HousePrecheckCheck an address

55 Progress AveToronto · zoning, lot size and permit records

Employment · E 0.7≈ 102.8 × 235.9 m13,703 m²on Progress Ave

Not a home

An employment area

The zoning by-law sets this parcel aside for employment: offices, workshops and industry. It is not a home for sale, so the house checks and the pre-offer report do not apply.

Looking at a house nearby? What this means for you

  • Offices, workshops or industryTrucks and noise in working hours, quiet at night; check what is made or stored there.
  • No development applications within 300 m in 10 yearsA quiet stretch for new building, by the City's records.
  • 2 open orders or by-law investigations at this buildingThe City is following up on complaints here, such as upkeep, heat or noise. Not resolved in the City's records: 26 202338 PRS 00 IV (Order Issued Property Standards: The ditch or swale is not being maintained free from d..., 2026, status Order Issued); 26 202062 PRS 00 IR (Property Standards, 2026, status Order Issued).
N50 m
≈ 102.8 m frontage≈ 235.9 m deepirregular lot, estimated

Before you offer

From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.

  • TRCA regulated area (10% of lot)

    Needs a closer look

    Part of the lot is near a valley, floodplain, shoreline or wetland. Work there needs a TRCA permit and may be restricted.

    What it means. Additions, pools and new buildings in the regulated part need a TRCA permit and may be refused. Ask your insurer about flood coverage.

    How to confirm. A TRCA property inquiry letter says which policies apply ($385, at least two weeks). Details

    Ontario Regulation 41/24, TRCA Regulation Limit
  • 2 open orders or by-law investigations

    Needs a closer look

    Not resolved in the City's records: 26 202338 PRS 00 IV (Order Issued Property Standards: The ditch or swale is not being maintained free from d..., 2026, status Order Issued); 26 202062 PRS 00 IR (Property Standards, 2026, status Order Issued).

    What it means. An order is attached to the property, not to the seller. If it is not resolved before closing, the work, permits or fines it calls for can fall to you.

    How to confirm. Ask the seller how each order will be resolved and get it in writing. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details

    City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigations
  • Natural Heritage System (7% of lot)

    Good to know

    Part of the lot is in the Natural Heritage System shown on Official Plan Map 9.

    What it means. New buildings or additions in that part need a natural heritage impact study.

    How to confirm. City Planning confirms the policies that apply. Details

    City of Toronto Official Plan, Map 9
  • 1 Committee of Adjustment file on this lot

    Good to know

    1 approved. B064/03SC (To sever one lot into two lots, 2004).

    What it means. Approved variances and consents stay with the property, including any conditions in the decision. They allow what was approved, not more.

    How to confirm. Decisions are in the Application Information Centre; older files are available from the Committee of Adjustment office. Details

    City of Toronto, Committee of Adjustment applications (2001 onwards)

Not in these records

  • Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
  • Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.

History of this lot

10 records on file: more than at 99% of Toronto houses (median 0).

  • By-law investigation26 202338 PRS 00 IVOrder Issued

    Order Issued Property Standards: The ditch or swale is not being maintained free from defect and/or obstructions. Namely, the ditch or swale was obstructed and not draining properly.

    Jul 14, 2026 · 55 PROGRESS AVE
  • By-law investigation26 202062 PRS 00 IROrder Issued

    Property Standards

    Jul 14, 2026 · 55 PROGRESS AVE
  • By-law investigation26 192042 WST 00 IVNotice Issued

    Notice Issued Waste: Owner of land failed to clean and clear refuse that has been thrown, placed, dumped or deposited, including but not limited to standing water.

    Jun 26, 2026 · 55 PROGRESS AVE
  • By-law investigation26 191747 WST 00 IRNotice Issued

    Waste

    Jun 26, 2026 · 55 PROGRESS AVE
  • Building permit10 244286Closed

    INSTALL 1 BACKFLOW DEVICE

    Sep 3, 2010 · 55 PROGRESS AVE
  • Consent (lot split)B064/03SCApproved

    To sever one lot into two lots

    Mar 10, 2004 · 55 PROGRESS AVE
  • Zoning review04 110572 ZPRClosed
    Feb 19, 2004 · 55 PROGRESS AVE
  • Zoning review04 110569 ZPRClosed
    Feb 19, 2004 · 55 PROGRESS AVE
Show 2 older records
  • Zoning review04 106041 PLOClosed
    Jan 30, 2004 · 55 PROGRESS AVE
  • Building permit02 172625Closed

    SITE SERVICING FOR SELF STORAGE UNITS

    Sep 30, 2003 · 55 PROGRESS AVE

Lot facts

Area
13,703 m²
Frontage
102.8 mestimated, irregular lot
Depth
235.9 mestimated, irregular lot
Street
Progress Ave
Corner lot
No
Public lane
None
House footprint
6,762 m²roof up to 8.8 m
Back yard
94.1 mhouse to rear lot line
Side yards
6.2 m and 29.8 mhouse to side lot lines
Buildings on the lot
1house, garage, sheds
Max height
—
Max lot coverage
—

House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.

  • Zone E 0.7 (Employment Industrial). Chapter 60, section 60.20 of the by-law. Source
  • 1 City tree in front of this lot. The City's street tree inventory lists 1 tree at this address: elm, american (7 cm). Diameter is the trunk at breast height. Source

Around this lot

Minor variances approved
100%1 of 1 decisions
Garden suite permits
0
Laneway suite permits
0
Multiplex permits
0
Development applications
0

Within 300 m, last 10 years. 0 suite and multiplex permits: no more than at most Toronto houses (median 3). 1 variance decisions: no more than at most Toronto houses (median 19).

Latest activity nearby

  • Minor variancePending

    To modify the existing front yard parking to add two additional parking spaces and to allow for the continued use as a Day Nursery.

    24 PROGRESS AVE · Dec 2, 2026 · 286 m away
  • Zoning review

    Closed

    30 PROGRESS AVE · Sep 10, 2026 · 248 m away
  • Zoning review

    Notice Sent

    24 PROGRESS AVE · Aug 7, 2026 · 286 m away
  • Zoning review

    Closed

    60 PROGRESS AVE · Jun 17, 2026 · 155 m away
  • Building permit

    Proposed interior demolition of existing mezzanine.

    111 PROGRESS AVE · Feb 20, 2026 · 236 m away
  • Zoning review

    Closed

    30 PROGRESS AVE · Feb 18, 2026 · 248 m away
  • Building permit

    Proposed repair and replacement of the interior structural column damaged by vehicle impact.

    1050 ELLESMERE RD · Nov 26, 2025 · 290 m away
  • Building permit

    Proposal for Interior alteration includes demolition of existing premises, installation of new partitions, and the addition of a new plumbing

    35-45 PROGRESS AVE · Jul 21, 2025 · 136 m away
  • Zoning review

    Closed

    60 PROGRESS AVE · Apr 22, 2025 · 155 m away
  • Building permit

    HVAC - PROPOSED T-BAR CEILING TO TPH OFFICE SECTION

    1 WILLIAM KITCHEN RD · Feb 10, 2025 · 160 m away

Neighbourhood: Dorset Park

About the area around the lot, not the lot itself.

Nearest station
Scarborough Centre Station25 min walk
Nearest TTC stop
77 Progress Ave3 min walk
Nearest cycling route
Birkdale Ravine TrlMulti-Use Trail, 15 min walk
Nearest traffic count
11,027 vehicles in 8 hWilliam Kitchen Rd / Progress Ave, 180 m away, Feb 23, 2022
Serious collisions within 500 m
22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 0 with cyclists
Parks
Jolly Way Park8 min walk
West Birkdale Park9 min walk
Edgewood Park12 min walk

Schools within 1 km

  • ENQUIRING MINDS MONTESSORI AND LONDON SCHOOL OF DANCE Private 5 min walk
  • CENTENNIAL COLLEGE - MIDLAND CAMPUS College 9 min walk
  • EDGEWOOD PUBLIC SCHOOL English Public 16 min walk

Being near a school does not mean the lot is in its catchment; check with the board.

2021 Census

FigureDorset ParkMedian neighbourhood
Median household income (2020)$79,000$84,500
Households that own their home60%54%
Population (2021)24,30516,813
Homes built in 1960 or before26%29%
Homes needing major repairs7%7%

Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.

Police-reported crime, 2025

Per 100,000 peopleDorset ParkCity median
Assault672636.3
Robbery112.669.5
Shootings18.210.5
Auto theft356192.6
Theft over $5,00072.646.1
Break and enter192.5172.8
Theft from vehicles334.2188.1

Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.

Something here not right?

Sources

  • Building permits on this lot since 2000: Permits issued or applied for since about 2000, with status.
  • Committee of Adjustment files since 2001: Minor variances and consents (lot splits) on this lot and nearby, with decisions.
  • Development applications: Rezoning, site plan, subdivision and condominium applications.
  • Preliminary zoning reviews: Zoning reviews requested before a permit or variance application.
  • Zoning and overlays: Zoning By-law 569-2013 zone, height, coverage, policy area, parking, rooming house, priority retail street and downtown setback overlays.
  • Lot boundary, street and lane: Lot polygon, its addresses, the street it fronts, corner and public lane contact, with frontage and depth measured from the boundary; City of Toronto land in City use, which is not a home.
  • House and yards: Footprint and roof height of the house and other buildings, and the yard behind the house, from the City's 3D Massing (updated yearly, illustrative).
  • City trees in front of the lot: City-owned trees on the street allowance at this address, with species and trunk diameter. Private trees on the lot are not in open data.
  • Heritage: Heritage Register (listed and designated properties), Official Plan Amendment 720 properties and properties removed from the Register under the 2022 two-year limit.
  • TRCA regulated area: Valleys, floodplains, shorelines and wetlands regulated by the Toronto and Region Conservation Authority.
  • Ravines and natural features: Ravine and Natural Feature Protection area (Chapter 658, map last published 2019), Natural Heritage System and Environmentally Significant Areas.
  • Official Plan policies: Site and Area Specific Policies, Secondary Plans and Major Transit Station Areas covering the lot.
  • Rooming houses, short-term rentals and rental buildings: Multi-tenant house licences, short-term rental registrations and RentSafeTO evaluations at this address.
  • Neighbourhood context: Neighbourhood, 2021 Census figures, police-reported crime rates, schools, parks, TTC stops, cycling routes, serious collisions and traffic counts nearby. Area context only, not a finding about the lot.
  • Orders and by-law investigations: Outstanding Toronto Building orders, and by-law investigations open now or closed in the last two years. Fire and Public Health orders and older closed files are not published.
  • Address points: loaded Nov 22, 2026, published Nov 20, 2026
  • Toronto Building orders: loaded Nov 27, 2026, published Nov 26, 2026
  • Neighbourhood Profiles, 2021 Census: loaded Oct 14, 2026, published Oct 6, 2023
  • Street centrelines: loaded Nov 22, 2026, published Nov 20, 2026
  • City-owned land: loaded Nov 22, 2026, published Nov 16, 2026
  • Committee of Adjustment open applications: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions: loaded Nov 27, 2026, published Nov 26, 2026
  • Committee of Adjustment decisions 2001-2016: loaded Oct 14, 2026, published Feb 20, 2026
  • Collisions with people killed or seriously injured (Toronto Police Service): loaded Nov 22, 2026, published Nov 21, 2026
  • Neighbourhood crime rates (Toronto Police Service): loaded Oct 14, 2026, published Feb 20, 2026
  • Cycling network: loaded Nov 22, 2026, published Nov 16, 2026
  • Development applications: loaded Nov 27, 2026, published Nov 27, 2026
  • Environmentally Significant Areas: loaded Oct 14, 2026, published Mar 16, 2026
  • Green spaces: loaded Nov 15, 2026, published Nov 10, 2026
  • Heritage register: loaded Oct 14, 2026, published Sep 1, 2026
  • Former heritage listings: loaded Oct 14, 2026, published Jul 3, 2025
  • Official Plan Amendment 720 heritage list: loaded Oct 14, 2026, published Sep 1, 2026
  • 3D Massing building footprints: loaded Oct 14, 2026, published Dec 2, 2025
  • By-law investigation addresses: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigation deficiencies: loaded Nov 23, 2026, published Nov 22, 2026
  • By-law investigations: loaded Nov 27, 2026, published Nov 26, 2026
  • Major Transit Station Areas: loaded Oct 14, 2026, published Feb 3, 2026
  • Natural Heritage System: loaded Oct 14, 2026, published Mar 16, 2026
  • Neighbourhoods: loaded Oct 14, 2026, published Feb 20, 2026
  • Property boundaries: loaded Nov 27, 2026, published Nov 27, 2026
  • Active building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits: loaded Nov 27, 2026, published Nov 26, 2026
  • Cleared building permits 2000-2016: loaded Oct 14, 2026, published Jul 8, 2025
  • Preliminary zoning reviews: loaded Nov 27, 2026, published Nov 26, 2026
  • Ravine and natural feature protection: loaded Oct 14, 2026, published Jul 23, 2019
  • RentSafeTO evaluations: loaded Nov 27, 2026, published Nov 26, 2026
  • Multi-tenant house licences: loaded Nov 27, 2026, published Nov 26, 2026
  • Site and Area Specific Policies: loaded Oct 14, 2026, published Mar 16, 2026
  • School locations: loaded Oct 14, 2026, published May 27, 2026
  • Secondary Plans: loaded Oct 14, 2026, published Mar 16, 2026
  • Street trees: loaded Oct 14, 2026, published Jun 4, 2026
  • Short-term rental registrations: loaded Nov 27, 2026, published Nov 26, 2026
  • Traffic counts at intersections: loaded Nov 22, 2026, published Nov 21, 2026
  • TRCA regulation limit: loaded Oct 14, 2026, published Apr 29, 2026
  • TTC stops (GTFS): loaded Nov 8, 2026, published Nov 5, 2026
  • Zoning by-law: loaded Oct 14, 2026, published Feb 20, 2026
  • Lot coverage overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Height overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Parking zone overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Policy area overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Priority retail streets: loaded Oct 14, 2026, published Feb 20, 2026
  • Rooming house overlay: loaded Oct 14, 2026, published Feb 20, 2026
  • Zoning setbacks: loaded Oct 14, 2026, published Feb 20, 2026

Contains information licensed under the Open Government Licence – Toronto. TRCA regulation limit © TRCA.

Screening tool based on City of Toronto and TRCA open data. Not a zoning review or legal opinion. Site-specific exceptions, amendments not yet in the open data, minor variances and other by-laws can change the answer. Confirm with a Preliminary Project Review or Zoning Certificate from Toronto Building before buying or designing.

Flag an error

What is not right?

The problem

The records come from the City's open data; we check each flag against them. Your email is used only to answer this.