HousePrecheckCheck an address

6 Bonnington PlToronto · zoning, lot size and permit records

12.8 × 34.4 m441 m²on Bonnington Pl

Not a home

Future Road

The City of Toronto's real estate inventory lists Future Road here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Transit, rail or parkingGood access, with trains, buses or cars and some noise.
  • 8 development applications open within 300 m, up to 49 storeysNew buildings may go up around here in the next years. More change nearby than at 95% of Toronto houses.
N10 m
12.8 m frontage34.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 8 development applications open within 300 m

    Good to know

    8 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 49 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

1 records on file: more than at 53% of Toronto houses (median 0).

  • Building permit17 239919Closeddemolition

    Proposal to demolish existing 2 storey SFD. No replacement dwelling.

    Nov 22, 2017 · 6 BONNINGTON PL

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
441 m²
Frontage
12.8 m
Depth
34.4 m
Street
Bonnington Pl
Corner lot
No
Public lane
None
House footprint
80 m²roof up to 8.4 m
Back yard
21.5 mhouse to rear lot line
Side yards
1.1 m and 2.5 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    79%19 of 24 decisions
    Garden suite permits
    2
    Laneway suite permits
    1
    Multiplex permits
    0
    Development applications
    10

    Within 300 m, last 10 years. 3 suite and multiplex permits: no more than at most Toronto houses (median 3). 24 variance decisions: more than at 55% of Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To alter the existing detached dwelling by constructing a new front porch in conjunction with alterations to the front yard landscaping.

      41 ANNDALE DR · Sep 17, 2026 · 158 m away
    • Minor varianceApproved

      To construct a new detached dwelling with a partially covered rear deck.

      9 LYNDALE DR · Sep 17, 2026 · 99 m away
    • Minor varianceApproved with conditions

      To convert the existing two-storey detached dwelling into a place of worship.

      12 FLORENCE AVE · Aug 6, 2026 · 436 m away
    • Minor varianceApproved

      The Revised proposal consists of a series of minor changes to Building B of the Oakburn North Development. Increased height of Building B, an increase in number of units and GFA, and reduced visitor parking. Please note, the application was deferred, on February 5, 2026, to allow the applicant to update materials and discuss w/ neighbours.

      12 OAKBURN CRES · Mar 26, 2026 · 339 m away
    • Minor varianceApproved

      To request relief from the provisions of City of Toronto Zoning By-law No. 569-2013, as amended by By-law No. 479-2022, including height and gross floor area, to faciltate the development of a 11-storey mixed-use building with 115 residential units and retail space at-grade.

      105 SHEPPARD AVE E · Aug 14, 2025 · 253 m away

    Latest activity nearby

    • Minor variancePending

      To permit a dental clinic within the existing building.

      33 SHEPPARD AVE E · Nov 26, 2026 · 161 m away
    • Building permit

      Proposal for construction of a secure storage room, reception area, secure doors and new door to games room.

      100 SHEPPARD AVE E · Nov 23, 2026 · 269 m away
    • Building permitdemolition, secondary suite

      New house with second unit

      9 LYNDALE DR · Nov 6, 2026 · 99 m away
    • Building permitnew building, new house, secondary suite

      Proposed new single family detached house with a secondary suite, an integral garage, a front covered porch and rear partially covered deck.

      9 LYNDALE DR · Nov 6, 2026 · 99 m away
    • Building permit

      Proposed interior alterations to elevator lobbies, washrooms and corridors

      4711 YONGE ST · Nov 5, 2026 · 280 m away
    • Building permit

      Proposal for Kitec replacement in an existing residential suite - UNIT 1710

      33 SHEPPARD AVE E · Oct 30, 2026 · 161 m away
    • Building permit

      Proposed Kitec Replacement

      33 SHEPPARD AVE E · Oct 27, 2026 · 161 m away
    • Building permit

      Proposed front porch, steps and walkway

      41 ANNDALE DR · Oct 21, 2026 · 158 m away
    • Building permit

      To demolish detached garage

      99 GLENDORA AVE · Oct 20, 2026 · 204 m away
    • Building permit

      Localized waterproofing and concrete repairs to the parking garage.

      4711 YONGE ST · Oct 20, 2026 · 280 m away

    Neighbourhood: Avondale

    About the area around the lot, not the lot itself.

    Nearest station
    Sheppard-Yonge Station4 min walk
    Nearest TTC stop
    Sheppard Ave East at Doris Ave3 min walk
    Nearest cycling route
    Sheppard Ave ECycle Track, 2 min walk
    Nearest traffic count
    5,847 vehicles in 14 hTradewind Ave / Anndale Dr, 40 m away, Mar 25, 2026
    Serious collisions within 500 m
    52021–2026, killed or seriously injured: 0 fatal, 3 with pedestrians, 0 with cyclists
    Parks
    Avonshire Parkette4 min walk
    Glendora Park5 min walk
    Willowdale Park5 min walk

    Schools within 1 km

    • RUTHERFORD PRIVATE SCHOOL AND DAYCARE Private 4 min walk
    • TORONTO DISTRICT SCHOOL BOARD - OAKBURN CENTRE English Public 7 min walk
    • CARDINAL CARTER ACADEMY FOR THE ARTS English Separate 7 min walk
    • CROWN ACADEMIC INTERNATIONAL SCHOOL Private 7 min walk
    • ELPIS COLLEGE TORONTO (temporarily moved) Private 7 min walk
    • TORONTO CENTRAL ACADEMY SECONDARY SCHOOL Private 9 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureAvondaleMedian neighbourhood
    Median household income (2020)$84,000$84,500
    Households that own their home58%54%
    Population (2021)13,79016,813
    Homes built in 1960 or before6%29%
    Homes needing major repairs3%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleAvondaleCity median
    Assault508.3636.3
    Robbery30.369.5
    Auto theft66.6192.6
    Theft over $5,00018.246.1
    Break and enter108.9172.8
    Theft from vehicles108.9188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.