59 St George StToronto · zoning, lot size and permit records

85.5 × 60.7 m4,577 m²on St George St

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 109971 (Proposal for a Wifi, fibre and associated electrical services upgrade at Knox College...., 2026); 25 224689 (Design, supply and install a new wet sprinkler system for the ground and second floor e..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
N50 m
85.5 m frontage60.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Heritage property: designated (Part IV)

    Needs a closer look

    On the City's Heritage Register. Demolition and exterior changes need heritage review.

    What it means. Renovations, additions and demolition can take longer, cost more or be refused.

    How to confirm. Heritage Planning at the City confirms the status and what it covers. Details

    City of Toronto Heritage Register
  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 109971 (Proposal for a Wifi, fibre and associated electrical services upgrade at Knox College...., 2026); 25 224689 (Design, supply and install a new wet sprinkler system for the ground and second floor e..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

14 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit26 109971Permit Issued

    Proposal for a Wifi, fibre and associated electrical services upgrade at Knox College. It includes the upgrade of existing LAN closets with new finishes, including anti-static flooring, and maintaining existing fire separations. New pathways from the existing basement IT room to IT closets on each floor, and will utilize existing floor slab openings to run new infrastructure. As well, the College is introducing two new wireless access points in its central courtyard, which are concealed in a bollard sleeve in the existing garden beds.

    Feb 24, 2026 · 59 ST GEORGE ST
  • Building permit24 227046Closed

    Revision 01: Scope of revision attached in memo PDF. NEW INTERIOR ALTERATION OF EXISTING OFFICE SUITE, AS PART OF PREVIOUS DEMOLITION PERMIT. THE NORTHWEST GROUND FLOOR OFFICE SUITE AND BASEMENT AREA WILL BE RENOVATED TO ACCOMODATE NEW INTERIOR PARTITIONS, WASHROOMS, AND TO IMPROVE EXITING CONDITIONS. NEW HVAC IS PROPOSED TO IMPROVE EFFICIENCY AND OCCUPANT COMFORT.

    Dec 1, 2025 · 59 ST GEORGE ST
  • Building permit25 224689Permit Issued

    Design, supply and install a new wet sprinkler system for the ground and second floor exit stair. Relocate 2 FHC and connect to the existing standpipe piping. The starting point for the sprinkler system installation at the 4" flange connection in the sprinkler room. The starting point for the relocation of FHC is at the existing stadpipe piping. Existing 5 storey Building. OBC Group A2 and D. Reference BLD permit 24 227046 BLD 00 BA.

    Oct 6, 2025 · 59 ST GEORGE ST
  • Building permit25 147627Closed

    Proposal for renovation of existing rooms in the basement to construct a main Information Technology room.

    Jun 2, 2025 · 59 ST GEORGE ST
  • Building permit24 189267Closed

    Proposal for interior alterations for demolition of existing office space in an existing Univeristy.

    Sep 25, 2024 · 59 ST GEORGE ST
  • Building permit23 148792Closed

    Installation of one 20' x45' tent at Universtiy of Toronto for their June convocation. Tent will be anchored with ballast. Installation to begin on May 29, 2023 and removal with begin on June 23, 2023,

    May 24, 2023 · 59 ST GEORGE ST
  • Development application16 221931 STE 20 OZClosed

    Official Plan Amendment application to establish a new University of Toronto St. George Campus Secondary Plan that would replace the existing University of Toronto Secondary Plan.

    Sep 13, 2016 · 59 ST GEORGE ST · City file
  • Building permit13 150799Closed

    Proposal for interior alterations to washrooms in both residential and administrative areas in existing university building for "Knox College". Proposal also includes the construction of underground areaways for mechanical louvers.

    May 9, 2013 · 59 ST GEORGE ST
Show 6 older records
  • Building permit10 122860Closed

    Proposal to install one backflow prevention device in existing university building for "Knox College".

    Mar 30, 2010 · 59 ST GEORGE ST
  • Building permit07 183129Cancelled

    Erect temporary certified tent (U of T); Certificate #06-159975

    Apr 30, 2007 · 59 ST GEORGE ST
  • Building permit06 127908Closed

    Erect temporary tent 40' x 60'.

    May 8, 2006 · 59 ST GEORGE ST
  • Building permit04 125833Closed

    Erect temporary certified tent (U of T); Erect on May 10/04 to May 13/04. Certificate #975501.

    Apr 22, 2004 · 59 ST GEORGE ST
  • Zoning review04 113537 LTOClosed
    Mar 4, 2004 · 59 ST GEORGE ST
  • Zoning review93 024588 LTOClosed
    Jan 4, 1993 · 59 ST GEORGE ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
4,577 m²
Frontage
85.5 m
Depth
60.7 m
Street
St George St
Corner lot
No
Public lane
None
House footprint
2,274 m²roof up to 25.9 m
Back yard
0 mhouse to rear lot line
Side yards
0.6 m and 2.3 mhouse to side lot lines
Buildings on the lot
6house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

    Around this lot

    Minor variances approved
    100%5 of 5 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    0
    Development applications
    2

    Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 5 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To construct a new two-storey detached ancillary building (containing one garden suite), with a cantilevered second storey in the rear yard. There will be a total of five residential dwelling units on this lot (four units within the main dwelling, and one unit within the ancillary building).

      23 ROSS ST · Apr 1, 2026 · 392 m away
    • Minor varianceApproved

      To convert the existing two-storey detached main dwelling into a mixed-use building through interior alterations to permit a restaurant (café) use within the ground floor of the building. Also, to construct a new two-storey detached ancillary building (containing one laneway suite with bedrooms within the basement below) in the rear yard, abutting the Public laneway. There will be a total of two residential dwelling units on this lot (one in the main dwelling and one in the laneway suite).

      356 HURON ST · Dec 10, 2025 · 428 m away
    • Minor varianceApproved

      To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a front covered porch, a front three-storey addition, a rear ground floor deck, rear second and third storey terraces, and a rear third storey addition. There will be a total of two residential dwelling units (duplex) on this lot.

      91 WILLCOCKS ST · Oct 16, 2024 · 468 m away
    • Minor varianceApproved

      To alter the existing building by constructing a three-storey addition above the one-storey portion of the building.

      70 ST GEORGE ST · Sep 6, 2023 · 68 m away
    • Minor varianceApproved

      To alter the existing two-storey townhouse dwelling by constructing a complete third storey addition, rear and side additions to the first, second and third floors, and a rear ground level deck.

      71 ROBERT ST · Jan 18, 2023 · 487 m away

    Latest activity nearby

    • Building permit

      Proposal for the replacment of three (3) air handling units and one (1) cooling tower

      80 ST GEORGE ST · Nov 10, 2026 · 109 m away
    • Building permit

      REV : Proposed revision include coordinated revised drawings of laboratory, classroom, office and lounge spaces to reflect minor modifications required due to numerous site conditions found during construction at the existing university building. Proposal for interior building alterations - demolition. Removal of non-structural partitions, casework, finishes, mechanical ducting, plumbing, electrical in preparation for new work

      25 HARBORD ST · Nov 3, 2026 · 298 m away
    • Building permit

      Revision 01 - Revision to delete all layout, fixutres, and finishes for Wallberg Men¿s Washroom 252A, add new layout, fixtures, and finishes for Wallberg New Private Washroom 1 252A and Wallberg NewPrivate Washroom 2 252C.--------------------------------------------------------------Proposal for interior alterations to three washrooms on the second floor in the Wallberg Building

      184 COLLEGE ST · Nov 2, 2026 · 282 m away
    • Building permit

      Proposal for fire protection sprinkler system alteration.

      110 ST GEORGE ST · Oct 21, 2026 · 258 m away
    • Building permit

      Proposal to erect a temporary stage for Run For The Cure For CancerInstallation Date: October 03, 2026; Tear Down: October 04, 2026

      1 KING'S COLLEGE CRCL · Oct 5, 2026 · 196 m away
    • Building permit

      Proposed interior alterations to parking level 03, basement level and the ground floor level with minor alterations to the building envelope.

      33 URSULA FRANKLIN ST · Aug 24, 2026 · 281 m away
    • Building permit

      Proposal for rooftop solar installation

      214 COLLEGE ST · Aug 11, 2026 · 269 m away
    • Building permit

      Proposed electromagnetic locking devices at Sample Prep (278A), including fire alarm interface, emergency release functions, manual release device, signage, and associated life safety provisions.See also 23-159764 BLD 00 BA

      70 ST GEORGE ST · Aug 7, 2026 · 68 m away
    • Building permit

      Proposal to replace HVAC system.

      1 KING'S COLLEGE CRCL · Jul 23, 2026 · 196 m away
    • Building permit

      Proposal for HVAC Replacement in the anthropology building

      19 RUSSELL ST · Jun 17, 2026 · 203 m away

    Neighbourhood: University

    About the area around the lot, not the lot itself.

    Nearest station
    Queen's Park Station8 min walk
    Nearest TTC stop
    College St at St George St5 min walk
    Nearest cycling route
    St George StBike Lane, 1 min walk
    Nearest traffic count
    6,330 vehicles in 8 hSt George St / Ursula Franklin St, 100 m away, Feb 11, 2020
    Serious collisions within 500 m
    62021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 6 with cyclists
    Parks
    Queen's Park6 min walk
    Lillian H. Smith Park7 min walk
    McCaul - Orde Parkette8 min walk

    Schools within 1 km

    • SCHOOL OF GRADUATE STUDIES - U OF T, BLDG 43 University 1 min walk
    • BRAEMAR COLLEGE PRIVATE SECONDARY SCHOOL Private 6 min walk
    • MUNK SCHOOL OF GLOBAL AFFAIRS AT TRINITY - U OF T, BLDG 12A University 7 min walk
    • MUNK SCHOOL OF GLOBAL AFFAIRS GRAHAM LIBRARY - U OF T, BLDG 12C University 7 min walk
    • RONALD MCDONALD HOUSE Private 7 min walk
    • ROTMAN SCHOOL OF MANAGEMENT - U OF T, BLDG 134 University 7 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureUniversityMedian neighbourhood
    Median household income (2020)$80,000$84,500
    Households that own their home39%54%
    Population (2021)6,43516,813
    Homes built in 1960 or before59%29%
    Homes needing major repairs11%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleUniversityCity median
    Assault1740.5636.3
    Robbery133.969.5
    Homicide12.25.3
    Auto theft182.6192.6
    Theft over $5,000121.746.1
    Break and enter730.3172.8
    Theft from vehicles353188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.