Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
4 by-law investigations closed in the last two years
Good to knowClosed files (Adequate Heat, Property Standards): 26 171806 000 00 IR (Adequate Heat, 2026); 26 171805 000 00 IR (Property Standards, 2026); 25 257883 PRS 00 IR (Property Standards, 2025); and 1 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations3 development applications open within 300 m
Good to know3 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 30 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications1 short-term rental registrations here
Good to know1 active short-term rental registration at this address (Apartment).
What it means. Short-term rentals are allowed only in the operator's own principal residence, so a buyer cannot count on the same rental income. In a condo, check the building's rules too.
How to confirm. The City's short-term rental page explains registration and the principal residence rule. Details
City of Toronto, Short-term Rental RegistrationsRental building evaluation: 96 out of 100
Good to knowThe City's RentSafeTO program evaluated this rental building in 2026 (25 storeys, 264 units, built 2020).
What it means. The score covers common areas, building systems and records. Read the evaluation details for the items that scored low.
How to confirm. The City's RentSafeTO page has the evaluation results and any open orders for the building. Details
City of Toronto, RentSafeTO Apartment Building Evaluations
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
7 records on file: more than at 97% of Toronto houses (median 0).
- By-law investigation26 171806 000 00 IRClosed
Adequate Heat
Jun 1, 2026 · 55 QUEBEC AVE - By-law investigation26 171805 000 00 IRClosed
Property Standards
Jun 1, 2026 · 55 QUEBEC AVE - By-law investigation25 257883 PRS 00 IRClosed
Property Standards
Nov 24, 2025 · 55 QUEBEC AVE - By-law investigation25 133030 PRS 00 IRClosed
Property Standards
Mar 21, 2025 · 55 QUEBEC AVE - By-law investigation25 119029 SNI 00 IRClosed
Snow and Ice
Feb 19, 2025 · 55 QUEBEC AVE - Development application16 115443 WET 13 SAClosed
Proposed development of two 25-storey (rental) apartment buildings containing 528 units in conjunction with two existing 20-storey (rental) apartment buildings. Two existing blocks of townhouses are to be demolished
Feb 10, 2016 · 51 QUEBEC AVE · City file - Development application13 101816 WET 13 OZClosed
This address covers 51 - 77 Quebec Avenue and 40 - 66 High Park Avenue. Propose to remove (2) blocks of townhouses and construct (2) new residential use only apartment buildingsof Bldg A and B and a (2) storey amenity block building. (2) existing residential apartment towers to remain.
Jan 7, 2013 · 51 QUEBEC AVE
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 2,434 m²
- Frontage
- 66.1 mestimated, irregular lot
- Depth
- 55.9 mestimated, irregular lot
- Street
- Quebec Ave
- Corner lot
- No
- Public lane
- None
- House footprint
- 578 m²
- Back yard
- 23.5 mhouse to rear lot line
- Side yards
- 1.8 m and 34 mhouse to side lot lines
- Buildings on the lot
- 9house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
Around this lot
- Minor variances approved
- 100%14 of 14 decisions
- Garden suite permits
- 2
- Laneway suite permits
- 0
- Multiplex permits
- 3
- Development applications
- 7
Within 300 m, last 10 years. 5 suite and multiplex permits: more than at 59% of Toronto houses (median 3). 14 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 107-2015(OMB)), for the existing 11-storey mixed-use building, by permitting clinic and office uses (physician(s) and healthcare practitioner(s)), to be located on a portion of the first level. There is a total of 104 residential dwelling units on this lot.
1990 BLOOR ST W · Aug 12, 2026 · 234 m away - Minor varianceRefused
To construct a new four-storey detached dwelling (houseplex with the basement level considered the first storey) with an integral garage, a front porch with stairs, front and rear first storey walkouts, a rear second storey deck with stairs, and front and rear fourth storey rooftop terraces (on the roof of the third storey). There will be a total of two dwelling units on this lot.
61 PINE CREST RD · Aug 12, 2026 · 358 m away - Minor varianceRefused
To construct a new four-storey detached dwelling (houseplex with the basement level considered the first storey) with an integral garage, a front porch with stairs, front and rear first storey walkouts, a rear second storey deck with stairs, and front and rear fourth storey rooftop terraces (on the roof of the third storey). There will be a total of two dwelling units on this lot.
61 PINE CREST RD · Aug 12, 2026 · 358 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey detached dwelling by constructing a front second and third storey addition, and a rear third storey addition. Also, to construct a rear covered basement walkout extension, and to enlarge the rear ground floor covered deck with stairs, currently under construction with a building permit (No. 26 100682 BLD 00 SR), at the southwest corner of the dwelling.
140 QUEBEC AVE · Aug 5, 2026 · 261 m away - Minor varianceApproved
To alter the existing three-storey detached dwelling by constructing a rear third storey dormer addition with a rooftop patio (above the existing sunroom addition).
11 OAKMOUNT RD · Apr 29, 2026 · 390 m away
Latest activity nearby
- Building permit
B1/P1 Level Sanitary Drainage Headers/Stacks Offsets Replacement. The scope of work includes piping replacement within the B1 level as well as a section of pipe within the underground garage.
50 QUEBEC AVE · Oct 23, 2026 · 69 m away - Building permit
Plumbing - Renovation of the existing condo unit. Reconfiguring kitchen and laundry machine; renovating thebathrooms; transforming a tub into a shower.
50 QUEBEC AVE · Oct 13, 2026 · 69 m away - Zoning review
Notice Sent
1990 BLOOR ST W · Oct 2, 2026 · 234 m away - Minor varianceApproved
To alter the development standards (as approved under Site Specific Zoning By-law 107-2015(OMB)), for the existing 11-storey mixed-use building, by permitting clinic and office uses (physician(s) and healthcare practitioner(s)), to be located on a portion of the first level. There is a total of 104 residential dwelling units on this lot.
1990 BLOOR ST W · Aug 12, 2026 · 234 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey detached dwelling by constructing a front second and third storey addition, and a rear third storey addition. Also, to construct a rear covered basement walkout extension, and to enlarge the rear ground floor covered deck with stairs, currently under construction with a building permit (No. 26 100682 BLD 00 SR), at the southwest corner of the dwelling.
140 QUEBEC AVE · Aug 5, 2026 · 261 m away - Building permit
Proposed window replacements to an apartment building
66 PACIFIC AVE · Aug 5, 2026 · 202 m away - Building permit
Window Replacements
65 HIGH PARK AVE · Aug 4, 2026 · 214 m away - Building permit
Revision 02 - revised roof plan to reflect skylightRevision 01 - remove 2 skylights on the roof, remove interior partiton wall, between living arear and enlarge windows, remove side doorProposal to convert the existing detached garage to a garden suite
62 GOTHIC AVE · Jun 25, 2026 · 210 m away - Building permit
Proposal to replace existing fire pump.
100 HIGH PARK AVE · Jun 22, 2026 · 238 m away - Building permit
Interior alterations within the basement associated with the replacement of the fire pump.
100 HIGH PARK AVE · Jun 22, 2026 · 238 m away
Neighbourhood: High Park North
About the area around the lot, not the lot itself.
- Nearest station
- High Park Station3 min walk
- Nearest TTC stop
- High Park Station - Eastbound Platform1 min walk
- Nearest cycling route
- High Park AveSharrows, 2 min walk
- Nearest traffic count
- 8,017 vehicles in 8 hBloor St W / Quebec Ave, 140 m away, Feb 2, 2022
- Serious collisions within 500 m
- 12021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 1 with cyclists
- Parks
- Bennett Park1 min walk
- High Park2 min walk
- Parkview Gardens Parkette3 min walk
Schools within 1 km
- KEELE ST JR SCHOOL English Public 9 min walk
- THE STUDENT SCHOOL English Public 10 min walk
- WESTERN TECHNICAL COMMERCIAL SCHOOL English Public 11 min walk
- URSULA FRANKLIN ACADEMY English Public 11 min walk
- HUMBERSIDE COLLEGIATE INSTITUTE English Public 11 min walk
- HUMBERSIDE MONTESSORI SCHOOL Private 12 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | High Park North | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $83,000 | $84,500 |
| Households that own their home | 33% | 54% |
| Population (2021) | 21,855 | 16,813 |
| Homes built in 1960 or before | 38% | 29% |
| Homes needing major repairs | 8% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | High Park North | City median |
|---|---|---|
| Assault | 677.9 | 636.3 |
| Robbery | 43.1 | 69.5 |
| Homicide | 3.9 | 5.3 |
| Shootings | 3.9 | 10.5 |
| Auto theft | 74.5 | 192.6 |
| Theft over $5,000 | 27.4 | 46.1 |
| Break and enter | 133.2 | 172.8 |
| Theft from vehicles | 152.8 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.