HousePrecheckCheck an address

570 Shaw StToronto · zoning, lot size and permit records

80.1 × 209.2 m16,688 m²on Dewson Stcorner, also on Shaw Stbacks onto Ln W Shaw S Harbord

Not a home

Central Commerce Collegiate

The City of Toronto's real estate inventory lists Central Commerce Collegiate here, on City land in City use. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Green space next doorShade, play and walks; busy parks also bring events and evening noise.
  • Permits or applications open on this parcelRecent records on this lot: 25 168681 (enclosing existing skylight with new standing seam roof system and structural walkway u..., 2025). Larger work can mean noise and trucks next door; read what each one is for.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
N50 m
80.1 m frontage209.2 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2014

    Needs a closer look

    Still open in the City's records: 15 215314 (Proposal for structural cluster column repairs and window replacement in the existing s..., 2015, status Permit Issued); 14 149330 (Proposal to reconstruct the facade and parapet wall at the front entrance (south side)..., 2014, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • Work or applications in progress

    Good to know

    Recent records on this lot: 25 168681 (enclosing existing skylight with new standing seam roof system and structural walkway u..., 2025).

    What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.

    How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

15 records on file: more than at 100% of Toronto houses (median 0).

  • By-law investigation26 167518 GRA 00 IRNotice Issued

    Graffiti

    May 26, 2026 · 570 SHAW ST
  • Building permit25 168681Inspection

    enclosing existing skylight with new standing seam roof system and structural walkway upgrades in attic

    Jun 26, 2025 · 570 SHAW ST
  • Building permit25 101464Closed

    Proposed closing two unused skylights

    Jan 29, 2025 · 570 SHAW ST
  • Building permit15 215314Permit Issued

    Proposal for structural cluster column repairs and window replacement in the existing secondary school.

    Sep 30, 2015 · 570 SHAW ST
  • Building permit15 162343Closed

    Installation of rooftop photovoltaic arrays on the roof the existing school ( Central Commerce Collegiate)

    Jun 25, 2015 · 570 SHAW ST
  • Building permit15 114745Closed

    In conjunction with an existing secondary school located on the premises, proposal to erect and display one illuminated ground sign at a height of 2.43 metres and containing two sign faces, each displaying static and readograph copy, along the easterly-facing frontage, perpendicular to and directed toward Shaw Street. Each of the two sign faces are to be 2.48 metres in width by 1.35 metres in length. The readograph component of the proposed sign is to be 2.23 metres in width by 0.64 metres in length.**Central Toronto Academy**

    Feb 13, 2015 · 570 SHAW ST
  • Zoning review14 256674 ZSVClosed
    Nov 25, 2014 · 570 SHAW ST
  • Building permit14 149330Inspection

    Proposal to reconstruct the facade and parapet wall at the front entrance (south side) of an existing secondary school.

    May 14, 2014 · 570 SHAW ST
Show 7 older records
  • Building permit11 245682Closed

    Proposal to install 1 backflow prevention device in an existing secondary school - Central Commerce Collegiate.

    Aug 4, 2011 · 570 SHAW ST
  • Building permit09 193863Closed

    Permit to repair exterior slab in existing secondary school

    Dec 18, 2009 · 570 SHAW ST
  • Building permit06 145264Closed - Dormant

    Replace 3 boilers, and 12 existing floor drains in existing basement mechanical room of existing secondary school. Also see PLD 06-145291

    Nov 24, 2006 · 570 SHAW ST
  • Building permit06 145291Closed

    Replace 3 boilers, and 12 existing floor drains in existing basement mechanical room of existing secondary school. Also see Mechanical 06-145264.

    Jun 12, 2006 · 570 SHAW ST
  • Building permit01 135054Closed

    Install fire alarm system.

    May 31, 2001 · 570 SHAW ST
  • Building permit98 013870Closed - Dormant

    INSTALL 18 LAB SINKS AND 2 EYE WASH SINKS JNB

    Mar 19, 1998 · 570 SHAW ST
  • Building permit97 024671Closed

    MAKE INTERIOR ALTERATIONS TO PORTIONS OF THE 2ND AND 3RD FLOORS. /LM

    Dec 29, 1997 · 570 SHAW ST

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
16,688 m²
Frontage
80.1 m
Depth
209.2 m
Street
Dewson St
Corner lot
Yes, also on Shaw St209.2 m along it
Public lane
Ln W Shaw S Harbord, 4.8 m along it
House footprint
5,820 m²roof up to 26.6 m
Back yard
12.4 mhouse to rear lot line
Side yards
0.5 m and 18.2 mhouse to side lot lines
Buildings on the lot
9house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • 38 City trees in front of this lot. The City's street tree inventory lists 38 trees at this address: maple, norway (72 cm), maple, norway (62 cm), maple, norway (60 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
84%51 of 61 decisions
Garden suite permits
4
Laneway suite permits
28
Multiplex permits
24
Development applications
0

Within 300 m, last 10 years. 56 suite and multiplex permits: more than at 99% of Toronto houses (median 3). 61 variance decisions: more than at 92% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To alter the existing two-and-one-half-storey storey semi-detached by constructing a rear second storey addition (cantilevered at the northeast corner of the dwelling), a rear third storey addition with a deck (above the second storey roof), and a rear ground floor deck with stairs.

    235 GRACE ST · Oct 14, 2026 · 451 m away
  • Minor varianceApproved

    To alter the existing two-storey semi-detached dwelling by constructing a partial rear second storey addition (above the existing one-storey rear portion of the dwelling), including an extension to the existing rear one-storey portion.

    23 JERSEY AVE · Jul 15, 2026 · 486 m away
  • Minor varianceApproved

    To alter the rear two-storey detached ancillary building (containing one dwelling unit with a cantilevered second storey at the south side, and east and west side canopies), by adding a second dwelling unit within this ancillary building. This ancillary building is currently under construction with an authorized building permit. There will be a total of six residential dwelling units on this lot (four units within the main semi-detached building, and two units within the ancillary building).

    585 SHAW ST · Jul 15, 2026 · 84 m away
  • Minor varianceApproved

    To construct a new two-storey detached ancillary building (to contain one laneway suite), in the rear yard, abutting the laneway. There will be a total of four residential dwelling units on this lot (three units within the main building and one unit within the ancillary building).

    711 CRAWFORD ST · Jul 8, 2026 · 485 m away
  • Minor varianceApproved

    To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear third storey addition. The existing artificial turf in the rear yard will be replaced with soft landscaping (a total area of 39.73 m2).

    492 CRAWFORD ST · Mar 18, 2026 · 160 m away

Latest activity nearby

  • Building permit

    Proposal for underpinning and finishing the basement

    504 CRAWFORD ST · Nov 26, 2026 · 143 m away
  • Building permitsecondary suite

    rev 02: add a solid fuel-burning fireplace on the main floor Revision 01 - to add basement window well Revision: second and third floor addition. 2nd 16.73m2, 3rd 36.75m2

    324 MONTROSE AVE · Nov 26, 2026 · 227 m away
  • Building permit

    Party Wall Admin Permit for 364 ROXTON RD (26 270195 BLD 00 SR)

    362 ROXTON RD · Nov 19, 2026 · 73 m away
  • Building permit

    Proposal for interior alterations, new windows, drain and plumbing.

    364 ROXTON RD · Nov 17, 2026 · 72 m away
  • Building permit

    Basement underpinning

    308 ROXTON RD · Nov 13, 2026 · 157 m away
  • Minor variancePending

    To construct a new three-storey semi-detached apartment building with front and rear basement walkouts, front and rear ground floor decks with stairs, and front and rear second storey balconies. Also, to construct a new rear two-storey ancillary building (containing one laneway suite, abutting the laneway) with a basement, and a side (east) second storey cantilever extension. There will be a total of seven residential dwelling units on this lot (six units occupying the apartment building, and one unit occupying the ancillary building).

    493 OSSINGTON AVE · Nov 10, 2026 · 240 m away
  • Minor variancePending

    To construct a new three-storey detached dwelling (houseplex) with a basement secondary unit, front and rear third storey balconies, a front ground floor covered porch with stairs, and front exterior stairs providing access to the basement level. Also, to construct a new one-storey detached ancillary building (one-car garage) in the rear yard, abutting the laneway. The existing two-storey detached dwelling and rear detached garage will be demolished. There will be a total of two residential dwelling units on this lot.

    521 CRAWFORD ST · Nov 6, 2026 · 175 m away
  • Building permit

    Proposed is a 55 sqm interior alteration to remodel the kitchen and powder room on first floor, as well as bathroom on the second floor and a wall removal on the third floor

    475 SHAW ST · Nov 5, 2026 · 243 m away
  • Building permit

    Proposal for interior alterations including finished basement, new windows and related drain and plumbing permits.

    364 ROXTON RD · Oct 30, 2026 · 72 m away
  • Building permit

    Proposed to convert garage to an office and expand the floating rear deck

    452 CRAWFORD ST · Oct 28, 2026 · 225 m away

Neighbourhood: Palmerston-Little Italy

About the area around the lot, not the lot itself.

Nearest station
Ossington Station10 min walk
Nearest TTC stop
Harbord St at Ossington Ave East Side3 min walk
Nearest cycling route
Shaw StBike Lane - Contraflow, 1 min walk
Nearest traffic count
8,141 vehicles in 8 hRoxton Rd / Harbord St, 130 m away, Nov 14, 2005
Serious collisions within 500 m
32021–2026, killed or seriously injured: 0 fatal, 2 with pedestrians, 1 with cyclists
Parks
Art Eggleton Park5 min walk
Bickford Park5 min walk
Fred Hamilton Playground7 min walk

Schools within 1 km

  • CENTRAL TORONTO ACADEMY & HORIZON ALTERNATIVE SR English Public 1 min walk
  • MONTROSE JR & DELTA ALTERNATIVE SR English Public 4 min walk
  • DEWSON STREET JR PUBLIC SCHOOL English Public 5 min walk
  • WEST END ALTERNATIVE SCHOOL English Public 9 min walk
  • OSSINGTON OLD ORCHARD JR PUBLIC SCHOOL English Public 9 min walk
  • ST FRANCIS OF ASSISI CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigurePalmerston-Little ItalyMedian neighbourhood
Median household income (2020)$88,000$84,500
Households that own their home42%54%
Population (2021)13,12016,813
Homes built in 1960 or before73%29%
Homes needing major repairs9%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peoplePalmerston-Little ItalyCity median
Assault654.6636.3
Robbery113.869.5
Shootings7.110.5
Auto theft113.8192.6
Theft over $5,00028.546.1
Break and enter256.2172.8
Theft from vehicles142.3188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.