HousePrecheckCheck an address

550 Hopewell AveToronto · zoning, lot size and permit records

54.3 × 37.7 m1,756 m²on Hopewell Ave

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.2 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • 5 development applications open within 300 m, up to 27 storeysNew buildings may go up around here in the next years. More change nearby than at 93% of Toronto houses.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N20 m
54.3 m frontage37.7 m deep

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. A079/04NY (This is an application under Section 45 of the Planning Act, for variance from the prov..., 2004).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)
  • 5 development applications open within 300 m

    Good to know

    5 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 27 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

8 records on file: more than at 98% of Toronto houses (median 0).

  • Building permit13 279565Closed

    Installation of one backflow prevention device and two thermal expansion tanks

    Jan 9, 2014 · 550 HOPEWELL AVE
  • Building permit04 194544Closed

    HVAC - Construct a third floor above an existing building plus interior alterations to convert from industrial to residential lofts.

    Jun 21, 2006 · 550 HOPEWELL AVE
  • Building permit04 188680Closed

    Demolition existing interior parttial demoliton of exterior walls as per attached architecural drawings. and Reinforcing existing steel structure as per attached structural drawings.

    Dec 14, 2004 · 550 HOPEWELL AVE
  • Building permit04 194540Cancelled

    Construct a third floor above an existing building plus interior alterations to convert from industrial to residential lofts.

    Nov 23, 2004 · 550 HOPEWELL AVE
  • Minor varianceA079/04NYApproved

    This is an application under Section 45 of the Planning Act, for variance from the provisions of York Zoning By-laws 1-83 and 3623-97, as amended, to permit the conversion of an existing two-storey non-residential building, to a three-storey Apartment House containing 29 residential dwelling units.

    May 6, 2004 · 550 HOPEWELL AVE
  • Building permit04 120621Closed

    Interior alteration for an temporary sales office.

    Apr 20, 2004 · 550 HOPEWELL AVE
  • Zoning review04 121698 PSPClosed
    Apr 1, 2004 · 550 HOPEWELL AVE
  • Zoning review03 164125 ZPRClosed
    Aug 7, 2003 · 550 HOPEWELL AVE

Check before you build

  • Zoning not in By-law 569-2013

    Needs a closer look

    This lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.

    Zoning By-law 569-2013

Lot facts

Area
1,756 m²
Frontage
54.3 m
Depth
37.7 m
Street
Hopewell Ave
Corner lot
No
Public lane
None
Max height
—
Max lot coverage
—
  • 7 City trees in front of this lot. The City's street tree inventory lists 7 trees at this address: honey locust (14 cm), honey locust (13 cm), honey locust (13 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
92%12 of 13 decisions
Garden suite permits
3
Laneway suite permits
0
Multiplex permits
4
Development applications
8

Within 300 m, last 10 years. 7 suite and multiplex permits: more than at 67% of Toronto houses (median 3). 13 variance decisions: no more than at most Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceApproved

    To permit the construction of a new Garden Suite, in the rear yard of the Subject Property.

    1126 ROSELAWN AVE · Oct 15, 2026 · 183 m away
  • Minor varianceApproved

    To construct a new dwelling (fourplex) on the subject property, in conjunction with the construction of a Garden Suite, in the rear yard. Please note, this application was previously deferred Thursday, July 9, 2026.

    64 SCHELL AVE · Sep 17, 2026 · 409 m away
  • Minor varianceApproved

    To legalize and maintain the existing detached garage as re-constructed.

    405 WHITMORE AVE · Sep 3, 2026 · 451 m away
  • Minor varianceApproved

    To permit an 11-storey mixed use building. The property was the subject of a previous Minor Variance application (File No. A0243/21NY) to permit a 9-storey mixed use building, which was approved on condition.

    1886 EGLINTON AVE W · Aug 20, 2026 · 413 m away
  • Minor varianceApproved

    To construct a new 3 storey detached fourplex, with a Garden Suite at the rear of the property.

    222 BELGRAVIA AVE · Jan 8, 2026 · 181 m away

Latest activity nearby

  • Building permitmultiplex

    To construct a rear three-storey addition, a rear deck, a rear basement walkout, and interior alterations throughout, to convert the dwelling into a three-unit houseplex.

    466 WHITMORE AVE · Nov 26, 2026 · 207 m away
  • Building permit

    Proposal to construct a second floor addition and interior alterations on the main floor of existing single family dwelling

    230 BELGRAVIA AVE · Nov 24, 2026 · 176 m away
  • Zoning review

    Closed

    2401 DUFFERIN ST · Nov 9, 2026 · 278 m away
  • Building permit

    install a back water valve

    215 BELGRAVIA AVE · Oct 21, 2026 · 232 m away
  • Minor varianceApproved

    To permit the construction of a new Garden Suite, in the rear yard of the Subject Property.

    1126 ROSELAWN AVE · Oct 15, 2026 · 183 m away
  • Zoning review

    Closed

    230 BELGRAVIA AVE · Sep 21, 2026 · 176 m away
  • Building permit

    PROPOSED GARAGE

    455 WHITMORE AVE · Sep 11, 2026 · 281 m away
  • Building permit

    1 wall sign.***BLOOMSBURY FINE CABINETRY***

    1142 CASTLEFIELD AVE · Sep 3, 2026 · 293 m away
  • Building permit

    1 wall sign**NORTHERN WIDE PLANK**

    1142 CASTLEFIELD AVE · Aug 18, 2026 · 293 m away
  • Building permitgarden suite

    Garden suite

    1126 ROSELAWN AVE · Jul 28, 2026 · 183 m away

Neighbourhood: Briar Hill-Belgravia

About the area around the lot, not the lot itself.

Nearest station
Fairbank Station6 min walk
Nearest TTC stop
Dufferin St at Bowie Ave2 min walk
Nearest cycling route
Beltline TrlMulti-Use Trail, 1 min walk
Nearest traffic count
1,273 vehicles in 8 hHopewell Ave / Jimmy Wisdom Way / Walter Saunders Memorial Park Trl, 140 m away, Nov 1, 2005
Serious collisions within 500 m
92021–2026, killed or seriously injured: 3 fatal, 6 with pedestrians, 0 with cyclists
Parks
Kay Gardner Beltline Park1 min walk
Walter Saunders Memorial Park1 min walk
J.T. Watson Parkette4 min walk

Schools within 1 km

  • ST THOMAS AQUINAS CATHOLIC ELEMENTARY SCHOOL English Separate 8 min walk
  • FAIRBANK PUBLIC SCHOOL English Public 9 min walk
  • LYCEE FRANCAIS DE TORONTO Private 10 min walk
  • FAIRBANK MEMORIAL COMMUNITY SCHOOL English Public 15 min walk
  • D'ARCY MCGEE CATHOLIC ELEMENTARY SCHOOL English Separate 16 min walk
  • STS COSMAS AND DAMIAN CATHOLIC ELEMENTARY SCHOOL English Separate 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureBriar Hill-BelgraviaMedian neighbourhood
Median household income (2020)$81,000$84,500
Households that own their home48%54%
Population (2021)14,57516,813
Homes built in 1960 or before37%29%
Homes needing major repairs9%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleBriar Hill-BelgraviaCity median
Assault684.5636.3
Robbery73.369.5
Shootings12.210.5
Auto theft262.8192.6
Theft over $5,00048.946.1
Break and enter207.8172.8
Theft from vehicles146.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 29, 2026, published Nov 27, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 29, 2026, published Nov 27, 2026
  • City-owned land: loaded Nov 29, 2026, published Nov 23, 2026
  • Committee of Adjustment open applications: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions: loaded Nov 29, 2026, published Nov 28, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 29, 2026, published Nov 28, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 29, 2026, published Nov 29, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 29, 2026, published Nov 24, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Nov 29, 2026, published Nov 23, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 29, 2026, published Nov 28, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits: loaded Nov 29, 2026, published Nov 28, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 29, 2026, published Nov 28, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 29, 2026, published Nov 28, 2026
  • Multi-tenant house licences: loaded Nov 29, 2026, published Nov 28, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Nov 29, 2026, published Nov 23, 2026
  • Short-term rental registrations: loaded Nov 29, 2026, published Nov 28, 2026
  • Traffic counts at intersections: loaded Nov 29, 2026, published Nov 28, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Nov 29, 2026, published Nov 23, 2026
  • Lot coverage overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Height overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Parking zone overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Policy area overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Priority retail streets: loaded Nov 29, 2026, published Nov 23, 2026
  • Rooming house overlay: loaded Nov 29, 2026, published Nov 23, 2026
  • Zoning setbacks: loaded Nov 29, 2026, published Nov 23, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.