90, section 90.10 of the by-law. Source

Around this lot

Minor variances approved
60%3 of 5 decisions
Garden suite permits
3
Laneway suite permits
0
Multiplex permits
2
Development applications
5

Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Building permitgarden suite

    Proposed new detached two-story garden suite, without a basement, in the rear yard of the existing detached dwelling

    55 CENTURY DR · Nov 23, 2026 · 294 m away
  • Zoning review

    Application On Hold

    1035 DANFORTH RD · Sep 28, 2026 · 255 m away
  • Zoning review

    Closed

    2815 EGLINTON AVE E · Sep 24, 2026 · 179 m away
  • Building permitsecondary suite

    REV01: Proposed revision interior alterations changes to plan and rear addition.Proposed second floor dwelling unit addition to existing bungalow house w/ related plumbing and HVAC.

    39 HORTON BLVD · Jul 24, 2026 · 224 m away
  • Zoning review

    Applicable Law Pending

    1256 DANFORTH RD · Jun 10, 2026 · 268 m away
  • Zoning review

    Applicable Law Pending

    1256 DANFORTH RD · Jun 10, 2026 · 268 m away
  • Building permit

    PROPOSED INTERIOR ALTERATION TO CHANGE FROM OFFICE/ GROUP D OCCUPANCY TO VACANT UNIT.

    2815 EGLINTON AVE E · Jun 8, 2026 · 179 m away
  • Building permit

    Revision #2 Re-use the windows on the west side.REVISION - revised layout as per the bubbled drawingsProposal for interior alterations to convert Restaurant into a Doctors Office.

    2829 EGLINTON AVE E · Apr 21, 2026 · 222 m away
  • Building permit

    Proposal for interior alterations for a new restaurant with 10 seats.

    1071 DANFORTH RD · Nov 27, 2025 · 97 m away
  • Building permit

    It is proposed to extend the permissible travel distance to an exit by 4.3 m, to 19.3 m.

    2742 EGLINTON AVE E · Nov 18, 2025 · 171 m away

Neighbourhood: Eglinton East

About the area around the lot, not the lot itself.

Nearest station
Eglinton GO Station20 min walk
Nearest TTC stop
Danforth Rd at Horton Blvd1 min walk
Nearest cycling route
McCowan District Park TrlMulti-Use Trail, 10 min walk
Nearest traffic count
36,110 vehicles in 14 hDanforth Rd / Eglinton Ave E, 110 m away, Nov 2, 2024
Serious collisions within 500 m
102021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 0 with cyclists
Parks
6 Horton Boulevard Park1 min walk
Horton Park4 min walk
Trudelle Street Park8 min walk

Schools within 1 km

  • WALTER PERRY JR PUBLIC SCHOOL English Public 8 min walk
  • PERE PHILIPE LAMARCHE CATHOLIC SECONDARY SCHOOL French Separate 9 min walk
  • GLEN RAVINE JR PUBLIC SCHOOL English Public 11 min walk
  • ROBERT SERVICE SR PUBLIC SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEglinton EastMedian neighbourhood
Median household income (2020)$73,500$84,500
Households that own their home47%54%
Population (2021)22,53516,813
Homes built in 1960 or before23%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEglinton EastCity median
Assault825.8636.3
Robbery65.669.5
Shootings15.410.5
Auto theft270.1192.6
Theft over $5,00061.746.1
Break and enter150.5172.8
Theft from vehicles559.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.