Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 574 Eglinton Ave W
574 Eglinton Ave W is on a 10 m by 39.5 m lot on Eglinton Ave W in Forest Hill North. The zoning is CR. A site-specific exception, 900.11.10(2631), changes some of the usual rules for this address. The lot also fronts Gilgorm Rd.
The City has 22 records on this lot since 1998. That is more than at 99% of Toronto houses. In 2023, a building permit was filed: "Protection of standpipe systems at all stations". Status: approved. In 2023, a building permit was filed: "Revision 02 - addition of platform edge bollards. (refer to typical design approvals in ads 22 193328, 22 200930, 22 216439 and 22 216647)revision 01 - rooftop…". Status: closed. In 2023, a building permit was filed: "Installation of the future presto faregates to the transit subway station that where not included in building permit 16-205165 - chaplin station". Status: closed. Nothing on file is open right now.
Within 300 m, 1 development application is open (the tallest up to 7 storeys). Within 300 m, the Committee of Adjustment decided 47 minor variance applications in the last 10 years and approved 91%. Chaplin station is a 1-minute walk.
Summary
What the City's records show on this house
- Site-specific exception 900.11.10(2631)Moderate
- 1 development application open within 300 mLowFree check
- Yonge-Eglinton Secondary PlanLow
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
City files on this lot
22 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-09-17 | By-law investigation26 239008 WST 00 IR | Waste | Closed | |
| 2026-09-08 | By-law investigation26 234079 WST 00 IR | Waste | Closed | |
| 2026-06-25 | By-law investigation26 191655 WST 00 IR | Waste | Closed | |
| 2026-06-15 | By-law investigation26 184969 WST 00 IR | Waste | Closed | |
| 2026-02-10 | By-law investigation26 115855 WST 00 IR | Waste | Closed | |
| 2024-01-08 | Building permit24 102487 | Alternative solution - per sentence 3.13.5.4.(1) of OBC, each rapid transit station must be "monitored" by a central supervising station (CSS) conforming to CAN/ULC-S561. Based on the definition of CSS and overall approach to fire safety in rapid transit stations and the role played by the CSS, our position of this provision is that monitoring in this context is not exclusively limited to monitoring of the fire alarm system. Further, it is our position that the intent behind this sentence is to ensure that the CSS meets the high level of reliability that would be achieved by complying with CAN/ULC-S561, including the robust fire alarm, emergency power and security requirements contained within this standard.Based on the review described in the SenezCo report dated January 8 2024, accompanying this submission, the coordination of system response for different fire emergencies, will provide the level of protection intended by OBC Sentences 3.13.5.4.(1) and 3.13.5.6.(2) for communication to the central supervising station, including the use of a certified 3rd party monitoring company to relay signals from the station fire alarm panels.Further, the BOCC was designed and constructed in a manner that substantially meets or otherwise meets the intent of CAN/ULC S561, and the functions intended by the OBC definition of a central supervising station. On this basis, and with the implementation of the protocols described in the SenezCo report, the operation of the transit system from the BOCC by CTS affords the level of protection anticipated by the OBC for transit stations | Cancelled | |
| 2023-07-11 | Building permit23 172592 | Protection of Standpipe systems at all Stations | Approved | |
| 2023-04-11 | Building permit16 205165 | Revision 02 - addition of platform edge bollards. (Refer to typical design approvals in ADS 22 193328, 22 200930, 22 216439 and 22 216647)Revision 01 - Rooftop screen louvre added. Incl Alternative Solution 19-259678Roof reconstruction and east facade restoration to be done due to to the demolition of adjacent building for the Eglinton LRT line.Construction of the Eglinton LRT line at Chaplin Station | Closed | |
| 2023-01-17 | Building permit22 239202 | Installation of the future Presto Faregates to the transit subway station that where not included in building permit 16-205165 - Chaplin Station | Closed | |
| 2022-09-08 | Building permit22 200897 | Provide edge installation for bollard barriers | Cancelled | |
| 2020-06-23 | Building permit20 157080 | Installation of a stacked transportation use office trailer at main entrance of ECLRT - Chaplin stationCROSSLINX TRANSIT SOLUTIONS | Closed | |
| 2020-06-16 | Building permit20 156710 | Installation of a stacked office trailer at main entrance of ECLRT - Chaplin Station | Cancelled | |
| 2017-10-12 | Zoning review17 246674 ZPR | No description on file | Closed | |
| 2017-10-06 | Zoning review13 139377 PSP | No description on file | Closed | |
| 2017-01-06 | Building permit17 101512 | Egress from Service Areas | Approved | |
| 2016-03-07 | Building permit16 120201 | Demolish existing building for the future Main Entrance to the Eglinton LRT line | Closed | |
| 2013-03-24 | Development application13 139377 NNY 16 SA | Eglinton Crosstown LRT Chaplin Station | Closed | |
| 2012-08-24 | Zoning review12 235271 ZPR | No description on file | Closed | |
| 2012-08-24 | Zoning review12 235260 ZPR | No description on file | Cancelled | |
| 2011-10-05 | Zoning review11 287660 ZZC | No description on file | Closed | |
| 2008-04-29 | Building permit06 138473 | Revise second floor plans and use (Residential to Club) - | Cancelled | |
| 1998-08-12 | Zoning review98 026511 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(2631)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(2631)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Yonge-Eglinton Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2631)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR SS2 (x2631)
- Height limit
- 16 m
- Corner lot
- Yes, also on Gilgorm Rd
- Public lane
- None
- House footprint
- 213 m²
- Back yard
- 12.9 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m, up to 7 storeys
- 5 suite and multiplex permits within 300 m in 10 years
- 47 minor variance decisions within 300 m, 91% approved
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 6 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Forest Hill North neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Chaplin StationNearest station1 min walk
- Chaplin Station Eastbound PlatformNearest TTC stop1 min walk
- Eglinton Ave WNearest cycling route1 min walk
- Forest Hill Collegiate InstituteSchool5 min walk
- North Preparatory Jr Public SchoolSchool6 min walk
- Oriole Park Jr Public SchoolSchool10 min walk
- Alive Montessori and Private SchoolSchool12 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3412.3
- Robberycity median 69.57.2
- Auto theftcity median 192.672.3
- Theft over $5,000city median 46.150.6
- Break and entercity median 172.8159.1
- Theft from vehiclescity median 188.179.6
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist