HousePrecheckCheck an address

55 Stewart StToronto · zoning, lot size and permit records

Commercial residential employment · CRE (x1)≈ 12.1 × 25.6 m263 m²on Stewart St

Not a single house

A condominium parcel

The City's property boundaries show this parcel as a condominium: the homes on it are units of a condominium corporation, which owns the land and common elements. Build options for a house do not apply; the corporation's status certificate is the document to read before an offer.

Looking at a house nearby? What this means for you

  • A condominium on 0.0 haIts owners share the land and decide together on changes; expect more cars and visitors than a house.
  • Permits or applications open on this parcelStill open in the City's records: 19 189442 (Proposal fro localized concrete repairs on levels P1 and P2 of the existing Apartment B..., 2019, status Permit Issued); 13 214475 (HVAC - Proposal for interior alteration to lobby of existing apartment building. (160m2), 2013, status Inspection). Larger work can mean noise and trucks next door; read what each one is for.
  • 18 development applications open within 300 m, up to 40 storeysNew buildings may go up around here in the next years. More change nearby than at 100% of Toronto houses.
  • Major Transit Station Area: King-BathurstThe City plans more homes around the station: good for transit, and more building over time.

Want to check this condo before you buy?

We are building checks for condominiums. Leave your email and we will tell you when it is ready.

N10 m
≈ 12.1 m frontage≈ 25.6 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • 2 building permits open, the oldest since 2013

    Needs a closer look

    Still open in the City's records: 19 189442 (Proposal fro localized concrete repairs on levels P1 and P2 of the existing Apartment B..., 2019, status Permit Issued); 13 214475 (HVAC - Proposal for interior alteration to lobby of existing apartment building. (160m2), 2013, status Inspection).

    What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.

    How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
  • 18 development applications open within 300 m

    Good to know

    18 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 40 storeys. They are listed under Around this lot.

    What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.

    How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details

    City of Toronto, Development Applications

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • Zoning review25 258617 LTOClosed
    Nov 26, 2025 · 55 STEWART ST
  • Zoning review24 154394 LTOClosed
    May 27, 2024 · 55 STEWART ST
  • Zoning review24 133449 LPRClosed
    Apr 7, 2024 · 55 STEWART ST
  • Building permit22 195813Closed

    Proposal for exterior repairs for waterproofing replacement & associated concrete repairs to (215) existing balcony slabs of a condominium building. Additional work for localized guardrail / divider panel repairs.

    Nov 3, 2022 · 55 STEWART ST
  • Building permit19 189442Permit Issued

    Proposal fro localized concrete repairs on levels P1 and P2 of the existing Apartment Building.

    Aug 21, 2019 · 55 STEWART ST
  • Building permit16 163911Closed

    BASIC INTERIOR ALTERATION TO A RESIDENTIAL SUITE

    Jun 15, 2016 · 55 STEWART ST
  • Building permit15 230039Closed

    MINOR INTERIOR RENOVATIONS TO MERGE TWO UNITS INTERNALLY: DECOMMISION EXISTING WASHER/DRYER + DECOMMISION KITCHEN & CONVERSION TO DOUBLE SHOWER (SAME LOCATION, REUSE EXISTING WATER/DRAIN) + NEW DOUBLE VANITY ON EXISTING PLUMBING WALL + MINOR INTERIOR WALL REVISIONS, NO NEW GFA OR CHANGES OUTSIDE UNIT(S)

    Oct 14, 2015 · 55 STEWART ST
  • Zoning review15 178830 LTOClosed
    Jun 23, 2015 · 55 STEWART ST
Show 2 older records
  • Building permit13 214475Inspection

    HVAC - Proposal for interior alteration to lobby of existing apartment building. (160m2)

    Aug 27, 2013 · 55 STEWART ST
  • Building permit12 177939Closed

    Proposal to install 2 manual pull stations on the 4th floor of existing multi use building.

    Jun 22, 2012 · 55 STEWART ST

Check before you build

  • Site-specific exception 900.12.10(1)

    Needs a closer look

    2 older by-laws that still prevail apply to this lot. They can override the standard rules on this page.

    Zoning By-law 569-2013, Chapter 900
Exception 900.12.10(1)Applies

These parts of the exception apply to this lot's address.

  1. Older by-law A

    Section 12(2) 260 of former City of Toronto By-law 438-86

  2. Older by-law B

    Section 12(2) 270 of former City of Toronto By-law 438-86.

By-law 569-2013, Chapter 900

Lot facts

Area
263 m²
Frontage
12.1 mestimated, irregular lot
Depth
25.6 mestimated, irregular lot
Street
Stewart St
Corner lot
No
Public lane
None
Max height
23 m
Max lot coverage
—
  • Major Transit Station Area: King-Bathurst. The lot is inside the King-Bathurst Major Transit Station Area approved by the Province (Site and Area Specific Policy 761). Source
  • King-Spadina Secondary Plan. A Secondary Plan sets more detailed land use, height and density policies for this area. Source
  • Downtown building setback overlay. Towers over 36 m here need extra setbacks above 24 m and 25 m between towers. Houses and other low buildings are not affected. Source
  • Zone CRE (x1) (Commercial Residential Employment). Chapter 50, section 50.10 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: pear chanticleer (12 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
90%18 of 20 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
53

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 20 variance decisions: more than at 51% of Toronto houses (median 19).

Recent variance decisions in the same zone

  • Minor varianceRefused

    To alter the development standards for the mixed-use building (stepping up to 14-storeys (45 m), as approved under Site Specific Zoning By-law 1247-2022 (OLT), by increasing the building height, the number of storeys (stepping up to 17-storeys (54.5 m), the total gross floor area (for residential and non-residential uses), and the total number of residential dwelling units (including a reduction in the proportion of three-bedroom units). Also, to reduce the minimum required outdoor amenity space, the number of required residential and visitor parking spaces, the number of parking spaces equipped with an energized outlet, the number of oversized bicycle parking spaces, and the minimum width of two short-term bicycle parking spaces. The altered mixed-use building will contain commercial uses on the first and second storeys, indoor and outdoor amenity spaces on the second storey, and a total of 162 residential dwelling units.

    485 WELLINGTON ST W · Oct 7, 2026 · 244 m away
  • Minor varianceApproved

    To construct a one-storey enclosed free-standing hospitality kiosk that will be fully serviced and used as a servery for an existing outdoor patio, on this site.

    497 RICHMOND ST W · Aug 20, 2025 · 438 m away
  • Minor varianceApproved

    To alter the existing 10-storey condominium building by installing a rooftop patio (including a pergola, and swim spa with privacy fencing).

    533 RICHMOND ST W · Jul 30, 2025 · 406 m away
  • Minor varianceApproved

    To alter the development standards for the 15-storey (50 m) mixed-use building (as approved under Site Specific Zoning By-Law 1047-2022), by increasing the overall height, number of dwelling units, and residential gross floor area, and to reduce loading and bicycle parking spaces.

    462 WELLINGTON ST W · Mar 26, 2025 · 287 m away
  • Minor varianceApproved

    To permit the undersized loading spaces (Type C) in the parking level of a 15 storey mixed-use building (currently under construction).

    530 FRONT ST W · Jun 12, 2024 · 272 m away

Latest activity nearby

  • Minor variancePending

    To permit a self-storage facility (Storage Warehouse, Class A) within the existing 10-storey commercial building by converting portions of the second floor, and the full fourth and sixth floors into a self-storage facility, with a co-working space occupying the remaining portion of the second floor. The remaining portions of the building will continue to be used for commercial and office uses. There will be a total of 125 parking spaces provided (89 within the underground parking garage and 36 in the rear surface level lot).

    720 KING ST W · Dec 9, 2026 · 248 m away
  • Minor variancePending

    To alter the development standards for the 9-storey non-residential (office) building (as approved under Site Specific Zoning By-law 718-2025 (OLT)), by increasing the non-residential gross floor area, and increasing the number of storeys to 11-storeys (with a building height of 43.39 m, inclusive of the mechanical penthouse). Also, this building will contain hotel and retail uses, instead of office use. A related Site Plan Control application (File Number 22 242134 STE 10 SA) has received a Notice of Approval Conditions. This site has heritage designation.

    578 KING ST W · Nov 25, 2026 · 236 m away
  • Building permit

    Rev 01 - Changing washroom/shower layout and reducing it down to 2 showersCommercial renovation to operate pilates fitness classes in a studio, and enhancing the plumbing to provide 3 washrooms and 3 showers.

    517 WELLINGTON ST W · Nov 23, 2026 · 187 m away
  • Building permit

    Interior alterations - Unit 505

    720 KING ST W · Nov 20, 2026 · 248 m away
  • Building permit

    Proposal to demolish existing partial wall and construct a tenant demising wall at Level 1, Area C north lobby.

    530 FRONT ST W · Nov 18, 2026 · 272 m away
  • Building permit

    Proposal for alternative solution for the turnstiles for access control to meet the intent of the OBC for egress and barrier-free accessibility requirements

    530 FRONT ST W · Oct 30, 2026 · 272 m away
  • Building permit

    Proposal for interior alterations to office spaces on Level 01, 07 and 08.

    530 FRONT ST W · Oct 29, 2026 · 272 m away
  • Building permit

    1 Wall Sign****ORCHARD KITCHEN****

    700 KING ST W · Oct 28, 2026 · 188 m away
  • Building permit

    Installation of 2 maglocks on amenity floors

    701 KING ST W · Oct 26, 2026 · 207 m away
  • Zoning review

    Closed

    689 KING ST W · Oct 23, 2026 · 182 m away

Neighbourhood: Wellington Place

About the area around the lot, not the lot itself.

Nearest station
St. Andrew Station21 min walk
Nearest TTC stop
King St West at Bathurst St East Side2 min walk
Nearest cycling route
Wellington St WBi-Directional Cycle Track, 1 min walk
Nearest traffic count
13,208 vehicles in 14 hBathurst St / Stewart St, 90 m away, Jun 24, 2025
Serious collisions within 500 m
102021–2026, killed or seriously injured: 0 fatal, 6 with pedestrians, 3 with cyclists
Parks
Victoria Memorial Square Park1 min walk
Adelaide Place Parkette3 min walk
Draper Park5 min walk

Schools within 1 km

  • ALPHA ALTERNATIVE & OASIS ALTERNATIVE English Public 6 min walk
  • ST MARY CATHOLIC ELEMENTARY SCHOOL English Separate 6 min walk
  • NIAGARA STREET JR PUBLIC SCHOOL English Public 9 min walk
  • BISHOP MACDONELL CATHOLIC ELEMENTARY English Separate 12 min walk
  • JEAN LUMB PUBLIC SCHOOL English Public 12 min walk
  • DISCOVERING MINDS MONTESSORI SCHOOL Private 13 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureWellington PlaceMedian neighbourhood
Median household income (2020)$90,000$84,500
Households that own their home38%54%
Population (2021)25,57016,813
Homes built in 1960 or before2%29%
Homes needing major repairs1%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleWellington PlaceCity median
Assault1169.6636.3
Robbery8269.5
Homicide5.35.3
Shootings10.610.5
Auto theft97.9192.6
Theft over $5,00087.346.1
Break and enter293.7172.8
Theft from vehicles211.7188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 28, 2026, published Nov 27, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions: loaded Nov 28, 2026, published Nov 27, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 28, 2026, published Nov 28, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 28, 2026, published Nov 27, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits: loaded Nov 28, 2026, published Nov 27, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 28, 2026, published Nov 27, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 28, 2026, published Nov 27, 2026
  • Multi-tenant house licences: loaded Nov 28, 2026, published Nov 27, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 28, 2026, published Nov 27, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.