Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: listed
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused. A listing is not registered on title, so a title search will not show it.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage RegisterWork or applications in progress
Good to knowRecent records on this lot: 25 104892 (Proposal for balcony guardrail, wood deck and stair remedial work, 2025).
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development ApplicationsRecords mention multiplex
Good to knowPermits or Committee of Adjustment files on this lot mention multiplex: 25 104892 (Proposal for balcony guardrail, wood deck and stair remedial work, 2025).
What it means. Check that the unit you would buy matches what was approved, and that its permit was closed after final inspection.
How to confirm. Ask the seller for the permit and final inspection. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards)21 development applications open within 300 m
Good to know21 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 75 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
3 records on file: more than at 81% of Toronto houses (median 0).
- By-law investigation26 110785 SNI 00 IRClosed
Snow and Ice
Jan 29, 2026 · 561 CHURCH ST - Building permit25 104892Inspection
Proposal for balcony guardrail, wood deck and stair remedial work.
Apr 7, 2025 · 561-575 CHURCH ST - Building permit24 253440Cancelled
Proposal for balcony guardrail, wood deck and stair remedial work.
Dec 24, 2024 · 561-575 CHURCH ST
Check before you build
Site-specific exception 900.2.10(874)
Needs a closer look3 site-specific rules and 2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.
Zoning By-law 569-2013, Chapter 900
These parts of the exception apply to this lot's address.
- Rule A
The lands must comply with exception 900.2.10(4)
- Rule B
On a lot , a tourist home is permitted
- Rule C
Any lot used as a tourist home must provide one parking space for the principal dwelling unit on the lot if such parking space existed on the lot either prior to or during the use of the building as a tourist home .
- Older by-law A
Section 12(5)(h) of former City of Toronto By-law 438-86
- Older by-law E
On 561 Church St., former City of Toronto by-laws 26-76 and 28-76
7 parts for other addresses
- B On 71 Charles St. E., 589 Church St., 72 Isabella St., former City of Toronto by-laws 506-77 and 507-77
- C On 77 Charles St. E., former City of Toronto by-law 580-89
- D On the odd numbered addresses of 99-103 Charles St. E., 568 Jarvis St. City of Toronto by-law 577-09
- F On the odd numbered addresses of 577-585 Church St., the even numbered addresses of 86-96 Gloucester St., 79 Isabella St., former City of Toronto by-law 28-76
- G On 19 Dundonald St., former City of Toronto by-law 532-83
- H On 36 Dundonald St., former City of Toronto by-law 363-80
- I On the even numbered addresses of 90-92 Isabella St., former City of Toronto by-laws 362-78 and 363-78.
Lot facts
- Area
- 899 m²
- Frontage
- 23.7 m
- Depth
- 43.7 m
- Street
- Gloucester St
- Corner lot
- Yes, also on Church St43.7 m along it
- Public lane
- None
- House footprint
- 505 m²roof up to 13.7 m
- Back yard
- 14.2 mhouse to rear lot line
- Side yards
- 0.9 m and 4.6 mhouse to side lot lines
- Buildings on the lot
- 2house, garage, sheds
- Max height
- 13 m
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- Site and Area Specific Policy 382. The Official Plan has a policy for this site or area that varies the general rules. Read it before relying on zoning alone. Source
- Major Transit Station Area: Bloor-Yonge. The lot is inside the Bloor-Yonge Major Transit Station Area approved by the Province (Site and Area Specific Policy 600). Source
- Downtown Plan Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
- Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
- Zone R (d1.0) (x874) (Residential). Chapter 10, section 10.10 of the by-law. Source
Around this lot
- Minor variances approved
- 95%21 of 22 decisions
- Garden suite permits
- 0
- Laneway suite permits
- 0
- Multiplex permits
- 4
- Development applications
- 47
Within 300 m, last 10 years. 4 suite and multiplex permits: more than at 54% of Toronto houses (median 3). 22 variance decisions: more than at 53% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the existing two-storey semi-detached dwelling by constructing a rear two-storey addition, a complete third storey addition and a rear rooftop terrace. The existing home occupation will be maintained.
63 ST NICHOLAS ST · Feb 15, 2023 · 395 m away - Minor varianceApproved
To convert a semi-enclosed storage area on the ground floor of the existing apartment building to a commercial kitchen.
50 EARL ST · Sep 15, 2021 · 483 m away - Minor varianceApproved
To alter the existing three-storey office building by constructing a new elevator and a new dormer over the elevator shaft.
92 ISABELLA ST · Jun 30, 2021 · 141 m away - Minor varianceApproved
To alter the existing three-storey townhouse by constructing side one-storey additions, a rear attached garage with rooftop deck and a side third storey addition.
10 ST JOSEPH ST · Jan 20, 2021 · 389 m away - Minor varianceApproved
To convert a semi-enclosed storage area on the ground floor to a commercial kitchen.
50 EARL ST · Dec 4, 2020 · 483 m away
Latest activity nearby
- Building permit
REV: Proposed revision for ventilation adjustments based on as-built conditionProposal to replace heating plant, domestic hot water heating, potable water distribution, ventilation and air conditioning systems.
2 GLOUCESTER ST · Nov 3, 2026 · 296 m away - Building permit
Interior renovation of existing X-ray Rooms 240, 219, 236 and 231, to be completed in four sequential phases, with one room renovated at a time. The project also included the installation of three new X-ray machines during Phases 2, 3 and 4.
43 WELLESLEY ST E · Oct 28, 2026 · 298 m away - Building permit
REV 01: Revision to permit to include two risers Proposal to replace heating riser.
110 CHARLES ST E · Oct 20, 2026 · 280 m away - Building permit
PROPOSED EXTERIOR WALL REPAIRS
620 CHURCH ST · Oct 5, 2026 · 185 m away - Building permit
REV01: As bubbled on drawings.HVAC - Proposal for interior alterations to convert existing storage into leasing office and storage.
15 DUNDONALD ST · Sep 30, 2026 · 288 m away - Building permit
Proposal for installation of an art work on the front face of existing building. Weight 150kg
519 CHURCH ST · Sep 25, 2026 · 129 m away - Zoning review
Cancelled
584 CHURCH ST · Sep 22, 2026 · 83 m away - Building permit
REV 01: Proposed 4th unit in basementProposal for interior alterations, including the replacement of the staircase from the ground floor to the basement and the addition or replacement of non-structural walls. There are no changes to any exterior doors or windows. New beams and columns are being added in the basement.
109 GLOUCESTER ST · Jul 24, 2026 · 146 m away - Building permit
Proposed repairs to the underground parking facility, performing localized concrete repairs to the property parking garage ramp, as well as waterproofing repairs
71 CHARLES ST E · Jul 15, 2026 · 190 m away - Building permit
Interior renovation of existing X-ray Rooms 240, 219, 236 and 231, to be completed in four sequential phases, with one room renovated at a time. The project also included the installation of three new X-ray machines during Phases 2, 3 and 4.
43 WELLESLEY ST E · Jul 10, 2026 · 298 m away
Neighbourhood: Church-Wellesley
About the area around the lot, not the lot itself.
- Nearest station
- Wellesley Station5 min walk
- Nearest TTC stop
- Wellesley St East at Church St3 min walk
- Nearest cycling route
- Wellesley St ECycle Track, 4 min walk
- Nearest traffic count
- 8,585 vehicles in 14 hChurch St / Gloucester St, 40 m away, Sep 9, 2025
- Serious collisions within 500 m
- 112021–2026, killed or seriously injured: 0 fatal, 6 with pedestrians, 3 with cyclists
- Parks
- Barbara Hall Park2 min walk
- Paul Kane House Parkette3 min walk
- Charles Street Parkette3 min walk
Schools within 1 km
- THE ABELARD CENTRE FOR EDUCATION Private 1 min walk
- HUMBER COLLEGE - INTERNATIONAL GRADUATE SCHOOL College 5 min walk
- JARVIS COLLEGIATE INSTITUTE English Public 6 min walk
- NATIONAL BALLET SCHOOL - MAISON STAINES HOUSE & SALLE CURRIE HALL Private 6 min walk
- MONSIGNOR FRASER COLLEGE - ISABELLA CAMPUS English Separate 7 min walk
- MONSIGNOR FRASER COLLEGE - ISABELLA NORTH English Separate 7 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Church-Wellesley | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $60,400 | $84,500 |
| Households that own their home | 24% | 54% |
| Population (2021) | 22,320 | 16,813 |
| Homes built in 1960 or before | 15% | 29% |
| Homes needing major repairs | 5% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Church-Wellesley | City median |
|---|---|---|
| Assault | 1264.6 | 636.3 |
| Robbery | 93.2 | 69.5 |
| Homicide | 3.3 | 5.3 |
| Auto theft | 46.6 | 192.6 |
| Theft over $5,000 | 106.5 | 46.1 |
| Break and enter | 146.4 | 172.8 |
| Theft from vehicles | 206.3 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.