Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
4 open orders or by-law investigations
Needs a closer lookNot resolved in the City's records: 26 266861 PRS 00 IV (Order Issued Property Standards: The heating system or unit is not in good repair and m..., 2026, status Order Issued); 26 266834 PRS 00 IR (Property Standards, 2026, status Order Issued); 26 266685 HEA 00 IV (Notice Issued Adequate Heat, 2026, status Notice Issued); and 1 more.
What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.
How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations13 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Order Issued Property Standards, Property Standards): 26 267819 PRS 00 IR (Property Standards, 2026); 26 172107 000 00 IR (Adequate Heat, 2026); 26 172106 000 00 IR (Property Standards, 2026); and 10 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 25 208045 (Proposal for Domestic Water Piping Replacement, 2025).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications23 development applications open within 300 m
Good to know23 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 68 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development ApplicationsRental building evaluation: 83 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2026 (4 storeys, 45 units, built 1928).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
19 records on file: more than at 100% of Toronto houses (median 0).
- By-law investigation26 267819 PRS 00 IRClosed
Property Standards
Nov 9, 2026 · 58 MAITLAND ST - By-law investigation26 266861 PRS 00 IVOrder Issued
Order Issued Property Standards: The heating system or unit is not in good repair and maintained in good working condition.Namely: Centralized heating system not operational.
Nov 6, 2026 · 58 MAITLAND ST - By-law investigation26 266834 PRS 00 IROrder Issued
Property Standards
Nov 6, 2026 · 58 MAITLAND ST - By-law investigation26 266685 HEA 00 IVNotice Issued
Notice Issued Adequate Heat
Oct 29, 2026 · 58 MAITLAND ST - By-law investigation26 262157 HEA 00 IRNotice Issued
Adequate Heat
Oct 29, 2026 · 58 MAITLAND ST - By-law investigation26 172107 000 00 IRClosed
Adequate Heat
Jun 1, 2026 · 58 MAITLAND ST - By-law investigation26 172106 000 00 IRClosed
Property Standards
Jun 1, 2026 · 58 MAITLAND ST - By-law investigation26 147794 PRS 00 IRClosed
Property Standards
Apr 21, 2026 · 58 MAITLAND ST
Show 11 older records
- By-law investigation26 193193 PRS 00 IVClosed
Order Issued Property Standards: Ceiling not maintained free of holes, cracks, damaged and deteriorated materials, specifically, cracked plaster and flaking paint.; Floor covering not maintained free from trip or other hazardous condition, specifically, hallway carpeting immediately outside of bathroom excessively worn and ; Interior door hardware not maintained in good repair, specifically, door handle loose and insecure.; Meals are being prepared in the room in which the required counter, backsplash and drain board are not impervious to water, specifically, caulking between count; Previously finished ceiling surfaces are not maintained in good repair to provide a reasonably matching texture with the balance of ceiling surfaces.; Previously finished surface not maintained in good repair, specifically, tiles within tub surround are loose and insecure and falling away from wall.; The floor surface cover and finish is not maintained, specifically, linoleum tiles deteriorated with portions missing exposing subflooring.; The lower cupboard is not maintained in good repair and good working order, specifically, both cupboard doors are water damaged and showing swollen wood, deteri; The supplied facility in or on the property, namely the bathtub, is not maintained so that it will function safely and effectively, specifically, the enameled s; Wall not maintained free of holes, damaged and deteriorated materials, specifically wall behind stove shows holes and deteriorated paint.; Walls not maintained free of holes, cracks, damaged and deteriorated materials, specifically, deteriorated and cracked plaster and large gap at junction between
Jan 23, 2026 · 58 MAITLAND ST - By-law investigation26 108640 HEA 00 IRClosed
Adequate Heat
Jan 23, 2026 · 58 MAITLAND ST - By-law investigation26 108607 PRS 00 IRClosed
Property Standards
Jan 23, 2026 · 58 MAITLAND ST - By-law investigation26 108602 HEA 00 IRClosed
Adequate Heat
Jan 23, 2026 · 58 MAITLAND ST - By-law investigation26 108539 PRS 00 IRClosed
Property Standards
Jan 23, 2026 · 58 MAITLAND ST - By-law investigation26 108524 HEA 00 IRClosed
Adequate Heat
Jan 23, 2026 · 58 MAITLAND ST - By-law investigation25 253130 PRS 00 IRClosed
Property Standards
Nov 13, 2025 · 58 MAITLAND ST - By-law investigation25 246276 PRS 00 IRClosed
Property Standards
Oct 29, 2025 · 58 MAITLAND ST - By-law investigation25 224520 PRS 00 IRClosed
Property Standards
Sep 12, 2025 · 58 MAITLAND ST - Building permit25 208045Inspection
Proposal for Domestic Water Piping Replacement
Sep 3, 2025 · 58 MAITLAND ST - Building permit13 140104Closed
Install one backflow preventor device in existing apartment buildling.
Apr 24, 2013 · 58 MAITLAND ST
Check before you build
Site-specific exception 900.2.10(82)
Needs a closer look1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
The lands must comply with exception 900.2.10(4).
- Older by-law A
Section 12(1) 434 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 611 m²
- Frontage
- 11.8 m
- Depth
- 51.8 m
- Street
- Maitland St
- Corner lot
- No
- Public lane
- None
- House footprint
- 421 m²roof up to 14.7 m
- Back yard
- 8.1 mhouse to rear lot line
- Side yards
- 0.5 m and 0.8 mhouse to side lot lines
- Buildings on the lot
- 1house, garage, sheds
- Max height
- 30 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Site and Area Specific Policy 382. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
- Major Transit Station Area: Wellesley. The lot is inside the Wellesley Major Transit Station Area approved by the Province (Site and Area Specific Policy 602). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone R (d2.5) (x82) (Residential). Chapter 10, section 10.10 of the by-law. Source
Around this lot
- Minor variances approved
- 100%18 of 18 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 2
- Development applications
- 40
Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 18 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing three-storey townhouse dwelling by constructing interior alterations to the existing open-to-above area between the basement and ground floor level of the dwelling by enclosing the floor (increasing the area of habitable space).
97 GRANBY ST · Oct 15, 2025 · 452 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached rooming house by constructing a rear four-storey addition. A total of 26 rooms for living accommodation will be provided.
344 JARVIS ST · Sep 21, 2022 · 380 m away - Minor varianceApproved
To convert the existing single family, two-storey building into a two-storey duplex by constructing a front basement walkout and porch.
64 MCGILL ST · Jan 26, 2022 · 475 m away - Minor varianceApproved
To alter the existing three-storey office building by constructing a new elevator and a new dormer over the elevator shaft.
92 ISABELLA ST · Jun 30, 2021 · 445 m away - Minor varianceApproved
To alter the existing three-storey townhouse by constructing side one-storey additions, a rear attached garage with rooftop deck and a side third storey addition.
10 ST JOSEPH ST · Jan 20, 2021 · 397 m away
Latest activity nearby
- Building permit
Proposal for interior alterations to lobby, main corridor, bar & restaurant at ground floor.
475 YONGE ST · Nov 17, 2026 · 293 m away - Building permit
Interior alteration to combine an existing gym room and adjacent pool room into one fitness room.
475 YONGE ST · Nov 10, 2026 · 293 m away - Building permit
1 projecting sign**SHIRIN JAAN**
508 YONGE ST · Nov 5, 2026 · 290 m away - Building permit
1 Wall Sign
522 YONGE ST · Nov 2, 2026 · 283 m away - Building permit
1 Wall Sign*****XI NOODLE HOUSE*****
510 YONGE ST · Nov 2, 2026 · 289 m away - Building permit
Interior renovation of existing X-ray Rooms 240, 219, 236 and 231, to be completed in four sequential phases, with one room renovated at a time. The project also included the installation of three new X-ray machines during Phases 2, 3 and 4.
43 WELLESLEY ST E · Oct 28, 2026 · 99 m away - Zoning review
Notice Sent
508 YONGE ST · Oct 26, 2026 · 290 m away - Zoning review
Closed
12 ALEXANDER ST · Oct 20, 2026 · 227 m away - Zoning review
Closed
508 YONGE ST · Oct 14, 2026 · 290 m away - Building permit
REV01: As bubbled on drawings.HVAC - Proposal for interior alterations to convert existing storage into leasing office and storage.
15 DUNDONALD ST · Sep 30, 2026 · 241 m away
Neighbourhood: Church-Wellesley
About the area around the lot, not the lot itself.
- Nearest station
- Wellesley Station4 min walk
- Nearest TTC stop
- Wellesley St East at Church St1 min walk
- Nearest cycling route
- Wellesley St ECycle Track, 1 min walk
- Nearest traffic count
- 9,966 vehicles in 14 hMaitland St / Church St, 60 m away, Sep 26, 2026
- Serious collisions within 500 m
- 132021–2026, killed or seriously injured: 1 fatal, 10 with pedestrians, 1 with cyclists
- Parks
- Paul Kane House Parkette2 min walk
- Barbara Hall Park3 min walk
- Alexander Street Parkette3 min walk
Schools within 1 km
- NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 2 min walk
- CHURCH ST JR & NATIVE LEARNING CTR English Public 3 min walk
- NATIONAL BALLET SCHOOL - BETTY OLIPHANT THEATRE Private 4 min walk
- THE ABELARD CENTRE FOR EDUCATION Private 4 min walk
- NATIONAL BALLET SCHOOL - THE SHOE ROOM Private 4 min walk
- JARVIS COLLEGIATE INSTITUTE English Public 5 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Church-Wellesley | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $60,400 | $84,500 |
| Households that own their home | 24% | 54% |
| Population (2021) | 22,320 | 16,813 |
| Homes built in 1960 or before | 15% | 29% |
| Homes needing major repairs | 5% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Church-Wellesley | City median |
|---|---|---|
| Assault | 1264.6 | 636.3 |
| Robbery | 93.2 | 69.5 |
| Homicide | 3.3 | 5.3 |
| Auto theft | 46.6 | 192.6 |
| Theft over $5,000 | 106.5 | 46.1 |
| Break and enter | 146.4 | 172.8 |
| Theft from vehicles | 206.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.