Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 572 Palmerston Ave
572 Palmerston Ave is on a 7.6 m by 38.2 m lot on Palmerston Ave in Annex. The zoning is R.
The City has 11 records on this lot since 2018. That is more than at 99% of Toronto houses. In 2024, a building permit was filed: "Drain - proposal to demolish existing rear one storey garage and construct two storey laneway suite". Status: closed. In 2022, a Committee of Adjustment application was filed: "To construct a two-storey ancillary building (laneway suite) containing a two-car garage and a second floor balcony in the rear yard of the existing duplex…". Status: closed. In 2021, a building permit was filed: "Proposed interior alterations to basement to create new dwelling unit to existing three storey two-unit dwelling". Status: closed. Nothing on file is open right now.
Within 300 m, 1 development application is open. Bathurst station is a 5-minute walk, and the lot is in its Major Transit Station Area.
Summary
What the City's records show on this house
- Records mention laneway suite, multiplex, second unitModerateFree check
- 2 by-law investigations closed in the last two yearsLow
- A garden suite may lack room for its fire access pathLowFree check
- 1 development application open within 300 mLowFree check
- 3 Committee of Adjustment files on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
1 thing to check before you offer.
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- Records mention laneway suite, multiplex, second unit
- 2 by-law investigations closed in the last two years
- No open orders or by-law investigations
What this part means for this house, in plain EnglishUnlock
Records mention laneway suite, multiplex, second unit
ModerateCheck before you offerSee the basement apartment check for this house
What the record shows, what it means for you and what to doUnlock
2 by-law investigations closed in the last two years
LowCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
3 Committee of Adjustment files on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by addressWhat this means: Committee of Adjustment
City files on this lot
11 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2026-01-19 | By-law investigation26 106099 HEA 00 IR | Adequate Heat | Closed | |
| 2025-10-28 | By-law investigation25 246171 HEA 00 IR | Adequate Heat | Closed | |
| 2024-02-05 | Building permit22 204494 | Drain - Proposal to demolish existing rear one storey garage and construct two storey laneway suite | Closed | |
| 2022-06-22 | Minor varianceA1325/21TEY | To construct a two-storey ancillary building (laneway suite) containing a two-car garage and a second floor balcony in the rear yard of the existing duplex building, and will be accessed by the abutting laneway (Cosimo Tucci Lane). Also, to construct a new ground floor deck at the rear of the existing duplex building. | Approved | |
| 2021-09-21 | Zoning review21 215928 ZZC | No description on file | Closed | |
| 2021-05-26 | Building permit19 195362 | Proposed Interior Alterations to basement to create new dwelling unit to existing three storey Two-Unit dwelling. | Closed | |
| 2021-02-17 | Minor varianceA0874/20TEY | To alter the three-storey detached house, containing a secondary suite on the second and third floors, by performing interior alterations to create an additional secondary suite in the basement, for a total of three dwelling units. | Approved | |
| 2019-04-09 | Building permit19 112737 | Proposal to construct a third storey addition to a detached house containing a secondary suite and construct rear decks and third storey roof deck | Closed | |
| 2018-12-13 | Building permit18 268299 | New laneway suite | Cancelled | |
| 2018-12-05 | Building permit18 179618 | PROPOSED BASEMENT INTERIOR ALTERATION. PROPOSED GROUND FLOOR INTERIOR ALTERATION WITH REAR NEW PATIO. PROPOSED SECOND FLOOR. INTERIOR ALTERATION. | Closed | |
| 2018-11-28 | Minor varianceA0743/18TEY | To alter the existing two-storey detached dwelling by constructing a third storey addition and a secondary suite. | Approved |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- No heritage listing or designation
- No site-specific zoning exception
What this part means for this house, in plain EnglishUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
- On record: multiplex, laneway suite, second unit
- Garden suite: needs a closer look
What this part means for this house, in plain EnglishUnlock
A garden suite may lack room for its fire access path
LowCheck if it appliesSee the garden suite check for this house
What the record shows, what it means for you and what to doUnlock
The lot and what the rules allow
- Zone
- R (d0.6)
- Height limit
- 11 m
- Corner lot
- No
- Public lane
- Cosimo Tucci Lane, 7.6 m along it
- New house permit
- None since 2000
- House footprint
- 104 m²
- Back yard
- 21.2 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 1 development application open within 300 m
- In the Bathurst station area
- 32 suite and multiplex permits within 300 m in 10 years
What this part means for this house, in plain EnglishUnlock
1 development application open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 3 of 8 categories
- Theft over $5,000: 2.5 times the Toronto median
- Break and enter: 2.2 times the Toronto median
- Assault: 1.7 times the Toronto median
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Annex neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Bathurst StationNearest station5 min walk
- Bloor St West at Palmerston AveNearest TTC stop2 min walk
- Palmerston AveNearest cycling route1 min walk
- Monsignor Fraser College - Annex CampusSchool3 min walk
- Palmerston Avenue Jr Public SchoolSchool5 min walk
- City As School TorontoSchool6 min walk
- Harbord Collegiate InstituteSchool7 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.31080.9
- Robberycity median 69.580.5
- Homicidecity median 5.35.2
- Shootingscity median 10.55.2
- Auto theftcity median 192.6116.9
- Theft over $5,000city median 46.1114.3
- Break and entercity median 172.8387.1
- Theft from vehiclescity median 188.1220.9
Ready emails
Copy and send as they are.
3 questions for the seller and your lawyer, written outUnlock
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 28, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist