HousePrecheckCheck an address

585 Dundas St EToronto · zoning, lot size and permit records

49.0 × 75.3 m3,600 m²on Dundas St Ecorner, also on Regent Park Blvd

Not a home

A commercial or mixed-use building

Its main building is large, outside the citywide zoning by-law: shops, offices or a mixed-use building rather than one house. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Shops, offices or a mixed buildingCustomers, deliveries and evening activity; errands within a short walk.
  • Permits or applications open on this parcelRecent records on this lot: 26 135065 (REVISION - Deleted one (1) fire alarm pull stationProposed interior alterations for ten..., 2026). Larger work can mean noise and trucks next door; read what each one is for.
  • 4 development applications open within 300 m, up to 35 storeysNew buildings may go up around here in the next years. More change nearby than at 98% of Toronto houses.
N20 m
49.0 m frontage75.3 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Work or applications in progress

    Good to know

    Recent records on this lot: 26 135065 (REVISION - Deleted one (1) fire alarm pull stationProposed interior alterations for ten..., 2026).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 4 development applications open within 300 m

    Good to know

    4 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 35 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit26 135065Revision Issued

    REVISION - Deleted one (1) fire alarm pull stationProposed interior alterations for tenant fit up

    Aug 6, 2026 · 585 DUNDAS ST E
  • Zoning review26 105011 LTOClosed
    Jan 15, 2026 · 585 DUNDAS ST E
  • Zoning review18 192374 LPRClosed
    Jul 11, 2018 · 585 DUNDAS ST E
  • Building permit17 239437Closed

    Proposal to install a 30 x 60 frame tent (Certified #15-120131)

    Oct 4, 2017 · 585 DUNDAS ST E
  • Zoning review16 269814 LTOClosed
    Dec 22, 2016 · 585 DUNDAS ST E
  • Building permit14 266519Closed

    Proposal to construct 50 m2 of partitioned office space within an existing 3rd floor office building.

    Jan 7, 2015 · 585 DUNDAS ST E
  • Zoning review12 270471 LTOClosed
    Oct 30, 2012 · 585 DUNDAS ST E

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
3,600 m²
Frontage
49 m
Depth
75.3 m
Street
Dundas St E
Corner lot
Yes, also on Regent Park Blvd75.3 m along it
Public lane
None
House footprint
2,336 m²
Back yard
17.5 mhouse to rear lot line
Side yards
0.1 m and 3.6 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 7 City trees in front of this lot. The City's street tree inventory lists 7 trees at this address: planetree, london (14 cm), planetree, london (12 cm), planetree, london (12 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%15 of 15 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
17

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 15 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new rear one-storey detached ancillary building (one-car garage) abutting the laneway.

    60 WASCANA AVE · Oct 14, 2026 · 465 m away
  • Minor varianceApproved

    To construct a one-storey detached ancillary building (two-car garage) in the rear yard, abutting the laneway.

    28 SWORD ST · Apr 29, 2026 · 488 m away
  • Minor varianceApproved

    To alter the development standards for the 34-storey mixed-use building (approved under Site Specific Zoning By-Law 839-2021), by increasing the height and number of storeys (from 34-storeys to 40-storeys (including a 6-storey podium)), gross floor area, number of dwelling units, and permitted projections to accommodate the garbage vent chute and mechanical penthouse. Also, to reduce the percentage of the required two or three bedroom dwelling units or larger, building setbacks, resident parking spaces, bicycle parking spaces, and the width of stacked bicycle parking spaces. There will be a total of 527 residential dwelling units on this lot and modify the building setbacks. A related Site Plan Control Application (File Number 20 208677 STE 13 SA) is approved with conditions.

    111 RIVER ST · Jan 28, 2026 · 360 m away
  • Minor varianceApproved

    To alter the existing one-storey detached building by permitting a vehicle service shop use on this lot.

    131 RIVER ST · Oct 29, 2025 · 369 m away
  • Minor varianceApproved

    To alter the development standards (as approved under Site Specific Zoning By-law 141-2005 (as amended by By-laws 1325-2023 and 1392-2024)) for a mixed-use building encompassing Tower D and including a podium/base building on the lands between Dreamer¿s Way and Street G, in regards to the phasing requirements (the construction of Street G, and Sackville Street) and by increasing the height of the mechanical penthouse. A Site Plan Control application (File No. 25 103941 STE 13 SA) is currently under review and consideration. This building will contain 271 affordable rental housing units, and 33,161 m² of residential gross floor area, 913 m² of ground floor retail space, and 1,160 m² of ground floor community space.

    325 GERRARD ST E · Oct 1, 2025 · 338 m away

Latest activity nearby

  • Zoning review

    Not Started

    480 SHUTER ST · Nov 19, 2026 · 251 m away
  • Building permit

    REV 01: Revisions as per bubbled changesProposed interior alterations of a new restaurant including minor architectural, HVAC, plumbing, & electrical work 'Taco Bell'.

    650 DUNDAS ST E · Nov 10, 2026 · 185 m away
  • Building permit

    6 wall signs and 1 window sign.***TACO BELL***

    620 DUNDAS ST E · Nov 6, 2026 · 228 m away
  • Building permit

    Proposal to install new smoke alarms and monitoring modules to provide individual suite nnunciation on the fire alarm system.

    146 SUMACH ST · Oct 30, 2026 · 210 m away
  • Zoning review

    Closed

    650 DUNDAS ST E · Oct 29, 2026 · 185 m away
  • Building permit

    REVISION-01Propose to relocate washer/dryer from ground floor to second-floor mechanical room, convert existing ground-floor enclosure into a washroom, and add a capped plumbing rough-in for a future kitchenette sink.

    29 OAK ST · Oct 28, 2026 · 285 m away
  • Zoning review

    Under Review

    20 REGENT ST · Oct 27, 2026 · 275 m away
  • Building permit

    Proposed one maglock to hallway door.

    465 DUNDAS ST E · Sep 4, 2026 · 298 m away
  • Zoning review

    Closed

    620 DUNDAS ST E · Aug 25, 2026 · 228 m away
  • Building permit

    The installation of two 5500 MBH condensing gas-fired boilers, one 1500 ton chiller and cooling towers, and ancillary equipment in the penthouse mechanical room. Additionally, the installation of pressure break heat exchangers in the P1 level, as well as distribution pumps and piping to interconnect with RPEI's existing district energy system.

    620 DUNDAS ST E · Aug 21, 2026 · 228 m away

Neighbourhood: Regent Park

About the area around the lot, not the lot itself.

Nearest station
TMU Station25 min walk
Nearest TTC stop
Dundas St East at Regent Park Blvd1 min walk
Nearest cycling route
Dundas St ECycle Track, 1 min walk
Nearest traffic count
5,859 vehicles in 8 hDundas St E / Regent Park Blvd, 60 m away, Mar 1, 2022
Serious collisions within 500 m
52021–2026, killed or seriously injured: 2 fatal, 3 with pedestrians, 2 with cyclists
Parks
Regent Park Boulevard Park1 min walk
Regent Park1 min walk
Regent Park Athletic Grounds3 min walk

Schools within 1 km

  • NELSON MANDELA PARK PUBLIC SCHOOL English Public 4 min walk
  • LORD DUFFERIN JR & SR PUBLIC SCHOOL English Public 7 min walk
  • ST PAUL CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk
  • SPRUCECOURT JR PUBLIC SCHOOL English Public 9 min walk
  • LIBERTY PREP SCHOOL Private 9 min walk
  • INGLENOOK COMMUNITY SCHOOL English Public 11 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureRegent ParkMedian neighbourhood
Median household income (2020)$65,500$84,500
Households that own their home30%54%
Population (2021)12,75016,813
Homes built in 1960 or before13%29%
Homes needing major repairs5%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleRegent ParkCity median
Assault947.8636.3
Robbery83.569.5
Shootings610.5
Auto theft95.4192.6
Theft over $5,00011.946.1
Break and enter166.9172.8
Theft from vehicles125.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.