Everything here comes from public records: City of Toronto open data, TRCA and Statistics Canada, 15 sets in all. Each item leads to the record it comes from. Our sources
This house at a glance
Each score from 0 to 10: 0 needs attention, 10 all clear. Build potential is how much more you could add.
About 567 Shuter St
567 Shuter St is on a 7.1 m by 10.2 m lot on Shuter St in Regent Park. The zoning is CR. A site-specific exception, 900.11.10(2382), changes some of the usual rules for this address.
The City has 11 records on this lot since 1992. That is more than at 99% of Toronto houses. In 2007, a building permit was filed: "Proposal to construct 14 new freehold townhouses & a pari of semi-detached houses with common elements. see final & binding - a0747/05tey. lead file". Status: closed. In 2006, a Committee of Adjustment application was filed: "The site is located at the south west corner of shuter street and river street. the applicant is seeking relief from the provisions of zoning by-law no…". Status: closed. In 2000, a building permit was filed: "Demolish 1 storey service station". Status: closed. Nothing on file is open right now.
Within 300 m, 7 development applications are open (the tallest up to 48 storeys). Within 300 m, the Committee of Adjustment decided 28 minor variance applications in the last 10 years and approved 82%. The nearest TTC stop is River St at Dundas St East South Side, a 3-minute walk.
Summary
What the City's records show on this house
- Site-specific exception 900.11.10(2382)Moderate
- 7 development applications open within 300 mLowFree check
- Downtown Plan Secondary PlanLow
- 1 Committee of Adjustment file on this lotLowFree check
Left unchecked, any of these can mean unexpected costs, trouble after closing, or plans you can't carry out. Found before you offer, they give you room to negotiate. The full report explains what each one means for this house and what to do next.
15 sets of public records, already checked for you. Searching each one yourself and working out what it means for you takes time. We have done that work: what matters about this house and lot, in plain English, in a few minutes.
What to find out first
What to find out before an offer, the steps to take, what each costs and how long it takesUnlock
Open City files
How much in the City's records needs answers before an offer
- No open orders or by-law investigations
- No permits left open for years
- No work or applications in progress
What this part means for this house, in plain EnglishUnlock
1 Committee of Adjustment file on this lot
LowFor later, once you own itSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What this means: Committee of Adjustment
City files on this lot
11 records on file, more than at 99% of Toronto houses (median 0 records).
| Date | Record | As the City filed it | In plain words | Status |
|---|---|---|---|---|
| 2008-05-28 | Zoning review08 163397 ZPR | No description on file | Closed | |
| 2007-05-14 | Zoning review07 210508 000 | No description on file | Cancelled | |
| 2007-04-16 | Building permit06 198949 | Proposal to construct 14 new freehold townhouses & a pari of Semi-detached houses with common elements. See Final & Binding - A0747/05TEY. LEAD FILE | Closed | |
| 2006-12-20 | Building permit06 198966 | Site servicing for 16 new town homes (in connection to BLD 06 198949 B01-B16) | Cancelled | |
| 2006-02-01 | Minor varianceA0747/05TEY | The site is located at the south west corner of Shuter Street and River Street. The applicant is seeking relief from the provisions of Zoning By-law No. 438-86, as amended, to construct a series of two and three storey townhouse buildings. A total of 16 units are proposed contained with tree buildings. Two buildings, with a total of five units, will face River Street. A third building, having a total of 11 units, will face Shuter Street. Parking will be provided on the ground floor of the units and at the rear of the lot. | Approved | |
| 2005-09-13 | Zoning review05 180066 ZPR | No description on file | Closed | |
| 2004-02-18 | Zoning review04 110238 PSP | No description on file | Closed | |
| 2003-04-10 | Zoning review03 123100 ZPR | No description on file | Closed | |
| 2000-10-27 | Building permit00 336294 | demolish 1 storey service station. | Closed | |
| 1995-02-08 | Zoning review95 024617 LTO | No description on file | Closed | |
| 1992-03-19 | Zoning review92 025312 LTO | No description on file | Closed |
Restrictions
How much heritage, nature and site-specific rules limit changes to the house
- Site-specific exception 900.11.10(2382)
- No heritage listing or designation
What this part means for this house, in plain EnglishUnlock
Site-specific exception 900.11.10(2382)
ModerateCheck if it appliesWhat the record shows, what it means for you and what to doUnlock
Downtown Plan Secondary Plan
LowFor later, once you own itWhat the record shows, what it means for you and what to doUnlock
What this means: Toronto zoning by address
If you want to change or build
What the site-specific rules mean for an addition, a garage or a rebuild.
Site-specific exception 900.11.10(2382)
What the exception changes for this address, rule by ruleUnlock
Flood and erosion rules
How much of the lot lies in the areas TRCA regulates for flooding and erosion
- Outside the areas TRCA regulates
From TRCA's regulated areas only. Basement flooding, sewer back-up and the TRCA flood plain are not in this score yet; ask the seller and your insurer about water in the basement.
What this part means for this house, in plain EnglishUnlock
Build potential
How much more the rules allow on this lot, beyond what is on record
What this part means for this house, in plain EnglishUnlock
The lot and what the rules allow
- Zone
- CR 2.0 (c1.0; r1.5) SS2 (x2382)
- Height limit
- 12 m
- Corner lot
- No
- Public lane
- None
- House footprint
- 43 m²
- Back yard
- 0.1 m
- Buildings on the lot
- 1
House and yards from the City's 3D Massing; a survey gives exact figures.
What you can build
Why, measured on this lot, and the most you could buildUnlock
Building nearby
How much neighbours are building and applying to change within 300 m
- 7 development applications open within 300 m, up to 48 storeys
- 2 suite and multiplex permits within 300 m in 10 years
- 28 minor variance decisions within 300 m, 82% approved
What this part means for this house, in plain EnglishUnlock
7 development applications open within 300 m
LowCheck if it appliesSee the next door check for this house
What the record shows, what it means for you and what to doUnlock
What the City allowed next door
Within 500 m, last 10 years: a guide if you plan to build or apply for something similar.
What neighbours have built and changed around you, and how the City decidedUnlock
Area safety
Police-reported crime in the neighbourhood against the Toronto median
- Lower than the Toronto median in 5 of 7 categories
Neighbourhood rates per 100,000 people from the Toronto Police Service, not this street.
What this part means for this house, in plain EnglishUnlock
Regent Park neighbourhood
About the area, not this house.
2021 Census, against the median Toronto neighbourhood
Getting around and schools
- Castle Frank StationNearest station30 min walk
- River St at Dundas St East South SideNearest TTC stop3 min walk
- Shuter StNearest cycling route1 min walk
- Nelson Mandela Park Public SchoolSchool4 min walk
- St Paul Catholic Elementary SchoolSchool8 min walk
- Inglenook Community SchoolSchool10 min walk
- Queen Alexandra Mdl SchoolSchool11 min walk
Police-reported crime, 2025, per 100,000 people
- Assaultcity median 636.3947.8
- Robberycity median 69.583.5
- Shootingscity median 10.56
- Auto theftcity median 192.695.4
- Theft over $5,000city median 46.111.9
- Break and entercity median 172.8166.9
- Theft from vehiclescity median 188.1125.2
What we checked, and what the City's records don't cover
We checked 48 sets of City of Toronto, TRCA and Statistics Canada open data for this address, last updated Nov 27, 2026. Our records don't cover flooding history, ownership and mortgages, or the condition of the house: ask the seller and your insurer about water in the basement, your lawyer about title, and book a home inspection.
See every source and when we loaded it · Pre-offer checklist