HousePrecheckCheck an address

554 Harvie AveToronto · zoning, lot size and permit records

Residential multiple · RM (f12.0; u4; d0.8) (x252)20.4 × 38.4 m783 m²on Harvie Avecorner, also on Carrington Ave

Not a single house

A rental apartment building

The City's RentSafeTO program evaluates this building as a rental apartment building (three storeys and ten units or more). Build options for a house do not apply.

Looking at a house nearby? What this means for you

  • 4 storeys, 15 rental units, built 1958More people, cars and deliveries than a street of houses alone. A tall building also shades the lots to its north.
  • 1 development application open within 300 mNew buildings may go up around here in the next years. More change nearby than at 55% of Toronto houses.
  • City upkeep score: 95 out of 100RentSafeTO rates common areas, building systems and records. A low score can show from the street.

Want to check this building before you buy?

We are building checks for apartment buildings. Leave your email and we will tell you when it is ready.

N10 m
20.4 m frontage38.4 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 3 by-law investigations closed in the last two years

    Good to know

    Closed files (Order Issued Property Standards, Property Standards): 26 228295 PRS 00 IR (Property Standards, 2026); 25 192485 PRS 00 IV (Order Issued Property Standards: Required guard does not prevent the passage of a spher..., 2025); 25 192469 PRS 00 IR (Property Standards, 2025).

    What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • 1 development application open within 300 m

    Good to know

    1 rezoning, site plan, subdivision or condominium application within 300 m, submitted in the last 10 years, is not closed yet. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications
  • Rental building evaluation: 95 out of 100

    Good to know

    The City's RentSafeTO program evaluated this rental building in 2025 (4 storeys, 15 units, built 1958).

    What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.

    How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details

    City of Toronto, RentSafeTO Apartment Building Evaluations

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

4 records on file: more than at 88% of Toronto houses (median 0).

  • By-law investigation26 228295 PRS 00 IRClosed

    Property Standards

    Aug 28, 2026 · 554 HARVIE AVE
  • By-law investigation25 192485 PRS 00 IVClosed

    Order Issued Property Standards: Required guard does not prevent the passage of a spherical object having a diameter of 100 millimetres.Namely, throughout the building stairwells.; The required guard has members, attachments or openings that will facilitate climbing.Namely, throughout the building stairwells.

    Jul 11, 2025 · 554 HARVIE AVE
  • By-law investigation25 192469 PRS 00 IRClosed

    Property Standards

    Jul 11, 2025 · 554 HARVIE AVE
  • Building permit12 182496Closed

    Balcony repairs and balcony guards replacement (6), to an existing Appartment Building.

    May 31, 2012 · 554 HARVIE AVE

Check before you build

  • Site-specific exception 900.6.10(252)

    Needs a closer look

    1 site-specific rule applies to this lot. It can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.6.10(252)Applies

These parts of the exception apply to this lot's address.

  1. Rule A

    The minimum lot frontage is 8.0 metres for a detached house .

3 parts for other addresses
  • A On the lands municipally known in the year 2009 as 1500 Weston Road, City of Toronto By-law 1268-2009(OMB)
  • B On the lands municipally known as 601, 603 and 605 Oakwood Avenue, City of Toronto By-law 593-2008.
  • C On 441 Jane Street, City of Toronto by-law 106-2015.
By-law 569-2013, Chapter 900

Lot facts

Area
783 m²
Frontage
20.4 m
Depth
38.4 m
Street
Harvie Ave
Corner lot
Yes, also on Carrington Ave38.4 m along it
Public lane
None
House footprint
319 m²roof up to 12.6 m
Back yard
11.5 mhouse to rear lot line
Side yards
1.5 m and 3.4 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
11 m
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Minimum frontage 12 m. Frontage is about 20.4 m: meets the zone minimum. Source
  • Zone RM (f12.0; u4; d0.8) (x252) (Residential Multiple Dwelling). Chapter 10, section 10.80 of the by-law. Source

Around this lot

Minor variances approved
89%25 of 28 decisions
Garden suite permits
6
Laneway suite permits
0
Multiplex permits
6
Development applications
1

Within 300 m, last 10 years. 12 suite and multiplex permits: more than at 78% of Toronto houses (median 3). 28 variance decisions: more than at 60% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To construct a new three-storey detached dwelling (houseplex) with a front ground floor landing with stairs, a rear basement walkout and a rear exterior staircase with three rear platform landings (leading to all storeys). Also, to construct a new two-storey detached ancillary building containing one garden suite. There will be a total of seven residential dwelling units on this lot (six units within the main building, and one unit occupying the ancillary building).

    39 KIRKNEWTON RD · Sep 2, 2026 · 466 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling (houseplex) with front entrance stairs, north side bay windows, a rear basement window well, rear exterior stairs, and a rear third storey terrace with a canopy. Also, to construct a new two-storey detached ancillary building (containing one garden suite) in the rear yard, with front entrance stairs. There will be a total of seven residential dwelling units on this lot (six units within the main building, and one unit within the ancillary building).

    41 BRANSTONE RD · Aug 19, 2026 · 258 m away
  • Minor varianceApproved

    To construct a new three-storey detached building (houseplex) with front stairs to access the ground level, and a rear exterior staircase providing access from the basement level to the third storey. Also, to construct a new rear two-storey detached ancillary building (containing one garden suite). There will be a total of seven residential dwelling units on this lot (six units within the main building, and one unit within the ancillary building).

    557 NAIRN AVE · Aug 19, 2026 · 238 m away
  • Minor varianceApproved

    To construct a new four-storey detached dwelling (houseplex) with front and rear basement walkouts, front and rear porches with stairs, front and rear balconies on the second and third storeys, and front and rear rooftop terraces on the fourth storey. Also, to construct a new rear two-storey detached ancillary building containing one garden suite with two interior bicycle parking spaces. There will be a total of seven residential dwelling units on this lot (six units within the main dwelling, and one unit within the ancillary building), as well as two parking spaces in the rear yard.

    627 MCROBERTS AVE · Aug 12, 2026 · 344 m away
  • Minor varianceApproved

    To construct a new three-storey detached dwelling (multiplex) with front stairs to access the ground level, and a rear exterior staircase providing access from the basement level to the third storey. Also, to construct a new rear two-storey detached ancillary building containing one garden suite (abutting Harlow Avenue). There will be a total of seven residential dwelling units on this lot (six units within the main dwelling, and one unit within the ancillary building).

    74 KIRKNEWTON RD · Jul 22, 2026 · 422 m away

Latest activity nearby

  • Zoning review

    Application On Hold

    569 MCROBERTS AVE · Nov 25, 2026 · 275 m away
  • Zoning review

    Not Started

    569 MCROBERTS AVE · Nov 18, 2026 · 275 m away
  • Building permitmultiplex, secondary suite

    REVISION 01: New bedroom and relocation of bathroom.Proposal for triplex conversion and interior alterations. - UPDATED TO DUPLEX IN REVISION 1

    61 BRANSTONE RD · Nov 9, 2026 · 262 m away
  • Zoning review

    Cancelled

    569 MCROBERTS AVE · Nov 3, 2026 · 275 m away
  • Building permit

    Retaining wall construction.

    485 NAIRN AVE · Oct 8, 2026 · 183 m away
  • Building permitdemolition

    Proposal to demolish the existing dwelling

    41 BRANSTONE RD · Oct 7, 2026 · 258 m away
  • Building permitmultiplex, new building, new house

    Proposal to construct a 3-storey, 6 unit multiplex with front and rear basement walkouts and a front porch

    41 BRANSTONE RD · Oct 7, 2026 · 258 m away
  • Building permit

    Proposed retaining wall construction and rebuild stairs

    483 NAIRN AVE · Oct 7, 2026 · 189 m away
  • Building permitgarden suite

    Proposed garden suite.

    41 BRANSTONE RD · Oct 6, 2026 · 258 m away
  • Building permitgarden suite

    Proposed garden suite.

    41 BRANSTONE RD · Oct 6, 2026 · 258 m away

Neighbourhood: Caledonia-Fairbank

About the area around the lot, not the lot itself.

Nearest station
Fairbank Station12 min walk
Nearest TTC stop
Eglinton Ave West at Harvie Ave4 min walk
Nearest cycling route
Beltline TrlMulti-Use Trail - Entrance, 12 min walk
Nearest traffic count
335 vehicles in 8 hNairn Ave / Kitchener Ave, 250 m away, Aug 7, 2003
Serious collisions within 500 m
32021–2026, killed or seriously injured: 0 fatal, 1 with pedestrians, 2 with cyclists
Parks
Charles Caccia Park6 min walk
Bert Robinson Park8 min walk
Eglinton - Gilbert Parkette9 min walk

Schools within 1 km

  • FAIRBANK MEMORIAL COMMUNITY SCHOOL English Public 1 min walk
  • BALANCED EDUCATION NETWORK B.E.N. SCHOOL Private 8 min walk
  • ST JOHN BOSCO CATHOLIC ELEMENTARY SCHOOL English Separate 10 min walk
  • LYCEE FRANCAIS DE TORONTO Private 11 min walk
  • FAIRBANK PUBLIC SCHOOL English Public 11 min walk
  • F H MILLER JR PUBLIC SCHOOL English Public 14 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureCaledonia-FairbankMedian neighbourhood
Median household income (2020)$87,000$84,500
Households that own their home63%54%
Population (2021)10,01516,813
Homes built in 1960 or before53%29%
Homes needing major repairs8%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleCaledonia-FairbankCity median
Assault552.3636.3
Robbery74.969.5
Shootings9.410.5
Auto theft280.8192.6
Theft over $5,00018.746.1
Break and enter121.7172.8
Theft from vehicles159.1188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.