Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: listed
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register19 development applications open within 300 m
Good to know19 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 75 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
1 records on file: more than at 53% of Toronto houses (median 0).
- Building permit23 116560Closed
Proposal to Install a 1 1/2" DCVA Backflow Preventer for Premise Isolation.
Mar 17, 2023 · 589 CHURCH ST
Check before you build
Site-specific exception 900.2.10(874)
Needs a closer look3 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
The lands must comply with exception 900.2.10(4)
- Rule B
On a lot , a tourist home is permitted
- Rule C
Any lot used as a tourist home must provide one parking space for the principal dwelling unit on the lot if such parking space existed on the lot either prior to or during the use of the building as a tourist home .
- Older by-law A
Section 12(5)(h) of former City of Toronto By-law 438-86
- Older by-law B
On 71 Charles St. E., 589 Church St., 72 Isabella St., former City of Toronto by-laws 506-77 and 507-77
7 parts for other addresses
- C On 77 Charles St. E., former City of Toronto by-law 580-89
- D On the odd numbered addresses of 99-103 Charles St. E., 568 Jarvis St. City of Toronto by-law 577-09
- E On 561 Church St., former City of Toronto by-laws 26-76 and 28-76
- F On the odd numbered addresses of 577-585 Church St., the even numbered addresses of 86-96 Gloucester St., 79 Isabella St., former City of Toronto by-law 28-76
- G On 19 Dundonald St., former City of Toronto by-law 532-83
- H On 36 Dundonald St., former City of Toronto by-law 363-80
- I On the even numbered addresses of 90-92 Isabella St., former City of Toronto by-laws 362-78 and 363-78.
Lot facts
- Area
- 881 m²
- Frontage
- 29.2 m
- Depth
- 30.9 m
- Street
- Church St
- Corner lot
- No
- Public lane
- Al Sparrow Lane, 29.2 m along it
- House footprint
- 487 m²roof up to 19.4 m
- Back yard
- 0.6 mhouse to rear lot line
- Side yards
- 0 m and 1.3 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 1house, garage, sheds
- Max height
- 30 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Site and Area Specific Policy 382. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
- Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone R (d1.0) (x874) (Residential). Chapter 10, section 10.10 of the by-law. Source
Around this lot
- Minor variances approved
- 81%13 of 16 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 4
- Development applications
- 35
Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 16 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a complete third storey addition and a rear rooftop terrace. The existing home occupation will be maintained.
63 ST NICHOLAS ST · Feb 15, 2023 · 396 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey townhouse dwelling by enlarging the front third storey dormer and rear third storey terrace.
137 COLLIER ST · Aug 31, 2022 · 440 m away - Minor varianceApproved
To convert a semi-enclosed storage area on the ground floor of the existing apartment building to a commercial kitchen.
50 EARL ST · Sep 15, 2021 · 497 m away - Minor varianceApproved
To alter the existing three-storey office building by constructing a new elevator and a new dormer over the elevator shaft.
92 ISABELLA ST · Jun 30, 2021 · 85 m away - Minor varianceApproved
To alter the existing three-storey townhouse by constructing side one-storey additions, a rear attached garage with rooftop deck and a side third storey addition.
10 ST JOSEPH ST · Jan 20, 2021 · 436 m away
Latest activity nearby
- Building permit
Revision 01 - fire alarm upgrade to P1, P2, P3, P4, P5 and first and second floorFire Alarm Upgrade: to add strobes in the required area to address accessibility requirement, the rest existing fire alarm to remain.
1 MOUNT PLEASANT RD · Nov 18, 2026 · 265 m away - Building permit
Proposal for interior alterations to an existing office space
121 BLOOR ST E · Nov 10, 2026 · 253 m away - Minor varianceRefused
To alter the development standards, as approved under Site Specific Zoning By-laws 22769 and 325-82, for the existing 27-storey mixed-use building by reducing the building setbacks, increasing the residential dwelling units from 479 to 495 units, increasing the total gross floor area, and reducing the total amenity space. This application is subject to a Site Plan Control application, which has not yet been submitted by the applicant.
235 BLOOR ST E · Nov 4, 2026 · 288 m away - Building permit
REV 01: Revision to permit to include two risers Proposal to replace heating riser.
110 CHARLES ST E · Oct 20, 2026 · 180 m away - Building permit
Office new fit out to accommodate new tenant. HVAC to reflect new ceiling.
175 BLOOR ST E · Oct 15, 2026 · 215 m away - Building permit
PROPOSED EXTERIOR WALL REPAIRS
620 CHURCH ST · Oct 5, 2026 · 74 m away - Building permit
Proposal for installation of an art work on the front face of existing building. Weight 150kg
519 CHURCH ST · Sep 25, 2026 · 259 m away - Zoning review
Cancelled
584 CHURCH ST · Sep 22, 2026 · 206 m away - Building permit
Maglock Installation
100 HAYDEN ST · Sep 9, 2026 · 193 m away - Zoning review
Closed
10 HUNTLEY ST · Sep 3, 2026 · 297 m away
Neighbourhood: Church-Wellesley
About the area around the lot, not the lot itself.
- Nearest station
- Wellesley Station7 min walk
- Nearest TTC stop
- Bloor St East at Church St4 min walk
- Nearest cycling route
- Bloor St ECycle Track, 4 min walk
- Nearest traffic count
- 11,768 vehicles in 14 hIsabella St / Church St, 50 m away, Sep 9, 2025
- Serious collisions within 500 m
- 122021–2026, killed or seriously injured: 1 fatal, 5 with pedestrians, 5 with cyclists
- Parks
- Charles Street Parkette1 min walk
- Barbara Hall Park4 min walk
- George Hislop Park4 min walk
Schools within 1 km
- THE ABELARD CENTRE FOR EDUCATION Private 3 min walk
- HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 3 min walk
- MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 7 min walk
- MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 7 min walk
- JARVIS COLLEGIATE INSTITUTE English Public 7 min walk
- NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 8 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Church-Wellesley | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $60,400 | $84,500 |
| Households that own their home | 24% | 54% |
| Population (2021) | 22,320 | 16,813 |
| Homes built in 1960 or before | 15% | 29% |
| Homes needing major repairs | 5% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Church-Wellesley | City median |
|---|---|---|
| Assault | 1264.6 | 636.3 |
| Robbery | 93.2 | 69.5 |
| Homicide | 3.3 | 5.3 |
| Auto theft | 46.6 | 192.6 |
| Theft over $5,000 | 106.5 | 46.1 |
| Break and enter | 146.4 | 172.8 |
| Theft from vehicles | 206.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.