HousePrecheckCheck an address

580 Rathburn RdToronto · zoning, lot size and permit records

≈ 174.3 × 375.7 m51,431 m²on Rathburn Rdcorner, also on Centennial Park Rd

Not a home

Seneca School

The City of Toronto's real estate inventory lists Seneca School here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • A public buildingVisitors and traffic in its open hours; usually quiet at night.
  • Permits or applications open on this parcelStill open in the City's records: 09 144040 (HVAC - main floor interior alterations for barrier free restoration, 2009, status Inspection); 04 188171 (Boiler upgrade/replacement for the Etobicoke Olympian Pool, 2005, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
N50 m
≈ 174.3 m frontage≈ 375.7 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2005

    Needs a closer look

    Still open in the City's records: 09 144040 (HVAC - main floor interior alterations for barrier free restoration, 2009, status Inspection); 04 188171 (Boiler upgrade/replacement for the Etobicoke Olympian Pool, 2005, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation25 131579 WST 00 IRClosed

    Waste

    Mar 19, 2025 · 580 RATHBURN RD
  • Building permit23 216655Closed

    Proposed washroom enhancements in 2 student washrooms

    Oct 25, 2023 · 580 RATHBURN RD
  • Building permit19 119784Closed

    Proposed interior alterations to an administrative office and washroom in an existing elementry school.

    Mar 4, 2019 · 580 RATHBURN RD
  • Building permit17 155735Closed

    Exterior Wall Restoration including masonry brick wall repairs, lintel repairs, sealant replacement, and window and door replacement

    May 11, 2017 · 580 RATHBURN RD
  • Building permit15 232182Closed

    Construct a roof top solar photovoltaic system consisting of 580 CS6X-P 310 WATT panels at a 10 degree tilt.

    Nov 16, 2015 · 580 RATHBURN RD
  • Building permit14 171699Closed

    install rooftop photovaltic array (solar collector)

    Jul 23, 2014 · 580 RATHBURN RD
  • Zoning review11 222552 ZPRClosed
    Jun 20, 2011 · 580 RATHBURN RD
  • Building permit09 144040Inspection

    HVAC - main floor interior alterations for barrier free restoration

    Jun 4, 2009 · 580 RATHBURN RD
Show 2 older records
  • Building permit09 121039Closed

    installation of one backflow preventer

    Apr 6, 2009 · 580 RATHBURN RD
  • Building permit04 188171Inspection

    Boiler upgrade/replacement for the Etobicoke Olympian Pool

    Jan 10, 2005 · 580 RATHBURN RD

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
51,431 m²
Frontage
174.3 mestimated, irregular lot
Depth
375.7 mestimated, irregular lot
Street
Rathburn Rd
Corner lot
Yes, also on Centennial Park Rd375.7 m along it
Public lane
None
House footprint
2,412 m²roof up to 8.2 m
Back yard
254.4 mhouse to rear lot line
Side yards
23.4 m and 47.7 mhouse to side lot lines
Buildings on the lot
7house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 6 City trees in front of this lot. The City's street tree inventory lists 6 trees at this address: maple, norway (37 cm), maple, norway (33 cm), linden, littleleaf (33 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
0
Development applications
2

Within 300 m, last 10 years. 1 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a second storey addition above the existing dwelling.

    14 IVYBRIDGE DR · Jun 11, 2026 · 426 m away
  • Minor varianceApproved

    To construct a new attached garage along the south side of the dwelling, and a new garden suite in the rear yard with an attached garage along the north side of the garden suite.

    571 RENFORTH DR · Jun 6, 2024 · 289 m away
  • Minor varianceApproved

    To construct a two-storey side addition.

    45 OXENDEN CRES · May 9, 2024 · 401 m away
  • Minor varianceApproved

    To construct a covered porch along the north side.

    434 RENFORTH DR · Feb 7, 2019 · 472 m away
  • Minor varianceApproved

    To construct a two-storey rear addition.

    30 TORRINGTON DR · May 24, 2018 · 406 m away

Latest activity nearby

  • Building permit

    Installation of a new 4" interior backwater valve.

    1 CENTENNIAL PARK RD · Nov 25, 2026 · 140 m away
  • Building permit

    Install one 30'x40' temporary tent for media from May 21st-June 5th, 2026

    56 CENTENNIAL PARK RD · May 14, 2026 · 292 m away
  • Building permitnew building

    Proposed new washroom building and all associated structural, mechanical and electrical work.

    56 CENTENNIAL PARK RD · Jan 30, 2026 · 292 m away
  • Building permitgarden suite

    REV: Proposed revision to 2nd floor layout and new bathroom windowProposal for a new garden suite.

    571 RENFORTH DR · Nov 26, 2025 · 289 m away
  • Building permit

    1 DEVELOPMENT GROUND SIGN**URBAN TOWNS**

    596 RENFORTH DR · Nov 12, 2025 · 287 m away
  • Building permit

    1 DEVELOPMENT GROUND SIGN**URBAN TOWNS**

    596 RENFORTH DR · Nov 3, 2025 · 287 m away
  • Building permit

    1 Ground Sign

    596 RENFORTH DR · Oct 23, 2025 · 287 m away
  • Building permit

    Proposed removal and replacement of existing wood frame balconies/decks at rear of unit in existing townhouse subdivision

    500 RENFORTH DR · Oct 6, 2025 · 211 m away
  • Building permit

    Proposed renovations and extension of existing Park buildings.

    56 CENTENNIAL PARK RD · Oct 3, 2025 · 292 m away
  • Building permit

    Interior alterations - unit 13, work includes interior partitions, plumbing and HVAC alterations

    460 RENFORTH DR · Aug 24, 2025 · 247 m away

Neighbourhood: Eringate-Centennial-West Deane

About the area around the lot, not the lot itself.

Nearest TTC stop
580 Rathburn Rd - Seneca School2 min walk
Nearest cycling route
Centennial Park RdMulti-Use Trail, 2 min walk
Nearest traffic count
8,947 vehicles in 14 hCentennial Park Rd / Rathburn Rd, 140 m away, Aug 19, 2025
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Centennial Park - Etobicoke1 min walk
Elmcrest Park5 min walk
Christ the King Park9 min walk

Schools within 1 km

  • SENECA SCHOOL English Public 1 min walk
  • HOLLYCREST MDL SCHOOL English Public 8 min walk
  • NATIVITY OF OUR LORD CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • WELLESWORTH JR SCHOOL English Public 12 min walk
  • MICHAEL POWER ST JOSEPH CATHOLIC HIGH SCHOOL English Separate 14 min walk
  • MILL VALLEY JR SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEringate-Centennial-West DeaneMedian neighbourhood
Median household income (2020)$108,000$84,500
Households that own their home84%54%
Population (2021)18,45016,813
Homes built in 1960 or before29%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEringate-Centennial-West DeaneCity median
Assault393.3636.3
Robbery29.969.5
Shootings1010.5
Auto theft234192.6
Theft over $5,00024.946.1
Break and enter109.5172.8
Theft from vehicles114.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.