HousePrecheckCheck an address

59 Vinci CresToronto · zoning, lot size and permit records

Residential multiple · RM (f21.0; a925; d0.85) (x474)50.0 × 77.5 m3,530 m²on Faywood Blvdcorner, also on Vinci Cres

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 33 rental units, built 1960More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • City upkeep score: 94 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.
  • Major Transit Station Area: WilsonThe City plans more homes around the station: good for transit, and more building over time.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N20 m
50.0 m frontage77.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Adequate Heat, Property Standards): 26 173317 000 00 IR (Adequate Heat, 2026); 26 173316 000 00 IR (Property Standards, 2026); 24 248820 PRS 00 IR (Property Standards, 2024).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 2 Committee of Adjustment files on this lot

    Good to know

    2 approved. A0303/10NY (This is an application to permit the existing apartment building to be maintained as co..., 2010); B0029/10NY (This is an application for the division of a parcel of residential lands into five (5)..., 2010).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • Rental building evaluation: 94 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2026 (4 storeys, 33 units, built 1960).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

11 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 173317 000 00 IRClosed

    Adequate Heat

    Jun 1, 2026 · 59 VINCI CRES
  • By-law investigation26 173316 000 00 IRClosed

    Property Standards

    Jun 1, 2026 · 59 VINCI CRES
  • By-law investigation25 214625 WST 00 IRClosed

    Waste

    Aug 22, 2025 · 59 VINCI CRES
  • By-law investigation24 248820 PRS 00 IRClosed

    Property Standards

    Dec 10, 2024 · 59 VINCI CRES
  • Zoning review19 112487 LPRClosed
    Feb 6, 2019 · 59 VINCI CRES
  • Minor varianceA0303/10NYApproved

    This is an application to permit the existing apartment building to be maintained as constructed on a lot created by severance.

    Jul 21, 2010 · 59 VINCI CRES
  • Consent (lot split)B0029/10NYApproved

    This is an application for the division of a parcel of residential lands into five (5) parts for conveyance purposes to allow each of the existing apartment buildings to be held in separate ownership and for the granting of easements/rights-of-way.

    Jul 21, 2010 · 59 VINCI CRES
  • Zoning review10 106930 ZPRClosed
    Jan 20, 2010 · 59 VINCI CRES
Show 3 older records
  • Zoning review09 190535 ZPRClosed
    Nov 23, 2009 · 59 VINCI CRES
  • Building permit06 184201Cancelled

    Construct interiror alterations (497.23m2) to an exisiting apartment building to create 6 additional dwelling units

    Oct 17, 2006 · 59 VINCI CRES
  • Building permit95 090086Closed

    RETROFIT-FIRE ALARM SYS

    Jun 11, 1996 · 59 VINCI CRES

Check before you build

  • Site-specific exception 900.6.10(474)

    Needs a closer look

    1 older by-law that still prevails applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.6.10(474)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Schedule 'D' Airport Hazard Map from City of North York zoning by-law 7625.

By-law 569-2013, Chapter 900

Lot facts

Area
3,530 m²
Frontage
50 m
Depth
77.5 m
Street
Faywood Blvd
Corner lot
Yes, also on Vinci Cres77.5 m along it
Public lane
None
House footprint
871 m²roof up to 14.3 m
Back yard
10.3 mhouse to rear lot line
Side yards
11.2 m and 17.5 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
35%

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Major Transit Station Area: Wilson. The lot is inside the Wilson Major Transit Station Area approved by the Province (Site and Area Specific Policy 712). Source
  • Minimum frontage 21 m. Frontage is about 50.0 m: meets the zone minimum. Source
  • Minimum lot area 925 m². Lot area is 3,530 m²: meets the minimum. Source
  • Zone RM (f21.0; a925; d0.85) (x474) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source
  • 15 City trees in front of this lot. The City's street tree inventory lists 15 trees at this address: maple, norway schwedler (45 cm), maple, norway schwedler (37 cm), maple, norway schwedler (36 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
81%17 of 21 decisions
Garden suite permits
3
Laneway suite permits
0
Multiplex permits
3
Development applications
3

Within 300 m, last 10 years. 6 suite and multiplex permits: more than at 64% of Toronto houses (median 3). 21 variance decisions: more than at 52% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    This is an application to permit the existing apartment building to be maintained as constructed on a lot created by severance.

    59 VINCI CRES · Jul 21, 2010 · 5 m away
  • Minor varianceApproved

    This is an application to permit the existing apartment building to be maintained as constructed on a lot created by severance.

    55 FAYWOOD BLVD · Jul 21, 2010 · 45 m away
  • Minor varianceApproved

    This is an application to permit the existing apartment building to be maintained as constructed on a lot created by severance.

    30 VINCI CRES · Jul 21, 2010 · 106 m away
  • Minor varianceApproved

    This is an application to permit the existing apartment building to be maintained as constructed on a lot created by severance.

    45 FAYWOOD BLVD · Jul 21, 2010 · 117 m away
  • Minor varianceApproved

    This is an application to permit the existing apartment building to be maintained as constructed on a lot created by severance.

    8 VINCI CRES · Jul 21, 2010 · 185 m away

Latest activity nearby

  • Building permit

    Proposal for Tree Damage Restoration

    50 WIGAN CRES · Nov 10, 2026 · 112 m away
  • Building permit

    Proposal to demolish existing detached garage and construct a new 2-storey rear and side addition and interior alterations.

    126 INVERMAY AVE · Sep 24, 2026 · 155 m away
  • Building permitdemolition

    Proposal to demolish the existing dwelling

    16 FAITH AVE · Sep 24, 2026 · 256 m away
  • Building permitmultiplex, new building, new house

    Proposal to demolish the existing dwelling and construct a 3 storey multiplex (4 units)

    16 FAITH AVE · Sep 24, 2026 · 256 m away
  • Building permitdemolition

    Proposal to demolish existing house and construct a new three-storey four-unit dwelling.

    24 GOODWILL AVE · Sep 8, 2026 · 226 m away
  • Building permitmultiplex, new building, new house

    Proposal to demolish existing house and construct a new three-storey four-unit dwelling.

    24 GOODWILL AVE · Sep 8, 2026 · 226 m away
  • Building permitgarden suite

    Building a garden suite in the back yard

    24 GOODWILL AVE · Sep 4, 2026 · 226 m away
  • Building permitgarden suite

    BUILDING A GARDEN SUITE IN THE BACK YARD

    16 FAITH AVE · Sep 3, 2026 · 256 m away
  • Zoning review

    Closed

    15 FAITH AVE · Aug 13, 2026 · 202 m away
  • Zoning review

    Closed

    126 INVERMAY AVE · Aug 5, 2026 · 155 m away

Neighbourhood: Clanton Park

About the area around the lot, not the lot itself.

Nearest station
Wilson Station8 min walk
Nearest TTC stop
Faywood Blvd at Goodwill Ave2 min walk
Nearest cycling route
Faywood BlvdSharrows, 1 min walk
Nearest traffic count
7,936 vehicles in 8 hWilson Heights Blvd / Goodwill Ave, 270 m away, Feb 2, 2017
Serious collisions within 500 m
52021–2026, killed or seriously injured: 1 fatal, 4 with pedestrians, 0 with cyclists
Parks
Faywood Park4 min walk
Wilson Heights Park8 min walk
Milton Berger Park8 min walk

Schools within 1 km

  • FAYWOOD ARTS BASED CURRICULUM SCHOOL English Public 4 min walk
  • YESHIVA DARCHEI TORAH SCHOOL Private 7 min walk
  • YESHIVA BNEI TZION OF BOBOV SCHOOL Private 10 min walk
  • YESHIVA OR CHAIM BNEI AKIVA BOYS SCHOOL Private 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureClanton ParkMedian neighbourhood
Median household income (2020)$88,000$84,500
Households that own their home54%54%
Population (2021)17,62016,813
Homes built in 1960 or before25%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleClanton ParkCity median
Assault584.1636.3
Robbery9569.5
Shootings4.710.5
Auto theft185.2192.6
Theft over $5,00090.246.1
Break and enter133172.8
Theft from vehicles194.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.