HousePrecheckCheck an address

575 Centennial Park BlvdToronto · zoning, lot size and permit records

Also 625 Centennial Park Blvd

Open space · ON≈ 330.8 × 889.6 m175,988 m²on Centennial Park Blvdcorner, also on Eglinton Ave W

Not a home

A park or open space

The zoning by-law sets this parcel aside for parks and open space. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 25 142204 (Proposed 2 new custom picnic shade shelters and all associated structural work, 2025); 24 111720 (Demolition for Park Recreation Expansion, 2024). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
≈ 330.8 m frontage≈ 889.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (69% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • Ravine and natural feature protection (62% of lot)

    Needs a closer look

    Part of the lot is in the area covered by the City's Ravine and Natural Feature Protection By-law. The City's map of the area was last published in 2019.

    What it means. In that part, injuring or removing a tree of any size, grading, filling or dumping needs a City permit. Plans for a pool, addition or garden suite there may be refused.

    How to confirm. Urban Forestry confirms where the protected area runs and whether work needs a permit. Details

    Toronto Municipal Code, Chapter 658
  • Building permit open since 2014

    Needs a closer look

    Still open in the City's records: 06 155124 (Addition as constructed, to existing commercial recreational building for storage of ba..., 2014, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Natural Heritage System (68% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 142204 (Proposed 2 new custom picnic shade shelters and all associated structural work, 2025); 24 111720 (Demolition for Park Recreation Expansion, 2024).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A64/03E (To permit Centennial Park Mini Indy (tenant) to operate 50 amusement devices as accesso..., 2003).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

15 records on file: more than at 100% of Toronto houses (median 0).

  • Building permit25 142204Inspection

    Proposed 2 new custom picnic shade shelters and all associated structural work.

    Oct 7, 2025 · 575 CENTENNIAL PARK BLVD
  • Zoning review24 242827 PSPClosed
    Mar 7, 2025 · 575 CENTENNIAL PARK BLVD
  • Building permit24 111720Examiner's Notice Sentdemolition

    Demolition for Park Recreation Expansion

    Feb 5, 2024 · 575 CENTENNIAL PARK BLVD
  • Building permit06 155124Inspection

    Addition as constructed, to existing commercial recreational building for storage of batting cages

    Jan 17, 2014 · 575 CENTENNIAL PARK BLVD
  • Building permit08 160885Closed

    To erect a Temporary (non certified) Tent 40' x 60' on the grass picnic area of a Go - Kart display area in Centennial Park for th 20th Anniversaryof Mini Indy Celebration. The tent is to be erected on June 13th/08 and it is to be taken down on June 15th/08.

    Jun 3, 2008 · 575 CENTENNIAL PARK BLVD
  • Zoning review07 173746 LTOClosed
    Apr 25, 2007 · 575 CENTENNIAL PARK BLVD
  • Zoning review04 114935 PSPClosed
    Mar 10, 2004 · 575 CENTENNIAL PARK BLVD
  • Building permit03 119211Closed

    New roof to storage room

    Mar 31, 2003 · 575 CENTENNIAL PARK BLVD
Show 7 older records
  • Minor varianceA64/03EApproved

    To permit Centennial Park Mini Indy (tenant) to operate 50 amusement devices as accessory uses to the existing commercial/recreational facility.

    Mar 20, 2003 · 575 CENTENNIAL PARK BLVD
  • Zoning review02 184695 PSPClosed
    Oct 29, 2002 · 575 CENTENNIAL PARK BLVD
  • Building permit02 155078Closed

    Temporary Seasonal Tent for "Go Karts" (May-October 2002)

    Aug 2, 2002 · 575 CENTENNIAL PARK BLVD
  • Zoning review02 153200 ZPRClosed
    Jul 3, 2002 · 575 CENTENNIAL PARK BLVD
  • Zoning review02 109947 PSPClosed
    Feb 12, 2002 · 575 CENTENNIAL PARK BLVD
  • Building permit01 203735Cancellednew building

    New one storey recreational and meeting activities building.

    Dec 18, 2001 · 575 CENTENNIAL PARK BLVD
  • Zoning review01 193015 LTOClosed
    Nov 7, 2001 · 575 CENTENNIAL PARK BLVD

Lot facts

Area
175,988 m²
Frontage
330.8 mestimated, irregular lot
Depth
889.6 mestimated, irregular lot
Street
Centennial Park Blvd
Corner lot
Yes, also on Eglinton Ave W889.6 m along it
Public lane
None
House footprint
Not showna new house or demolition permit since the City's 3D survey
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Site and Area Specific Policy 029. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
  • Zone ON (Open Space Natural). Chapter 90, section 90.20 of the by-law. Source

Around this lot

Minor variances approved
—no decisions on file
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 0 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

Nothing on file within 300 m.

Neighbourhood: Eringate-Centennial-West Deane

About the area around the lot, not the lot itself.

Nearest TTC stop
Eglinton Ave West at Commerce Blvd East Side11 min walk
Nearest cycling route
Eglinton Ave West TrlMulti-Use Trail - Boulevard, 2 min walk
Nearest traffic count
17,574 vehicles in 8 hCentennial Park Blvd: Centennial Park Trl - Eglinton Ave W, 370 m away, Dec 18, 2018
Serious collisions within 500 m
12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Centennial Park - Etobicoke1 min walk
Elmbrook Park13 min walk

Schools within 1 km

  • HOLLYCREST MDL SCHOOL English Public 16 min walk
  • MOTHER CABRINI CATHOLIC ELEMENTARY SCHOOL English Separate 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureEringate-Centennial-West DeaneMedian neighbourhood
Median household income (2020)$108,000$84,500
Households that own their home84%54%
Population (2021)18,45016,813
Homes built in 1960 or before29%29%
Homes needing major repairs6%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleEringate-Centennial-West DeaneCity median
Assault393.3636.3
Robbery29.969.5
Shootings1010.5
Auto theft234192.6
Theft over $5,00024.946.1
Break and enter109.5172.8
Theft from vehicles114.5188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.