HousePrecheckCheck an address

58 Newcastle StToronto · zoning, lot size and permit records

Employment · E 1.08.5 × 40.2 m343 m²on Newcastle St

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • 16 development applications open within 300 m, up to 54 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: MimicoThe City plans more homes around the station: good for transit, and more building over time.
N20 m
8.5 m frontage40.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 16 development applications open within 300 m

    Good to know

    16 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 54 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

No permits, applications or Committee of Adjustment files on this lot in the City's open records.

Lot facts

Area
343 m²
Frontage
8.5 m
Depth
40.2 m
Street
Newcastle St
Corner lot
No
Public lane
None
House footprint
81 m²roof up to 5.2 m
Back yard
15.5 mhouse to rear lot line
Side yards
0 m and 1.7 mhouse to side lot lines; 0 is a shared wall
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 433, 860. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Major Transit Station Area: Mimico. The lot is inside the Mimico Major Transit Station Area approved by the Province (Site and Area Specific Policy 692). Source
  • Mimico-Judson Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Zone E 1.0 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source

Around this lot

Minor variances approved
100%18 of 18 decisions
Garden suite permits
1
Laneway suite permits
0
Multiplex permits
8
Development applications
27

Within 300 m, last 10 years. 9 suite and multiplex permits: more than at 72% of Toronto houses (median 3). 18 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To consturct a 42-storey mixed use building, located on top of a 5-storey podium.

    8 NEWCASTLE ST · Oct 23, 2025 · 171 m away
  • Minor varianceApproved

    To permit a second steel silo in the front yard. A previous Committee of Adjustment application (A363/11EYK) approved a two-storey addition and a steel silo in the front yard and approved variances related to parking.

    2 BUCKINGHAM ST · Aug 2, 2018 · 66 m away
  • Minor varianceRefused

    To construct a partial second storey addition above the existing building.

    66 NEWCASTLE ST · Jul 7, 2016 · 84 m away
  • Minor varianceRefused

    To legalize and to maintain the existing 6 buildings constructed without building permits.

    29 JUDSON ST · Apr 24, 2014 · 380 m away

Latest activity nearby

  • Consent (lot split)Pending

    To obtain consent to create an easement/right-of-way.

    365 ROYAL YORK RD · Jan 7, 2027 · 175 m away
  • Consent (lot split)Pending

    To obtain consent to create an easement/right-of-way.

    365 ROYAL YORK RD · Jan 7, 2027 · 175 m away
  • Consent (lot split)Pending

    To obtain consent to create an easement/right-of-way.

    365 ROYAL YORK RD · Jan 7, 2027 · 175 m away
  • Minor variancePending

    To construct a new 14-storey affordable rental building with co-op units that will contain a total of 183 rental dwelling units. The development will be located within Block B on the property municipally known as 18 Buckingham Street.

    18 BUCKINGHAM ST · Dec 3, 2026 · 98 m away
  • Consent (lot split)Pending

    Cancelled

    365 ROYAL YORK RD · Nov 18, 2026 · 175 m away
  • Consent (lot split)Pending

    In Progress

    367 ROYAL YORK RD · Nov 12, 2026 · 180 m away
  • Consent (lot split)Pending

    Cancelled

    101 PORTLAND ST · Nov 12, 2026 · 149 m away
  • Consent (lot split)Pending

    Cancelled

    375 ROYAL YORK RD · Nov 12, 2026 · 204 m away
  • Minor variancePending

    Postponed

    109 CAVELL AVE · Nov 6, 2026 · 297 m away
  • Building permit

    Fire damage restoration of an existing 3-storey mixed-use building. Work includes replacement of fire-damaged roof components, reconstruction of portions of the third-floor exterior wall and interior partitions, localized masonry repairs, reinstatement of fire separations and life safety systems, and associated interior finish restoration. No change to use, height, footprint, or number of units.

    149 PORTLAND ST · Nov 5, 2026 · 198 m away

Neighbourhood: Mimico-Queensway

About the area around the lot, not the lot itself.

Nearest station
Mimico GO Station3 min walk
Nearest TTC stop
Newcastle St at Windsor St - Mimico GO Station1 min walk
Nearest cycling route
Royal York RdBike Lane, 3 min walk
Nearest traffic count
7,694 vehicles in 8 hRoyal York Rd / Newcastle St, 180 m away, Dec 13, 2022
Serious collisions within 500 m
42021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 1 with cyclists
Parks
Coronation Park - Etobicoke4 min walk
Manchester Park5 min walk
Queens Avenue Parkette6 min walk

Schools within 1 km

  • OAK LEARNERS Private 4 min walk
  • GEORGE R GAULD JR SCHOOL English Public 5 min walk
  • ST LEO CATHOLIC ELEMENTARY SCHOOL English Separate 7 min walk
  • ST LEO CATHOLIC ELEMENTARY SCHOOL (FUTURE ADDRESS FOR MAIN ENTRANCE) English Separate 9 min walk
  • MIMICO ADULT CENTRE English Public 9 min walk
  • PHOENIX MONTESSORI SCHOOL Private 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureMimico-QueenswayMedian neighbourhood
Median household income (2020)$84,000$84,500
Households that own their home53%54%
Population (2021)17,04516,813
Homes built in 1960 or before43%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleMimico-QueenswayCity median
Assault4209.2636.3
Robbery41.569.5
Homicide4.25.3
Auto theft224.2192.6
Theft over $5,00066.446.1
Break and enter132.8172.8
Theft from vehicles99.6188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.