Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: listed
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage RegisterCultural Heritage Evaluation Report required
Needs a closer lookThis property is listed under Official Plan Amendment 720: a heritage evaluation is needed before redevelopment.
What it means. Plans to tear down or rebuild will need a heritage evaluation first.
How to confirm. Heritage Planning at the City confirms the status. Details
Official Plan Amendment 720Building permit open since 2022
Needs a closer lookStill open in the City's records: 22 128256 (Proposal for Interior Alterations to washrooms of University of Saint Michael's college..., 2022, status Permit Issued).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)6 development applications open within 300 m
Good to know6 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 62 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
10 records on file: more than at 99% of Toronto houses (median 0).
- By-law investigation26 254145 ELS 00 IRClosed
Election Signs
Oct 14, 2026 · 57 QUEEN'S PARK CRES E - Building permit22 151285Closed
HVAC - Proposal for an exterior barrier free ramp, interior alterations to universal washrooms and a stairwell in an existing University - Teefy Hall, University of Saint Michael's College
Jul 21, 2022 · 57 QUEEN'S PARK CRES E - Building permit22 128256Permit Issued
Proposal for Interior Alterations to washrooms of University of Saint Michael's college on 2nd, 3rd and 4th floor.
Apr 22, 2022 · 57 QUEEN'S PARK CRES E - Building permit17 148163Closed
HVAC - Interior Alterations, new boiler room from existing mechanical room, new shafts from basement to roof, and conversion of heating system to use natural gas instead of steam.
Jun 19, 2017 · 100 ST JOSEPH ST - Zoning review15 131455 ZZCClosedMar 24, 2015 · 57 QUEEN'S PARK CRES E
- Building permit14 194877Closed
INSTALLATION OF MAGLOCK & RED PULL STATION ON AN EGRESS DOOR OF THE OFFICE SPACE ON THE FOURTH FLOOR OF THE UNIVERSITY OF ST. MICHAEL'S COLLEGE.
Aug 14, 2014 · 57 QUEEN'S PARK CRES E - Building permit14 135982Closed
Proposal to install one backflow prevention device in the University of Toronto building - "St. Michael's College"
Apr 1, 2014 · 57 QUEEN'S PARK CRES E - Building permit13 209623Closed
Proposal to install one backflow prevention device in University of Toronto building - "Carr Hall Residence" - Convienence address is 100 St Joseph St.
Aug 7, 2013 · 57 QUEEN'S PARK CRES E
Show 2 older records
- Building permit03 189966Closed
replace fire alarm panel, (NOTE; WORK BEING DONE AT 100 ST JOSEPH ST-- CONV. ADDRESS)
Nov 12, 2003 · 57 QUEEN'S PARK CRES E - Building permit00 128961Closed - Dormant
Install 2 - RT DX fancoil units and air-cooled condensers to provide air conditioning for auditorium. (Cass Hall Auditorium) conv. address 100 St. Joseph St.
Apr 13, 2000 · 57 QUEEN'S PARK CRES E
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 8,592 m²
- Frontage
- 90 mestimated, irregular lot
- Depth
- 112.5 mestimated, irregular lot
- Street
- St Joseph St
- Corner lot
- Yes, also on Queen's Park Cres E112.5 m along it
- Public lane
- None
- House footprint
- 972 m²roof up to 22.6 m
- Back yard
- 26.7 mhouse to rear lot line
- Side yards
- 14.4 m and 41 mhouse to side lot lines
- Buildings on the lot
- 5house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: maple, norway (41 cm), honey locust ruby lace (20 cm), horsechestnut (18 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%6 of 6 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 9
Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 6 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-Law 1422-2017), for the 40-storey mixed-use building by: increasing the podium height (from 3-storeys to 6-storeys); and altering building setbacks (in order to consolidate the non-residential institutional uses within the podium). No changes to the tower or residential uses are proposed. Also, to reduce the minimum required number of parking spaces for institutional uses (from 11 parking spaces to 5 parking spaces), which will be located within underground parking level P1.
70 ST MARY ST · Feb 26, 2025 · 212 m away - Minor varianceApproved
To alter the development standards for the site (as approved under Site Specific Zoning By-law 778-2016(OMB)), for the existing 44-storey mixed-use building, by constructing mezzanine space. Also, to convert the existing two-and-one-half-storey townhouses (located at the northeast corner on this lot, municipally known as 7 and 9 Gloucester Street) into mixed-use buildings, and to increase the non-residential gross floor areas.
593 YONGE ST · Nov 27, 2024 · 486 m away - Minor varianceApproved
To construct interior alterations and permit a recreation use (use not permitted with additional total interior floor area) for the expansion of the existing yoga studio on the second and third floors to the ground floor and the basement of the existing three-storey commercial building.
680 YONGE ST · Nov 20, 2024 · 443 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1030-2022) for a new 40-storey mixed-use building, by increasing the building height, and to reduce the minimum number of vehicular parking spaces, the setback of the mechanical penthouse, and residential amenity space (indoor and outdoor).
95 ST JOSEPH ST · Oct 16, 2024 · 169 m away - Minor varianceApproved
To alter the existing 9-storey commercial building by constructing a front ground floor one-storey addition (vestibule with an integrated rain water management system) fronting Sultan Street between two office condominium units (5 and 7 Sultan Street).
7 SULTAN ST · Jul 31, 2024 · 336 m away
Latest activity nearby
- Zoning review
Application Acceptable
95 ST JOSEPH ST · Nov 24, 2026 · 169 m away - Building permit
Proposed Hydro Vault Repairs
1001 BAY ST · Nov 13, 2026 · 296 m away - Zoning review
Closed
1033 BAY ST · Oct 22, 2026 · 277 m away - Building permit
Proposal to divide one large office into two individual offices.
50 ST JOSEPH ST · Oct 16, 2026 · 174 m away - Consent (lot split)Approved
To obtain consent to create new stratified easements/rights-of-way and to maintain existing easements/rights-of-way.
2 ST THOMAS ST · Oct 14, 2026 · 286 m away - Building permit
Proposal for phase 3 project construction of universal washrooms on floors 2, 4, 5, 6 and 7.
56 WELLESLEY ST W · Sep 15, 2026 · 269 m away - Zoning review
Closed
1033 BAY ST · Sep 11, 2026 · 277 m away - Building permit
Demountable stage for entertainers for performing on for event
111 WELLESLEY ST W · Sep 10, 2026 · 281 m away - Building permit
PROPOSED REPLACEMENT OF LIFE SAFETY EQUIPMENT
3 ELMSLEY PL · Aug 24, 2026 · 111 m away - Building permit
Proposal to demolish existing office building down to grade. See also 25-213516 STE 13 OZ
1075 BAY ST · Aug 18, 2026 · 283 m away
Neighbourhood: Bay-Cloverhill
About the area around the lot, not the lot itself.
- Nearest station
- Museum Station5 min walk
- Nearest TTC stop
- Queen's Park Cres East at St Joseph St North Side1 min walk
- Nearest cycling route
- Queen's Park CresCycle Track, 1 min walk
- Nearest traffic count
- 9,598 vehicles in 14 hQueen's Park Cres E / St Joseph St, 80 m away, Oct 15, 2025
- Serious collisions within 500 m
- 72021–2026, killed or seriously injured: 1 fatal, 2 with pedestrians, 2 with cyclists
- Parks
- Queen's Park1 min walk
- Clover Hill Park3 min walk
- Dr. Lillian McGregor Park6 min walk
Schools within 1 km
- TORONTO SCHOOL OF THEOLOGY - U OF T, BLDG 434 University 1 min walk
- ST JOSEPH'S COLLEGE SCHOOL English Separate 3 min walk
- ROSEDALE DAY SCHOOL Private 6 min walk
- MUNK SCHOOL OF GLOBAL AFFAIRS GRAHAM LIBRARY - U OF T, BLDG 12C University 8 min walk
- MUNK SCHOOL OF GLOBAL AFFAIRS AT TRINITY - U OF T, BLDG 12A University 8 min walk
- THE YMCA ACADEMY SECONDARY SCHOOL Private 8 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Bay-Cloverhill | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $58,400 | $84,500 |
| Households that own their home | 30% | 54% |
| Population (2021) | 16,670 | 16,813 |
| Homes built in 1960 or before | 4% | 29% |
| Homes needing major repairs | 3% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Bay-Cloverhill | City median |
|---|---|---|
| Assault | 601.9 | 636.3 |
| Robbery | 74.7 | 69.5 |
| Auto theft | 16.6 | 192.6 |
| Theft over $5,000 | 87.2 | 46.1 |
| Break and enter | 286.4 | 172.8 |
| Theft from vehicles | 145.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.