Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
TRCA regulated area (69% of lot)
Needs a closer lookPart of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.
What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.
How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details
Ontario Regulation 41/24, TRCA Regulation LimitRavine and natural feature protection (62% of lot)
Needs a closer lookPart of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.
What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.
How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details
Toronto Municipal Code, Chapter 658Building permit open since 2014
Needs a closer lookStill open in the City's records: 06 155124 (Addition as constructed, to existing commercial recreational building for storage of ba..., 2014, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)Natural Heritage System (68% of lot)
Good to knowPart of the lot is in the Natural Heritage System shown on Official Plan Map 9.
What it means. New buildings or additions in that part need a natural heritage impact study.
How to confirm. City Planning confirms the policies that apply. Details
City of Toronto Official Plan, Map 9Work or applications in progress
Good to knowRecent records on this lot: 25 142204 (Proposed 2 new custom picnic shade shelters and all associated structural work, 2025); 24 111720 (Demolition for Park Recreation Expansion, 2024).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications1 Committee of Adjustment file on this lot
Good to know1 approved. A64/03E (To permit Centennial Park Mini Indy (tenant) to operate 50 amusement devices as accesso..., 2003).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
15 records on file: more than at 100% of Toronto houses (median 0).
- Building permit25 142204Inspection
Proposed 2 new custom picnic shade shelters and all associated structural work.
Oct 7, 2025 · 575 CENTENNIAL PARK BLVD - Zoning review24 242827 PSPClosedMar 7, 2025 · 575 CENTENNIAL PARK BLVD
- Building permit24 111720Examiner's Notice Sent
Demolition for Park Recreation Expansion
Feb 5, 2024 · 575 CENTENNIAL PARK BLVD - Building permit06 155124Inspection
Addition as constructed, to existing commercial recreational building for storage of batting cages
Jan 17, 2014 · 575 CENTENNIAL PARK BLVD - Building permit08 160885Closed
To erect a Temporary (non certified) Tent 40' x 60' on the grass picnic area of a Go - Kart display area in Centennial Park for th 20th Anniversaryof Mini Indy Celebration. The tent is to be erected on June 13th/08 and it is to be taken down on June 15th/08.
Jun 3, 2008 · 575 CENTENNIAL PARK BLVD - Zoning review07 173746 LTOClosedApr 25, 2007 · 575 CENTENNIAL PARK BLVD
- Zoning review04 114935 PSPClosedMar 10, 2004 · 575 CENTENNIAL PARK BLVD
- Building permit03 119211Closed
New roof to storage room
Mar 31, 2003 · 575 CENTENNIAL PARK BLVD
Show 7 older records
- Minor varianceA64/03EApproved
To permit Centennial Park Mini Indy (tenant) to operate 50 amusement devices as accessory uses to the existing commercial/recreational facility.
Mar 20, 2003 · 575 CENTENNIAL PARK BLVD - Zoning review02 184695 PSPClosedOct 29, 2002 · 575 CENTENNIAL PARK BLVD
- Building permit02 155078Closed
Temporary Seasonal Tent for "Go Karts" (May-October 2002)
Aug 2, 2002 · 575 CENTENNIAL PARK BLVD - Zoning review02 153200 ZPRClosedJul 3, 2002 · 575 CENTENNIAL PARK BLVD
- Zoning review02 109947 PSPClosedFeb 12, 2002 · 575 CENTENNIAL PARK BLVD
- Building permit01 203735Cancelled
New one storey recreational and meeting activities building.
Dec 18, 2001 · 575 CENTENNIAL PARK BLVD - Zoning review01 193015 LTOClosedNov 7, 2001 · 575 CENTENNIAL PARK BLVD
Lot facts
- Area
- 175,988 m²
- Frontage
- 330.8 mestimated, irregular lot
- Depth
- 889.6 mestimated, irregular lot
- Street
- Centennial Park Blvd
- Corner lot
- Yes, also on Eglinton Ave W889.6 m along it
- Public lane
- None
- House footprint
- Not showna new house or demolition permit since the City's 3D survey
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- —no decisions on file
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 0
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).
Latest activity nearby
Nothing on file within 300 m.
Neighbourhood: Eringate-Centennial-West Deane
About the area around the lot, not the lot itself.
- Nearest TTC stop
- Eglinton Ave West at Commerce Blvd East Side11 min walk
- Nearest cycling route
- Eglinton Ave West TrlMulti-Use Trail - Boulevard, 2 min walk
- Nearest traffic count
- 17,574 vehicles in 8 hCentennial Park Blvd: Centennial Park Trl - Eglinton Ave W, 370 m away, Dec 18, 2018
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
- Parks
- Centennial Park - Etobicoke1 min walk
- Elmbrook Park13 min walk
Schools within 1 km
- HOLLYCREST MDL SCHOOL English Public 16 min walk
- MOTHER CABRINI CATHOLIC ELEMENTARY SCHOOL English Separate 16 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Eringate-Centennial-West Deane | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $108,000 | $84,500 |
| Households that own their home | 84% | 54% |
| Population (2021) | 18,450 | 16,813 |
| Homes built in 1960 or before | 29% | 29% |
| Homes needing major repairs | 6% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Eringate-Centennial-West Deane | City median |
|---|---|---|
| Assault | 393.3 | 636.3 |
| Robbery | 29.9 | 69.5 |
| Shootings | 10 | 10.5 |
| Auto theft | 234 | 192.6 |
| Theft over $5,000 | 24.9 | 46.1 |
| Break and enter | 109.5 | 172.8 |
| Theft from vehicles | 114.5 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.