Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Ravine and natural feature protection (24% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 6582 open orders or by-law investigations
Needs a closer lookNot resolved in the City's records: 26 208004 PRS 00 IV (Order Issued Property Standards: Fixed window within dwelling units that extend to less..., 2026, status Order Issued); 26 207728 PRS 00 IR (Property Standards, 2026, status Order Issued).
What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.
How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsBuilding permit open since 2020
Needs a closer lookStill open in the City's records: 20 152775 (Proposed interior alterations of non-conforming residential building to revise administ..., 2020, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Natural Heritage System (27% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 95 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Order Issued Property Standards, Property Standards): 26 171364 000 00 IR (Adequate Heat, 2026); 26 171363 000 00 IR (Property Standards, 2026); 26 128782 PRS 00 IV (Order Issued Property Standards: The hedge(s), shrub(s), tree(s) and/or plant has been..., 2026); and 2 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 26 251769 (Proposed a flat roof mounted PV System to existing building, 2026); 26 226437 (Proposal for exterior alterations of the site features of an existing four storey TCHC..., 2026); 26 226465 (Proposal for interior alterations to existing four storey TCHC apartment building (door..., 2026).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development ApplicationsRental building evaluation: 93 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2026 (4 storeys, 53 units, built 1956).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
18 records on file: more than at 100% of Toronto houses (median 0).
- Building permit26 251769Permit Issued
Proposed a flat roof mounted PV System to existing building.
Nov 16, 2026 · 59 EDGEWOOD AVE - Building permit26 226437Permit Issued
Proposal for exterior alterations of the site features of an existing four storey TCHC apartment building (replace paved walkway with concrete walkway, additional rest areas, additional accessible picnic table area and standalone canopy installation).
Nov 12, 2026 · 59 EDGEWOOD AVE - Building permit26 226465Permit Issued
Proposal for interior alterations to existing four storey TCHC apartment building (doorway widening, alterations to washroom, mechanical upgrades and other minor accessible upgrades).
Oct 20, 2026 · 59 EDGEWOOD AVE - By-law investigation26 208004 PRS 00 IVOrder Issued
Order Issued Property Standards: Fixed window within dwelling units that extend to less than 1,000 millimetres from the floor is not protected by a guard to at least 1,000 millimetres above the
Jul 23, 2026 · 59 EDGEWOOD AVE - By-law investigation26 207728 PRS 00 IROrder Issued
Property Standards
Jul 23, 2026 · 59 EDGEWOOD AVE - By-law investigation26 171364 000 00 IRClosed
Adequate Heat
Jun 1, 2026 · 59 EDGEWOOD AVE - By-law investigation26 171363 000 00 IRClosed
Property Standards
Jun 1, 2026 · 59 EDGEWOOD AVE - By-law investigation26 128782 PRS 00 IVClosed
Order Issued Property Standards: The hedge(s), shrub(s), tree(s) and/or plant has been planted and/or maintained in a manner which is obstructing the safety of the public.
Mar 12, 2026 · 59 EDGEWOOD AVE
Show 10 older records
- By-law investigation26 128721 PRS 00 IRClosed
Property Standards
Mar 12, 2026 · 59 EDGEWOOD AVE - By-law investigation25 239325 PRS 00 IRClosed
Property Standards
Oct 14, 2025 · 59 EDGEWOOD AVE - Building permit20 152775Inspection
Proposed interior alterations of non-conforming residential building to revise administration offices
Jul 7, 2020 · 59 EDGEWOOD AVE - Building permit20 139500Closed
Proposal to replace the fire alarm control panel in the existing apartment building.
May 27, 2020 · 59 EDGEWOOD AVE - Building permit18 167065Closed
Proposal to install 1 maglock on first floor.
Jun 20, 2018 · 59 EDGEWOOD AVE - Building permit15 153768Closed
Proposal to repair the existing concrete canopy at the front entrance of an existing apartment building
Jun 8, 2015 · 59 EDGEWOOD AVE - Building permit10 292433Closed
Proposal to install one backflow prevention device in existing apartment building.
Dec 6, 2010 · 59 EDGEWOOD AVE - Building permit00 119657Closed
fire alarm retrofit audibility upgrade. CARD PRINTED
Apr 19, 2000 · 59 EDGEWOOD AVE - Building permit97 022119Closed
CARRY OUT REMEDIAL WORK TO COMPLY WITH THE RETROFIT PART 9 PROVISIONS OF THE FIRE CODE. P. AU IS FAMILIAR (CALL WHEN READY) COST INCL: 403270 BP
Oct 15, 1998 · 59 EDGEWOOD AVE - Building permit96 023576Closed
MAKE GENERAL REPAIRS TO PARKING GARAGE CLASS 2 ACTIVITY. BP $100.00 FEE
Dec 18, 1996 · 59 EDGEWOOD AVE
Check before you build
Site-specific exception 900.2.10(278)
Needs a closer look1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
A dwelling unit is only permitted in a detached house or a duplex ; and for a duplex , and the following also applies: (i) a duplex may be attached to one other duplex on an adjacent lot in the same zone; and (ii) the minimum side yard setback for a duplex or for the exterior of two attached duplex residential buildings is 3.0 metres. [TO: 438-86; 6(1)(f)(a)(i)] and [TO:438-86; 6(3) PART II 3. D.] and [TO: 438-86; 12 (2) 217]
- Older by-law A
Section 12(2) 217 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 6,612 m²
- Frontage
- 91.8 mestimated, irregular lot
- Depth
- 111.7 mestimated, irregular lot
- Street
- Edgewood Ave
- Corner lot
- No
- Public lane
- None
- House footprint
- 1,604 m²roof up to 20 m
- Back yard
- 39.7 mhouse to rear lot line
- Side yards
- 3.7 m and 22.6 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- 11 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Zone R (u4; d0.6) (x278) (Residential). Chapter 10, section 10.10 of the by-law. Source
- 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: honey locust (43 cm), maple, norway (26 cm), honey locust skyline (22 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%27 of 27 decisions
- Garden suite permits
- 2
- Laneway suite permits
- 1
- Multiplex permits
- 1
- Development applications
- 3
Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 27 variance decisions: more than at 59% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter a 4-storey (13 m) detached building (houseplex with a total of six residential dwelling units (4 units will have double levels), as approved by Minor Variance Decision A0897/25TEY, by increasing the maximum building height to 5-storeys (17.24 m) with front and rear rooftop terraces.
69 COXWELL AVE · Oct 7, 2026 · 478 m away - Minor varianceApproved
To construct a new one-storey detached ancillary building (containing a one-car garage), in the rear yard, abutting the laneway.
16 ORCHARD PARK BLVD · Oct 7, 2026 · 447 m away - Minor varianceApproved
To legalize and to maintain the removal of two lawfully existing rear yard parking spaces, and the construction of a rear second storey exterior staircase, without an authorized building permit.
189 RHODES AVE · Jul 8, 2026 · 498 m away - Minor varianceApproved
To permit the existing two-storey semi-detached dwelling (houseplex) with a rear two-storey addition (including a basement extension below with a basement walkout), and a first storey deck with stairs. Also, to alter the dwelling from two residential dwelling units to a total of three residential dwelling units (one unit within the basement, one unit on the ground floor, and one unit occupying the second storey).
172 COXWELL AVE · Jul 8, 2026 · 452 m away - Minor varianceApproved
To construct a new two-storey detached dwelling (including a basement) with a front ground level covered deck (abutting Edgewood Grove), and a side (east) covered porch with stairs (abutting Edgewood Gardens). Also, to construct a new one-storey detached ancillary building (one-car garage), abutting Edgewood Gardens.
8 EDGEWOOD GRV · Feb 18, 2026 · 188 m away
Latest activity nearby
- Building permit
INSTALL BACK WATER VALVE
17 HEMLOCK AVE · Nov 23, 2026 · 199 m away - Building permit
Rear yard landscaping, including the construction of a new patio, stairs/steps, and rear retaining walls.
25 HIGHCROFT RD · Nov 17, 2026 · 219 m away - Building permit
Proposed a flat roof mounted PV System to existing building.
59 EDGEWOOD AVE · Nov 16, 2026 · 12 m away - Building permit
Proposal for exterior alterations of the site features of an existing four storey TCHC apartment building (replace paved walkway with concrete walkway, additional rest areas, additional accessible picnic table area and standalone canopy installation).
59 EDGEWOOD AVE · Nov 12, 2026 · 12 m away - Building permit
REV 01: Replace existing foundation with new concrete block foundation wall and extending the depth from 6'6" to 8'-6"Proposed reconstruction/repair of the compromised basement foundation/footing/basement walls/basement floor.
24 EDGEWOOD AVE · Nov 5, 2026 · 142 m away - Building permit
PROPOSED REPAIRS TO EXISITING REAR ADDTION AND ROOF AND MODIFICATION TO REAR PORCH WITH NEW CANOPY. PROPOSAL ALSO TO LEGALIZED SECOND SUITE.
30 HIGHCROFT RD · Oct 30, 2026 · 268 m away - Building permit
Proposal for interior alterations to existing four storey TCHC apartment building (doorway widening, alterations to washroom, mechanical upgrades and other minor accessible upgrades).
59 EDGEWOOD AVE · Oct 20, 2026 · 12 m away - Building permit
install back water valve and sump pump
25 EDGEWOOD AVE · Sep 30, 2026 · 107 m away - Building permit
Repair to existing rear deck and steps.
2016 DUNDAS ST E · Aug 25, 2026 · 271 m away - Building permit
Proposal for a deck in the rear yard.
2020 DUNDAS ST E · Aug 20, 2026 · 269 m away
Neighbourhood: Woodbine Corridor
About the area around the lot, not the lot itself.
- Nearest station
- Coxwell Station26 min walk
- Nearest TTC stop
- Kingston Rd at Columbine Ave4 min walk
- Nearest cycling route
- Dundas St ECycle Track, 3 min walk
- Nearest traffic count
- 10,053 vehicles in 8 hKingston Rd / Columbine Ave, 230 m away, Nov 22, 2022
- Serious collisions within 500 m
- 02021–2026, killed or seriously injured
- Parks
- Cairns Avenue Parkette2 min walk
- Edgewood Parkette3 min walk
- Orchard Park4 min walk
Schools within 1 km
- BOWMORE ROAD JR & SR PUBLIC SCHOOL English Public 8 min walk
- ACADEMY OF THOUGHT AND INDUSTRY TORONTO Private 8 min walk
- KEW PARK MONTESSORI SCHOOL - HIAWATHA Private 12 min walk
- NORWAY JR PUBLIC SCHOOL English Public 13 min walk
- RODEN PUBLIC & EQUINOX HOLISTIC ALTERNATIVE English Public 14 min walk
- GEORGES ETIENNE CARTIER CATHOLIC ELEMENTARY SCHOOL French Separate 14 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Woodbine Corridor | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $97,000 | $84,500 |
| Households that own their home | 60% | 54% |
| Population (2021) | 12,205 | 16,813 |
| Homes built in 1960 or before | 66% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Woodbine Corridor | City median |
|---|---|---|
| Assault | 728.8 | 636.3 |
| Robbery | 21.9 | 69.5 |
| Auto theft | 65.6 | 192.6 |
| Theft over $5,000 | 43.7 | 46.1 |
| Break and enter | 123.9 | 172.8 |
| Theft from vehicles | 131.2 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.