HousePrecheckCheck an address

585 Bloor St EToronto · zoning, lot size and permit records

≈ 28.9 × 65.8 m1,260 m²on Parliament Stcorner, also on Bloor St E

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.1 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
≈ 28.9 m frontage≈ 65.8 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

2 records on file: more than at 72% of Toronto houses (median 0).

  • By-law investigation25 180265 PRS 00 IRClosed

    Property Standards

    Jun 19, 2025 · 585 BLOOR ST E
  • Development application17 120977 STE 28 SAClosed

    Site Plan Application to permit a mixed use development consisting of a 2 tower scenario with retail uses at grade located on the Eastern portion of the site. The 2 residential towers will be 37 and 45 storey's with a 4 storey podium linking the 2 towers. The towers will have a total of 769 residential units and 445 parking spaces are proposed in 4 levels of below grade parking. This Application is for Block 3 of a 3 Block proposal issued under ZBA/OPA Application (10-247063 STE 28 OZ).

    Feb 24, 2017 · 585 BLOOR ST E · City file

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
1,260 m²
Frontage
28.9 mestimated, irregular lot
Depth
65.8 mestimated, irregular lot
Street
Parliament St
Corner lot
Yes, also on Bloor St E65.8 m along it
Public lane
None
Max height
—
Max lot coverage
—

    Around this lot

    Minor variances approved
    100%4 of 4 decisions
    Garden suite permits
    0
    Laneway suite permits
    0
    Multiplex permits
    1
    Development applications
    7

    Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 4 variance decisions: no more than at most Toronto houses (median 19).

    Recent variance decisions in the same zone

    • Minor varianceApproved

      To permit and maintain the existing two ground level parking spaces within the existing rear two-storey ancillary building (containing one garden suite on the second storey), abutting Dale Avenue. Also, to maintain the existing rear canopy above the garage door on the north side of the ancillary building. This application is necessitated as Minor Variance Decision A0388/25TEY approved a garden suite to occupy both the ground and second storeys of the ancillary building. There will be a total of two residential dwelling units on this through lot (one unit within the main dwelling and one unit within the ancillary building).

      8 MC KENZIE AVE · Sep 9, 2026 · 329 m away
    • Minor varianceApproved

      To alter the existing three-storey semi-detached dwelling by constructing a new front porch with stairs and a canopy, a partial rear one-storey addition, and a rear ground floor deck and patio. The existing rear two-storey addition and rear ground floor deck will be demolished. The basement level will be maintained as an entertainment room with one guest bedroom and wet bar.

      21 NANTON AVE · Aug 19, 2026 · 422 m away
    • Minor varianceApproved

      To convert the existing rear one-storey detached ancillary building (containing a one-car garage and storage area) into one garden suite. The conversion will include constructing a one-storey side (north and west) addition, a partial second storey addition along the side (south and east) walls, a side (south) covered porch, and a raised roof. This current application is necessitated to identify the variances related to this ancillary building (currently under construction beyond the limits of the authorized building permit (No. 25 163582 BLD 00 SR)). There will be a total of two residential dwelling units on this lot (one unit within the main building and one unit within the ancillary building).

      9 HAWTHORN AVE · Mar 11, 2026 · 429 m away
    • Minor varianceApproved

      To permit 30 undersized/partially obstructed vehicular parking spaces within the existing underground parking garage (Parking Levels 1 to 5) of the 53-storey mixed-use building, which is currently under construction.

      603 SHERBOURNE ST · Nov 26, 2025 · 382 m away
    • Minor varianceApproved

      To alter the development standards (as approved under Site Specific Zoning By-law 1529-2019), for a new 56-storey mixed-use building (which is currently under construction), by increasing the gross floor area, the total number of dwelling units, and the building height(s) for Building E (145.5 m to 159 m). There will be a total of 600 residential dwelling units on this lot.

      591 SHERBOURNE ST · Sep 3, 2025 · 376 m away

    Latest activity nearby

    • Building permit

      Replacement of existing fire damaged balcony railings and repair of existing balconies for unit 2307 & 2407.

      375 BLEECKER ST · Oct 30, 2026 · 293 m away
    • Zoning review

      Closed

      100 HOWARD ST · Oct 29, 2026 · 40 m away
    • Building permit

      Fire Damage in a High-rise Residential Building: Removing and replacing all damaged interior finishes and partition walls, balcony windows and doors, and balcony railings in the affected unit. If further investigation confirms damage to the concrete balcony slab, it will be repaired or replaced.

      666 ONTARIO ST · Oct 16, 2026 · 281 m away
    • Building permit

      Proposed repair/rebuild of existing rear deck.

      9 CASTLE FRANK CRES · Oct 13, 2026 · 274 m away
    • Zoning review

      Closed

      99 HOWARD ST · Sep 25, 2026 · 60 m away
    • Building permit

      Proposal for fire alarm system renewal

      375 BLEECKER ST · Aug 24, 2026 · 293 m away
    • Building permit

      Proposal to divide single apartment unit into a two-unit suite.

      21 DALE AVE · Aug 19, 2026 · 220 m away
    • Building permit

      Proposal to install five (5) electromagnetic locks (maglocks).

      375 BLEECKER ST · Jul 23, 2026 · 293 m away
    • Building permit

      Proposal for balcony repairs and guard replacement.

      650 PARLIAMENT ST · Jul 15, 2026 · 234 m away
    • Building permit

      A proposal to erect and display 2 Wall Signs and 2 Projecting Signs, all displaying static copy.**MAN O'CLOCK**

      100 HOWARD ST · Jun 29, 2026 · 40 m away

    Neighbourhood: North St.James Town

    About the area around the lot, not the lot itself.

    Nearest station
    Castle Frank Station6 min walk
    Nearest TTC stop
    Bloor St East at Parliament St1 min walk
    Nearest cycling route
    Bloor St ECycle Track, 1 min walk
    Nearest traffic count
    10,581 vehicles in 8 hHoward St / Parliament St, 60 m away, Jul 9, 2001
    Serious collisions within 500 m
    52021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 2 with cyclists
    Parks
    Rosedale Ravine Lands1 min walk
    Rekai Family Parkette1 min walk
    Dr. Gordon Chong Park2 min walk

    Schools within 1 km

    • ROSE AVENUE JR PUBLIC SCHOOL English Public 3 min walk
    • MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 8 min walk
    • MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 8 min walk
    • ROSEDALE HEIGHTS SCHOOL OF THE ARTS English Public 8 min walk
    • WINCHESTER JR & SR PUBLIC SCHOOL English Public 10 min walk
    • OUR LADY OF LOURDES CATHOLIC ELEMENTARY SCHOOL English Separate 11 min walk

    Being near a school does not mean the lot is in its catchment; check with the board.

    2021 Census

    FigureNorth St.James TownMedian neighbourhood
    Median household income (2020)$59,200$84,500
    Households that own their home11%54%
    Population (2021)18,53516,813
    Homes built in 1960 or before19%29%
    Homes needing major repairs10%7%

    Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

    Police-reported crime, 2025

    Per 100,000 peopleNorth St.James TownCity median
    Assault1281.6636.3
    Robbery76.969.5
    Shootings4.310.5
    Auto theft85.4192.6
    Theft over $5,00038.446.1
    Break and enter153.8172.8
    Theft from vehicles136.7188.1

    Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

    Something here not right?

    Sources

    • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
    • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
    • Development applications: Rezoning, site plan, subdivision and condominium applications.
    • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
    • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
    • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
    • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
    • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
    • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
    • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
    • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
    • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
    • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
    • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
    • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
    • Address points: loaded Nov 22, 2026, published Nov 20, 2026
    • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
    • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
    • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
    • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
    • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
    • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
    • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
    • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
    • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
    • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
    • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
    • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
    • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
    • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
    • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
    • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
    • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
    • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
    • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
    • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
    • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
    • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
    • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
    • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
    • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
    • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
    • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
    • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
    • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
    • School locations: loaded Oct 14, 2026, published May 27, 2026
    • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
    • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
    • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
    • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
    • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
    • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
    • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
    • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
    • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
    • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

    Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

    Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

    Flag an error

    What is not right?

    The problem

    The records come from the City's open data; we check each flag against them. Your email is used only to answer this.