Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: designated (Part IV)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register10 building permits open, the oldest since 2011
Needs a closer lookStill open in the City's records: 16 188896 (Proposed alterations to replace floor assemblies of 3 vestibules 2 transepts sacristy,..., 2020, status Inspection); 11 312418 (Revision to 11 312418 - Change of use of basement temporary storage room (4th revision)..., 2018, status Revision Issued); 17 226915 (Proposal to replace exterior stairs, guard, handrails, retaining wall and fence to exis..., 2017, status Inspection); and 7 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)1 Committee of Adjustment file on this lot
Good to know1 approved. A0349/15TEY (To alter the place of worship by constructing a rear one-storey addition, 2015).
What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.
How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details
City of Toronto, Committee of Adjustment applications (2001 onwards)14 development applications open within 300 m
Good to know14 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 71 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
21 records on file: more than at 100% of Toronto houses (median 0).
- Building permit16 188896Inspection
Proposed alterations to replace floor assemblies of 3 vestibules 2 transepts sacristy, corridor and washrooms - St Micheals Cathedral
Dec 7, 2020 · 57 BOND ST - Building permit18 256919Closed
The applicant has proposed to erect two single-sided illuminated ground signs displaying both static copy and readograph copy displayed electronically, each measuring 5.03 metres by 1.61 metres at a height of 5.03 metres, one erected on the westerly property front gage and one erected on the easterly property frontage. See associated sign variance application No. 18-182116. ***ST MICHAEL'S CATHEDRAL***
Dec 14, 2018 · 57 BOND ST - Zoning review18 182116 ZSVClosedJun 21, 2018 · 57 BOND ST
- Building permit11 312418Revision Issued
Revision to 11 312418 - Change of use of basement temporary storage room (4th revision) To revert to crypt chapel worship space as the original permit revision number 4
Mar 12, 2018 · 57 BOND ST - Building permit17 226915Inspection
Proposal to replace exterior stairs, guard, handrails, retaining wall and fence to existing place of worship. St Micheal's Cathedral.
Nov 23, 2017 · 57 BOND ST - Building permit16 263671Closed
install maglock at basement door RB-26
Dec 15, 2016 · 57 BOND ST - Building permit16 155367Closed
Proposal to install new sprinklers
Jun 13, 2016 · 57 BOND ST - Building permit16 121670Cancelled
Updating sprinklers to meed code
Feb 29, 2016 · 57 BOND ST
Show 13 older records
- Building permit15 112879Revision Issued
Rev 01: Includes replacement of existing clomuns located in nave with concrete columns. Revised structural columns.Base permit: Proposal to eliminate structural steel framing in existing basement columns.
Dec 1, 2015 · 57 BOND ST - Building permit15 234021Inspection
Proposal for interior alterations for structural steel framing to reconstruct the floor of the sanctuary in the cathedral of an existing place of worship - "St. Michael's Cathedral"
Nov 20, 2015 · 57 BOND ST - Building permit15 253394Approved
Alternative solution relating to the integrity of the exits in the existing place of worship.
Nov 18, 2015 · 57 BOND ST - Building permit15 253387Approved
Alternative solution relating to the fire separations in the exsiting place of worship.
Nov 18, 2015 · 57 BOND ST - Building permit14 267640Revision Issued
REVISION - stuctural reinforcements to the existing Bishop's Sacristy portion of the building to facilitate the additon approved by the base permit
Nov 4, 2015 · 57 BOND ST - Building permit14 143904Closed
REVISION - as per drawings Proposal for interior alterations on the basement, ground, first, second, third storey of "Hogan House", residential portion of "St. Michael's Cathedral"
Jul 22, 2015 · 57 BOND ST - Minor varianceA0349/15TEYApproved
To alter the place of worship by constructing a rear one-storey addition.
May 27, 2015 · 57 BOND ST - Building permit14 262212Inspection
Proposal for interior alterations for structural steel supports for future lighting in existing Place of Worhip - "St. Michael's Cathedral"
Jan 5, 2015 · 57 BOND ST - Building permit14 257727Permit Issued
Proposal for mechanical standalone permit to install 2 new air handling units in an existing place of worship. Minor structural work as a result of the installation is proposed.
Dec 11, 2014 · 57 BOND ST - Building permit14 151833Revision Issued
Revision" as per inspectors request see dwgsTo install a new fire alarm system on the ground floor, balcony, and two cat walks of the existing St Michaels Church.
Aug 15, 2014 · 57 BOND ST - Building permit11 237735Inspection
Proposal for interior demolition to St. Michaels Church. Construction permit to be applied for at a later date.
Nov 18, 2011 · 57 BOND ST - Zoning review11 266767 ZPRClosedAug 31, 2011 · 57 BOND ST
- Building permit05 156360Closed
Certified Tent 20'x 45' clearspan 00-55037
Jul 12, 2005 · 57 BOND ST
Check before you build
Site-specific exception 900.11.10(2162)
Needs a closer look3 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Older by-law A
Section 12(2) 132 of former City of Toronto By-law 438-86
- Older by-law B
Section 12(2) 216 of former City of Toronto By-law 438-86
- Older by-law C
Section 12(2) 260 of former City of Toronto By-law 438-86.
Lot facts
- Area
- 3,783 m²
- Frontage
- 60 mestimated, irregular lot
- Depth
- 77.8 mestimated, irregular lot
- Street
- Bond St
- Corner lot
- Yes, also on Shuter St77.8 m along it
- Public lane
- None
- House footprint
- 1,489 m²roof up to 57.1 m
- Back yard
- 5.6 mhouse to rear lot line
- Side yards
- 6.9 m and 19.8 mhouse to side lot lines
- Buildings on the lot
- 4house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Major Transit Station Area: Dundas. The lot is inside the Dundas Major Transit Station Area approved by the Province (Site and Area Specific Policy 604). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Priority retail street: Church Street. The lot is on a priority retail street. In this zone at least 60% of the ground floor along that street must hold retail, restaurants, offices or similar uses, with entrances within 5 m of the lot line and 60% of the ground floor wall in windows or doors. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone CR 4.0 (c2.0; r4.0) SS1 (x2162) (Commercial Residential). Chapter 40, section 40.10 of the by-law. Source
- 3 City trees in front of this lot. The City's street tree inventory lists 3 trees at this address: elm, wych (60 cm), maple, norway (57 cm), maple, norway (45 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 96%22 of 23 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 13
- Development applications
- 51
Within 300 m, last 10 years. 13 suite and multiplex permits: more than at 80% of Toronto houses (median 3). 23 variance decisions: more than at 54% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.
332 YONGE ST · Oct 14, 2026 · 453 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 1334-2023(OLT)) for the 44-storey mixed-use building, by increasing the overall height of the building (from 133.2 m to 134.75 m measured to the top of the mechanical penthouse) and height of the podium (from 30 m to 30.5 m), reducing the setbacks, and reducing the first storey building frontage abutting the priority retail street (Dundas Steet East). There will be a total of 542 residential dwelling units on this lot. A Site Plan Control application (File Number 21 218559 STE 13 SA) is currently under review.
212 DUNDAS ST E · Jul 15, 2026 · 421 m away - Minor varianceApproved
To construct a commercial parking lot (surface parking facility), which will contain 13 parking spaces (including one accessible parking space), with vehicular access from Harbour Light Lane. The existing two-storey non-residential building (located at 134 Jarvis Street) will be demolished.
134 JARVIS ST · Nov 12, 2025 · 276 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 183 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 194 m away
Latest activity nearby
- Minor variancePending
To alter the development standards (as approved under Site Specific Zoning By-Law 690-2021 and 691-2021), for a new 57-storey mixed-use building with four-level underground parking by reducing the required long-term bicycle parking spaces. A related Site Plan Control application (under File number 20 21 152905 STE 13 SA) has been approved. There will be a total of 445 residential dwelling units on this lot, 53 vehicular parking spaces, 201 long-term bicycle parking spaces, and 45 visitor bicycle parking spaces.
60 QUEEN ST E · Dec 16, 2026 · 223 m away - Building permit
Proposal for interior alterations with mechanical, plumbing, and electrical work to suit new layout on floor 4.
99 QUEEN ST E · Nov 20, 2026 · 280 m away - Building permit
nstallation of Eighteen (18) electromagnetic locking device including all associated life safety requirements
50 RICHMOND ST E · Nov 19, 2026 · 292 m away - Building permit
Proposal to replace existing pre-action system fire control panel and associated initiating field devices.
30 BOND ST · Nov 19, 2026 · 163 m away - Zoning review
Closed
220 YONGE ST · Nov 10, 2026 · 288 m away - Zoning review
Closed
2 QUEEN ST E · Nov 10, 2026 · 293 m away - Zoning review
Not Started
21 DUNDAS SQ · Nov 6, 2026 · 230 m away - Building permit
Proposed interior alterations to existing tenant retail space.
220 YONGE ST · Nov 6, 2026 · 288 m away - Building permit
Proposal for interior alterations to an existing retail store to accommodate a new tenant.
220 YONGE ST · Nov 6, 2026 · 288 m away - Building permit
Installation of a seasonal decorative Christmas wreath (designated structure) attached to the exterior wall of a retail store, Le Maison Simons, for the Christmas season.
260 YONGE ST · Nov 6, 2026 · 282 m away
Neighbourhood: Downtown Yonge East
About the area around the lot, not the lot itself.
- Nearest station
- TMU Station5 min walk
- Nearest TTC stop
- Dundas St East at Church St2 min walk
- Nearest cycling route
- Shuter StCycle Track, 1 min walk
- Nearest traffic count
- 15,846 vehicles in 14 hChurch St / Shuter St, 60 m away, May 29, 2024
- Serious collisions within 500 m
- 192021–2026, killed or seriously injured: 2 fatal, 14 with pedestrians, 1 with cyclists
- Parks
- 45 Dalhousie St Park2 min walk
- Arena Gardens2 min walk
- Toronto Metropolitan University Square5 min walk
Schools within 1 km
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 1 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 1 min walk
- ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 1 min walk
- ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 1 min walk
- TORONTO METROPOLITAN UNIVERSITY - SCHOOL OF INTERIOR DESIGN University 5 min walk
- TMU - HEIDELBERG CENTRE SCHOOL OF GRAPHIC COMM'NS MGMT University 5 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Downtown Yonge East | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $69,500 | $84,500 |
| Households that own their home | 36% | 54% |
| Population (2021) | 17,700 | 16,813 |
| Homes built in 1960 or before | 7% | 29% |
| Homes needing major repairs | 4% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Downtown Yonge East | City median |
|---|---|---|
| Assault | 2360.8 | 636.3 |
| Robbery | 143.3 | 69.5 |
| Shootings | 11.9 | 10.5 |
| Auto theft | 75.6 | 192.6 |
| Theft over $5,000 | 99.5 | 46.1 |
| Break and enter | 274.7 | 172.8 |
| Theft from vehicles | 390.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.