HousePrecheckCheck an address

573 Gerrard St EToronto · zoning, lot size and permit records

Commercial residential · CR 2.5 (c2.0; r2.0) SS2 (x2223)28.1 × 46.5 m1,209 m²on Gerrard St Ecorner, also on Hamilton St

Not a home

Carpark 146

The City of Toronto's real estate inventory lists Carpark 146 here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Transit, rail or parkingGood access, with trains, buses or cars and some noise.
  • Permits or applications open on this parcelStill open in the City's records: 08 210464 (Proposal to construct a Chinese Monument Archway at north-west corner of existing parki..., 2008, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 3 development applications open within 300 m, up to 10 storeysNew buildings may go up around here in the next years. More change nearby than at 85% of Toronto houses.
N20 m
28.1 m frontage46.5 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • Building permit open since 2008

    Needs a closer look

    Still open in the City's records: 08 210464 (Proposal to construct a Chinese Monument Archway at north-west corner of existing parki..., 2008, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A0410/06TEY (The applicant is seeking relief from the provisions of Zoning By-law No. 438-86, as ame..., 2006).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 3 development applications open within 300 m

    Good to know

    3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 10 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

7 records on file: more than at 97% of Toronto houses (median 0).

  • Building permit08 210464Inspection

    Proposal to construct a Chinese Monument Archway at north-west corner of existing parking lot.

    Oct 9, 2008 · 573 GERRARD ST E
  • Building permit07 109965Cancelled

    Proposed commemorative concrete archway on corner of Gerrard St East and Hamilton St. Current property is a surface parking lot, and portion of archway encroaches on City property. Encroachment application has been applied for, see enclosed.

    Feb 16, 2007 · 573 GERRARD ST E
  • Minor varianceA0410/06TEYApproved

    The applicant is seeking relief from the provisions of Zoning By-law No. 438-86, as amended, to construct a decorative archway on a podium with approximate dimensions of 18.31 metres by 8.2 metres.

    Jul 26, 2006 · 573 GERRARD ST E
  • Zoning review06 154135 ZSVClosed
    Jul 7, 2006 · 573 GERRARD ST E
  • Zoning review05 212703 ZPRClosed
    Dec 30, 2005 · 573 GERRARD ST E
  • Zoning review03 175637 ZPRClosed
    Sep 17, 2003 · 573 GERRARD ST E
  • Zoning review85 026297 LTOClosed
    Jan 8, 1985 · 573 GERRARD ST E

Check before you build

  • Site-specific exception 900.11.10(2223)

    Needs a closer look

    1 site-specific rule and 1 older by-law that still prevails apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.11.10(2223)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270(a) of former City of Toronto By-law 438-86

  2. Older by-law A

    These premises must comply with Exception 900 11.10(2). Prevailing By-laws and Prevailing Sections: (A) Section 12(2) 270(a) of former City of Toronto By-law 438-86

2 parts for other addresses
  • B On 348 Broadview Ave., former City of Toronto by-law 576-82.
  • B On 348 Broadview Ave., former City of Toronto by-law 576-82.
By-law 569-2013, Chapter 900

Lot facts

Area
1,209 m²
Frontage
28.1 m
Depth
46.5 m
Street
Gerrard St E
Corner lot
Yes, also on Hamilton St46.5 m along it
Public lane
None
Max height
14 m
Max lot coverage
—
  • Zone CR 2.5 (c2.0; r2.0) SS2 (x2223) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
  • 7 City trees in front of this lot. The City's street tree inventory lists 7 trees at this address: honey locust (42 cm), honey locust (25 cm), honey locust (22 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
88%21 of 24 decisions
Garden suite permits
0
Laneway suite permits
1
Multiplex permits
9
Development applications
5

Within 300 m, last 10 years. 10 suite and multiplex permits: more than at 75% of Toronto houses (median 3). 24 variance decisions: more than at 55% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new mixed-use development (common-element condominium) containing a three-storey townhouse development (reviewed as a mixed-use building) containing 12 units (including two live/work units) with front porches with stairs, front third storey balconies, rear ground floor decks, side (east and west) second floor balconies, rooftop decks, rear below-grade integral garages and one rear (south) surface parking space. Also, to construct a three-storey detached house (Unit 13) at the rear of the lot, fronting Munroe Street, with a covered front (west) porch with stairs, a side (north) integral garage and a side (north) second floor balcony. There will be a total of 13 dwelling units on this lot (12 dwelling units within the townhouses and one dwelling unit within the detached house). Shared access will be provided by a new private lane through the lot. A related Site Plan Application (File 18 155186 STE 30 SA) is under review.

    563 GERRARD ST E · Apr 1, 2026 · 67 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached mixed-use building by constructing a rear three-storey addition. There will be a total of one commercial unit (hair salon) and two residential dwelling units on this lot (one existing commercial unit occupying the first level, one existing dwelling unit occupying the second and third levels, as well as one new dwelling unit occupying the first, second and third levels).

    310 BROADVIEW AVE · Oct 15, 2025 · 113 m away
  • Minor varianceApproved

    To convert the existing two-storey mixed-use building into a hotel.

    674 GERRARD ST E · Jan 8, 2025 · 310 m away
  • Minor varianceApproved

    To alter the existing two-storey detached dwelling by constructing a rear three-storey addition, a front basement walkout, a side (east) third storey balcony, and rear second and third storey terraces. This building will contain a total of five residential dwelling units.

    666 GERRARD ST E · Oct 16, 2024 · 295 m away
  • Minor varianceApproved

    To alter the existing two-storey mixed-use building (including one commercial unit and one residential unit) by constructing a rear one-storey addition with a rooftop terrace (to be added to the residential unit) and a rear ground floor patio.

    718 GERRARD ST E · Apr 26, 2023 · 441 m away

Latest activity nearby

  • Zoning review

    Closed

    612 GERRARD ST E · Nov 24, 2026 · 164 m away
  • Building permitsecondary suite

    Proposal for 3 storey rear addition to add a second unit to a mixed-use building.

    310 BROADVIEW AVE · Nov 24, 2026 · 113 m away
  • Minor variancePending

    To alter the existing three-storey semi-detached dwelling by constructing a rear third storey addition (above the second storey roof).

    189 MUNRO ST · Nov 10, 2026 · 167 m away
  • Minor variancePending

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition (sunroom) with a skylight roof structure.

    191 MUNRO ST · Nov 9, 2026 · 166 m away
  • Zoning review

    Notice Sent

    189 MUNRO ST · Oct 2, 2026 · 167 m away
  • Zoning review

    Notice Sent

    191 MUNRO ST · Sep 30, 2026 · 166 m away
  • Building permit

    Proposal to replace front porch with new.

    157 MUNRO ST · Sep 29, 2026 · 252 m away
  • Zoning review

    Notice Sent

    173 HAMILTON ST · Sep 23, 2026 · 207 m away
  • Building permit

    Install a backwater valve

    207 MUNRO ST · Sep 11, 2026 · 119 m away
  • Building permit

    Proposal for 3rd floor addition over existing 2 storey section of the house, 3 storey east side addition on 3 levels, 1 storey north rear addition, interior renovationsOriginal Permits : 26 146737 BLD 00 SR and 26 146737 BLD 01 SR

    22 SIMPSON AVE · Sep 1, 2026 · 210 m away

Neighbourhood: South Riverdale

About the area around the lot, not the lot itself.

Nearest station
Broadview Station23 min walk
Nearest TTC stop
Gerrard St East at Broadview Ave1 min walk
Nearest cycling route
Gerrard St EBike Lane, 3 min walk
Nearest traffic count
17,034 vehicles in 14 hGerrard St E / Broadview Ave, 60 m away, Oct 8, 2025
Serious collisions within 500 m
42021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 2 with cyclists
Parks
Hubbard Park1 min walk
Riverdale Park East4 min walk
Riverdale Park West5 min walk

Schools within 1 km

  • EASTDALE COLLEGIATE INSTITUTE English Public 6 min walk
  • SEED ALTERNATIVE SCHOOL English Public 6 min walk
  • QUEEN ALEXANDRA MDL SCHOOL English Public 7 min walk
  • DUNDAS JR PUBLIC SCHOOL English Public 8 min walk
  • WITHROW AVE JR & QUEST ALTERNATIVE SR English Public 10 min walk
  • SPRUCECOURT JR PUBLIC SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureSouth RiverdaleMedian neighbourhood
Median household income (2020)$100,000$84,500
Households that own their home57%54%
Population (2021)27,81516,813
Homes built in 1960 or before52%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleSouth RiverdaleCity median
Assault828.7636.3
Robbery69.369.5
Shootings3.210.5
Auto theft217.4192.6
Theft over $5,00088.246.1
Break and enter264.7172.8
Theft from vehicles349.8188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.