Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
Heritage property: designated (Part IV)
Needs a closer lookOn the City's Heritage Register. Demolition and exterior changes need heritage review.
What it means. Renovations, additions and demolition can take longer, cost more or be refused.
How to confirm. Heritage Planning at the City confirms the status and what it covers. Details
City of Toronto Heritage Register25 building permits open, the oldest since 2018
Needs a closer lookStill open in the City's records: 24 176556 (EXISTING TENANT - ATHLETA - INTERIOR RENOVATION - NO ALTERATION TO HVAC OR PLUMBING - T..., 2024, status Inspection); 24 137398 (Proposed interior alterations for 2 units, bring back to base, 2024, status Permit Issued); 24 133759 (Proposal for interior alterations - remove partitions, counters, and existing finishes..., 2024, status Inspection); and 22 more.
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)4 by-law investigations closed in the last two years
Good to knowClosed files (Property Standards, Zoning): 26 138251 ZON 00 IR (Zoning, 2026); 26 127050 ZON 00 IR (Zoning, 2026); 26 124375 ZON 00 IR (Zoning, 2026); and 1 more.
What it means. Someone raised an issue here and the City closed the file. Ask the seller what it was about.
City of Toronto, Toronto Building orders and Municipal Licensing and Standards investigationsWork or applications in progress
Good to knowRecent records on this lot: 26 266606 (Proposal to install and update the existing sprinkler system in the washrooms on the 22..., 2026); 26 265617 (Proposed interior alterations to existing tenant retail space, 2026); 26 265519 (Proposal for interior alterations to an existing retail store to accommodate a new tenant, 2026); and 28 more.
What it means. The owner has planned or started work. Ask what it covers, whether it will be finished before closing, and who pays for what is left.
How to confirm. Application details and decisions are in the City's Application Information Centre. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016); City of Toronto, Committee of Adjustment applications (2001 onwards); City of Toronto, Development Applications9 development applications open within 300 m
Good to know9 rezoning, site plan, subdivision or condominium applications within 300 m, submitted in the last 10 years, are not closed yet, including buildings of up to 71 storeys. They are listed under Around this lot.
What it means. New buildings nearby can change views, sunlight, traffic and construction noise for years.
How to confirm. Each application, its drawings and its status are in the Application Information Centre. Details
City of Toronto, Development Applications
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
645 records on file: more than at 100% of Toronto houses (median 0).
- Zoning review26 267952 LTOClosedNov 10, 2026 · 220 YONGE ST
- Building permit26 266606Not Started
Proposal to install and update the existing sprinkler system in the washrooms on the 22nd and 26th floors.
Nov 6, 2026 · 20 QUEEN ST W - Building permit26 265617Permit Issued
Proposed interior alterations to existing tenant retail space.
Nov 6, 2026 · 220 YONGE ST - Building permit26 265519Permit Issued
Proposal for interior alterations to an existing retail store to accommodate a new tenant.
Nov 6, 2026 · 220 YONGE ST - Building permit26 265636Under Review
Proposed interior alterations to an existing retail store for tenant improvements.
Nov 5, 2026 · 220 YONGE ST - Building permit26 247499Permit Issued
Rehabilitation of Level P2 parking area of the Yonge Street Parking Garage
Oct 27, 2026 · 220 YONGE ST - Building permit26 107876Revision Issued
REV 02: Revision for relocates the back egress door per RFI responsesREV 01: Per buble drawingsProposed interior alteration to commercial retail units.
Oct 23, 2026 · 220 YONGE ST - Building permit26 254298Permit Issued
2 wall signs**RW&CO**
Oct 19, 2026 · 220 YONGE ST
Show 192 older records
- Zoning review26 255389 LTOClosedOct 16, 2026 · 220 YONGE ST
- Building permit26 253792Examiner's Notice Sent
Proposed interior alterations to an existing office floor, including return-to-base work, washroom renovations, and associated HVAC and plumbing alterations.
Oct 13, 2026 · 20 QUEEN ST W - Building permit26 228070Inspection
Proposed interior alterations for expansion for DRA Americas Inc.
Sep 28, 2026 · 20 QUEEN ST W - Building permit26 211827Inspection
Interior alterations to an existing suite - including minor architectural, HVAC, plumbing, & electrical work.
Sep 24, 2026 · 220 YONGE ST - Building permit26 241061Permit Issued
NEW TENANT - JOURNEYS - INTERIOR ALTERATIONS
Sep 22, 2026 · 220 YONGE ST - Building permit26 229240Permit Issued
Proposed interior alterations for minor alteration within an existing retail unit inside Toronto Eaton Centre
Sep 2, 2026 · 220 YONGE ST - Building permit26 217869Permit Issued
3 Wall SIGNS ** UNI QLO **
Aug 14, 2026 · 220 YONGE ST - Building permit26 202620Closed
Proposed designing and installing sprinklers to fit interior renovations in an existing building on level 3, Unit C008A. OBC class E. Ref: 26 127970 BLD 00 BA.
Aug 5, 2026 · 220 YONGE ST - Zoning review26 212462 ZSVClosedJul 31, 2026 · 220 YONGE ST
- Building permit26 208573Inspection
Proposal for Interior Alterations - 'Foot Locker'
Jul 30, 2026 · 220 YONGE ST - Building permit26 189946Closed
proposed standalone sprinkler permit for Victora Secret Store- Remove upto one hundered and twenty (120) concealed sprinkler heads. - Remove up to 6 semi-recessed sprinkler heads. - Supply and install up to one hundered twenty (120) concealed sprinklers. - Supply and install up to six (6) semi-recessed sprinkler heads.
Jul 22, 2026 · 220 YONGE ST - Building permit26 141915Closed
HVAC - Proposal for interior alterations to upgrade existing retail space. Work includes partition walls, finishes, lighting, plumbing & HVAC.
Jul 20, 2026 · 220 YONGE ST - Building permit26 184510Inspection
Interior demolition and alterations to merge mall units, with new partitions, storefront, security grille, and modified HVAC, electrical, and sprinkler systems.
Jul 9, 2026 · 220 YONGE ST - Building permit26 194934Permit Issued
Proposal for Interior Alterations to existing retail store to reconfigure change rooms and painting 'THE GAP'.
Jul 6, 2026 · 220 YONGE ST - Building permit26 187978Inspection
Proposed interior alterations for tenant fit out including mechanical and electrical work.
Jun 24, 2026 · 20 QUEEN ST W - Building permit26 167546Closed
Proposal for interior alterations for a retail shop - "Kiokii"
Jun 24, 2026 · 220 YONGE ST - Building permit26 183286Inspection
Proposed interior tenant improvement for a new tenant (Lego)going into an existing space. Scope to include mech, elect, and plumb work along with 10' shelving display fixtures. Sprinkler/FA plans included also - unit 3123A
Jun 19, 2026 · 218 YONGE ST - Building permit26 182502Permit Issued
1 Wall Sign ** R.W & CO **
Jun 15, 2026 · 220 YONGE ST - Zoning review26 177954 ZPRClosedJun 4, 2026 · 220 YONGE ST
- Building permit26 150772Closed
INTERIOR ALTERATIONS FOR RETAIL UNIT 3123B. AREA OF UNIT TO BE RETURNED TO BASE.
May 1, 2026 · 220 YONGE ST - Building permit26 152707Issuance Pending
Level 3:Relocate (4) fire hose cabinets, install (4) wired head guards, (58) upright sprinklers, (35) white concealed pendent sprinklers, and (47) extended coverage white concealed pendent sprinklers.Level 4:Relocate (3) fire hose cabinets, install up to two (2) fire hose cabinets, (7) upright sprinklers, (56) white concealed pendent sprinklers, and (15) extended coverage white concealed pendent sprinklers.Level 5:Relocate (6) fire hose cabinets, install up to one (1) fire hose cabinets, (41) upright sprinklers, (91) white concealed pendent sprinklers, (20) extended coverage white concealed pendent sprinklers.
Apr 30, 2026 · 220 YONGE ST - Zoning review26 151005 LTOClosedApr 28, 2026 · 220 YONGE ST
- Building permit26 147718Permit Issued
Building permit scope of work to includes minor demolition work and the installation of new storefront glass panel infill and extension of storefront display on side storefront. No changes to egress path or life safety systems is proposed.
Apr 23, 2026 · 220 YONGE ST - Building permit26 132242Closed
Proposal to install and update the existing sprinkler system for the unit #2102A
Apr 17, 2026 · 220 YONGE ST - By-law investigation26 142042 GRA 00 IRClosed
Graffiti
Apr 11, 2026 · 232 YONGE ST - Building permit23 236066Closed
Revision 02 - to change structural remediation direction, original permit , demolition of existing washrooms servicing level 3 located on mezzaine level 3B accessed only by stairs. Conversion of commercial storeage unit C017S into new accessible public washrooms at level 3 with increase number of water closets.Revision 01 - see attached cover letter Demolition of existing washrooms serving level 3, located on mezzanine level "3B" accessed only by stairs. Conversion of commercial storage unit C017S into new, accessible public washrooms at level 3 with increased number of water closets.
Apr 9, 2026 · 220 YONGE ST - By-law investigation26 138251 ZON 00 IRClosed
Zoning
Apr 2, 2026 · 220 YONGE ST - Building permit25 267483Closed
Revision: We have made changes to the approved plans for permit 25 267483 BLD 00 BA, permit 25 267483 HVA 00 MS and permit 25 267483 PLB 00 PS. Please see provided revision letter for description of changes.
Mar 23, 2026 · 220 YONGE ST - By-law investigation26 127050 ZON 00 IRClosed
Zoning
Mar 9, 2026 · 220 YONGE ST - Building permit26 119188Inspection
Remove up to eighty-four (84) existing sprinklers.Relocate up to one (1) existing fire hose cabinet.Supply and install up to one-hundred-twelve (112) new upright sprinklers.Supply and install up to fifteen (15) new pendent sprinklers.
Mar 4, 2026 · 220 YONGE ST - By-law investigation26 124375 ZON 00 IRClosed
Zoning
Mar 3, 2026 · 220 YONGE ST - Building permit25 175711Closed
REV02: Proposed revision for changes to design described in cover memo and bubbled in the affected drawings. Re: (Interior alteration for new Aritzia Store within Unit #B-014) Revision 01 - Alterations to existing fire protection sprinkler system; Level 2 Suite B014B improvement. OBC Class E.---------------------------------------------------------------------------Proposal for interior alteration for new Aritzia Store within Unit #B-014
Feb 26, 2026 · 220 YONGE ST - Building permit25 267247Closed
Proposal to add partitions to create a new office and eye exam room and furnish them, re-arrage furniture and displays in sales area, upgrade electrical and HVAC accordingly.
Feb 23, 2026 · 220 YONGE ST - Building permit26 112753Closed
interior alterations to retail store. Unit B221C
Feb 11, 2026 · 220 YONGE ST - Building permit26 111979Cancelled
Proposal to Remove up to eighty-four (84) existing sprinklers. Relocate up to one (1) existing fire hose cabinet. Supply and install up to one-hundred-twelve (112) new upright sprinklers. Supply and install up to fifteen (15) new pendent sprinklers.
Feb 2, 2026 · 220 YONGE ST - Zoning review26 110815 LTOClosedJan 30, 2026 · 220 YONGE ST
- Building permit26 106253Closed
1 wall sign**CF TORONTO EATON CENTRE**
Jan 23, 2026 · 220 YONGE ST - Building permit25 264499Inspection
Proposed interior alterations to 3 washrooms located at lower level 0 and level 1 at the Toronto Eaton Centre.
Jan 19, 2026 · 220 YONGE ST - Building permit25 267563Closed
proposal to renovate partial exterior wall for existing retail tenant RW& Co
Jan 16, 2026 · 220 YONGE ST - Building permit25 262368Permit Issued
Proposal to repair post-tensioned beams within the parking garage
Jan 14, 2026 · 220 YONGE ST - Building permit25 259219Closed
HVAC - Proposal for interior alterations for retail store in Unit 2124A.
Jan 9, 2026 · 220 YONGE ST - Zoning review26 101170 ZMPClosedJan 6, 2026 · 220 YONGE ST
- Building permit25 267818Cancelled
Proposal for minor interior alterations to an existing retail unit, including removal of an interior wall
Dec 18, 2025 · 220 YONGE ST - Building permit25 262915Closed
HVAC - Proposal for interior alterations to existing retail unit for new take-out restaurant - "Tanghulu"
Dec 17, 2025 · 220 YONGE ST - Building permit25 155268Closed
Revision 01 - Modifying existing wet sprinkler system to suit a new entrance corridor/vestibule/storage room to an existing shopping mall on the second level(Street level). ------------------------------------------------------------------------------CF Toronto Eaton Centre - Temporary East entrance connecting to Yonge street.
Nov 26, 2025 · 220 YONGE ST - Building permit25 254062Cancelled
1 WALL SIGN**UNIQLO**
Nov 14, 2025 · 220 YONGE ST - Building permit25 248850Closed
PROPOSED INTERIOR ALTERATIONS TO INSTALL SECURITY GATES FOR SHOPPERS DRUG MART. STORE 824
Nov 6, 2025 · 220 YONGE ST - Building permit25 230662Closed
Proposed interior alterations for retail Unit 2122D - area of units to be returned to base & re-demised including retail Units 2120A & 2122C to become Unit 2122D.
Oct 21, 2025 · 220 YONGE ST - Building permit25 232400Permit Issued
2 wall signs**ZARA**
Oct 10, 2025 · 220 YONGE ST - Building permit25 228888Closed
HVAC - Proposed interior fit-out for an existing retail suite-fitting room. This scope of works includes new interior walls, fixtures and finishes, new lighting and power 'ZARA'
Oct 8, 2025 · 220 YONGE ST - Building permit25 232295Permit Issued
Proposed interior alterations to demising wall for suites 117, 117A & 118.
Oct 1, 2025 · 220 YONGE ST - Building permit25 225582Inspection
Proposal for interior alterations to Group E Mercantile (KNIX)
Sep 23, 2025 · 220 YONGE ST - Zoning review25 224382 LTOClosedSep 12, 2025 · 220 YONGE ST
- Building permit24 229821Closed
5th floor washroom configuration to be altered from the issued permit. Drawing bubble the changes
Sep 12, 2025 · 220 YONGE ST - Building permit25 203213Closed
Proposal for tenant remodel of existing jewellery store.
Sep 5, 2025 · 220 YONGE ST - Building permit25 219557Cancelled
Proposal for interior alterations to existing Group E-Mercantile Occupancy.
Sep 3, 2025 · 220 YONGE ST - Building permit25 198919Permit Issued
Proposed level P5 parking garage rehabilitation
Sep 3, 2025 · 220 YONGE ST - Building permit25 209277Closed
Proposed interior alterations to partial 9th floor.
Aug 20, 2025 · 250 YONGE ST - Zoning review25 211239 ZSVCancelledAug 15, 2025 · 220 YONGE ST
- Building permit25 142589Closed
Revision 01: Interior alteration to existing retail store.
Jul 29, 2025 · 220 YONGE ST - Zoning review25 200917 LTOClosedJul 28, 2025 · 220 YONGE ST
- Zoning review25 200916 LTOClosedJul 28, 2025 · 220 YONGE ST
- By-law investigation25 197805 PRS 00 IRClosed
Property Standards
Jul 22, 2025 · 210 YONGE ST - Building permit25 179661Closed
Proposal for interior alterations for offices for Hockey Canada.
Jul 17, 2025 · 250 YONGE ST - Building permit25 189312Inspection
This project consists of designing and installing a modification to the overhead wet sprinkler system in an existing retail mall. The starting point for install is Unit B202 sprinkler system. OBC Class Group E.
Jul 16, 2025 · 220 YONGE ST - Building permit25 174788Cancelled
2 wall signs**Zara**
Jun 10, 2025 · 220 YONGE ST - Building permit25 141845Closed
Interior fit-out of new office space to existing Group D occupancy
Jun 4, 2025 · 250 YONGE ST - Building permit25 160192Closed
Proposal for interior alterations for retail store in unit C0091.
May 21, 2025 · 220 YONGE ST - Building permit24 229857Closed
Rev 01: NTERIOR RENOVATION OF A RETAIL UNIT, REVISION TO 24 229857 BLD 00 BA, RELOCATION OF FHC Proposal for interior remodel of existing tenant space for use by clothing store (mercantile - no change in use), including new walls, doors, ceilings, lighting, finishes, display fixtures, and associated modifications to existing electrical, mechanical, fire sprinkler, and fire alarm systems.
May 5, 2025 · 220 YONGE ST - Building permit25 150774Closed
Proposal for interior alterations to office suite (33rd floor). Back to base office.
May 2, 2025 · 20 QUEEN ST W - Building permit25 139194Cancelled
1. EXISTING DEMISING WALL TO REMAIN WITH NO CHANGES2. STOREFRONT GLAZING & BULKHEAD TO BE DEMOLISH AND REBUILD TO SUIT NEW DESIGN3. EXISTING HVAC TO REMAIN, SPRINKLER HEIGHTS TO BE ADJUSTED IN EXISTING LOCATIONS TO SUIT NEW DESIGN
Apr 3, 2025 · 220 YONGE ST - Building permit25 134672Closed
Proposed installation of 2 new electromagnetic locking device on 25th floor elevator lobby
Apr 1, 2025 · 20 QUEEN ST W - Building permit25 129053Closed
Proposed Interior alterations of an existing suite including minor architectural, HVAC, plumbing, and electrical work.
Mar 25, 2025 · 218 YONGE ST - Building permit25 115521Inspection
Proposal to perform interior alterations to combine multiple retail units B014,B014B, B014C, B009.
Mar 17, 2025 · 220 YONGE ST - Building permit22 232079Closed
Revision #4:Amendment to Permit 22 232079 - Delete second floor scope (ADO, maglocks and card readers for three doors)Revision #3: Add Access control devices (ADO, maglock and card reader) to six doors (four existing and two new)Revision #02 - Floors 2, 3, to add hotspot, workstation.REV - Proposal for revision to Permit 22 232079 due to changes in the layout.
Feb 28, 2025 · 20 QUEEN ST W - Zoning review25 114675 LTOClosedFeb 10, 2025 · 220 YONGE ST
- Building permit25 107452Closed
The project consists of designing and installing alteration to an existing wet sprinkler system in the washrooms of the 12, 23 24 33rd floors of and existing high rise commercial office building.
Feb 5, 2025 · 20 QUEEN ST W - Building permit24 245181Inspection
Proposed interior alteration to an existing Browns Shoes CRU within Eaton Centre. Work includes new finishes, partition walls, storefront, lighting and HVAC
Jan 30, 2025 · 220 YONGE ST - Zoning review25 107317 LTOClosedJan 22, 2025 · 220 YONGE ST
- Building permit24 250722Closed
2 wall signs**Saint Germain Bakery**
Jan 3, 2025 · 220 YONGE ST - Building permit24 251280Closed
PROPOSAL FOR RENOVATION OF EXISTING MEN'S AND WOMEN'S WASHROOMS AND ADJACENT CORRIDOR ON LEVEL 2, INTERIOR ALTERATION TO ADD TEMPORARY WASHROOMS IN CRU 2120A WHILE LEVEL 2 WASHROOMS GO UNDER RENOVATION.
Dec 29, 2024 · 220 YONGE ST - Building permit24 242790Closed
Proposed interior alterations to existing retail store, mechanical, electrical, finishes and fixturing.
Nov 28, 2024 · 220 YONGE ST - Building permit24 223054Closed
Proposed interior alterations to an interior retail space
Nov 5, 2024 · 218 YONGE ST - Building permit24 233795Cancelled
2 Wall sign
Nov 1, 2024 · 220 YONGE ST - Building permit24 229051Closed
Proposed interior alterations (Lululemon) - 102BTENANT IMPROVEMENTS INCLUDING MINOR RENOVATION AND ADDITION OF SUSPENDED GYPSUM CEILING PAD AND NEW LIGHTING, INCLUDING MINOR MECHANICAL WORK.
Nov 1, 2024 · 220 YONGE ST - Zoning review24 232281 LPRClosedOct 29, 2024 · 220 YONGE ST
- Building permit24 145025Closed
Revision - This update removes the remote storage location from the permit - American Eagle
Oct 25, 2024 · 220 YONGE ST - Building permit24 226182Cancelled
Proposal for interior alterations to remote storage for retail space (american eagle)
Oct 15, 2024 · 220 YONGE ST - Building permit24 216885Cancelled
Proposed interior alterations for updated finishes for elevator lobby and public corridor on Floor 33 & 35
Oct 4, 2024 · 20 QUEEN ST W - Building permit24 194279Closed
HVAC - Proposal to construct interior alterations to new bakery retail store
Oct 3, 2024 · 220 YONGE ST - Building permit24 215557Closed
Interior alterations to unit H030B - existing Mr. Pretzel quick serve restaurant into a Wetzels Pretzels. Scope of work includes; architectural, electrical and mechanical
Sep 30, 2024 · 220 YONGE ST - Building permit24 202808Closed
Proposed interior alteration for updated finishes for the base building core washrooms on Floor 12, 23, 23 & 33
Sep 30, 2024 · 20 QUEEN ST W - Zoning review24 213845 LTOClosedSep 17, 2024 · 220 YONGE ST
- Zoning review24 206793 LTOClosedSep 2, 2024 · 220 YONGE ST
- Zoning review24 204006 LTOClosedAug 27, 2024 · 218 YONGE ST
- Building permit24 194261Closed
Interior alterations to existing suite/concession for new tenant - retail store
Aug 27, 2024 · 220 YONGE ST - Building permit24 183534Closed
New plumbing and drainage for an existing cafe kiosk installation (formerly Starbucks) in Unit 1158B - Arabica
Aug 15, 2024 · 220 YONGE ST - Building permit24 194930Closed
2 Wall Sign BMO
Aug 14, 2024 · 220 YONGE ST - Building permit24 187346Closed
INTERIOR ALTERATION TO AN INTERIOR RETAIL SPACE (FOOD USE).UNIT H018
Aug 1, 2024 · 218 YONGE ST - Zoning review24 180317 LTOClosedJul 15, 2024 · 220 YONGE ST
- Building permit24 176556Inspection
EXISTING TENANT - ATHLETA - INTERIOR RENOVATION - NO ALTERATION TO HVAC OR PLUMBING - TORONTO EATON CENTRE, LEVEL 3
Jul 15, 2024 · 220 YONGE ST - Building permit24 172883Closed
Proposal for interior alterations to existing retail space
Jul 5, 2024 · 220 YONGE ST - Zoning review24 172730 LTOClosedJul 2, 2024 · 220 YONGE ST
- Zoning review24 171980 ZPRClosedJun 28, 2024 · 220 YONGE ST
- Building permit24 169736Closed
Remodel of existing retail clothing store, including demolition of interior partitions, new floors, new walls, doors, ceiling, lighting and associated electrical, and fire alarm system.
Jun 27, 2024 · 220 YONGE ST - Building permit24 164954Closed
Proposed temporary slide and security enclosure between second and third-floors of existing shopping centre.Date erect - July 4, 2024 Date removed - July 26, 2024
Jun 24, 2024 · 220 YONGE ST - Building permit24 165902Closed
New installation of an electromagnetic locks - 3, in the third level
Jun 21, 2024 · 220 YONGE ST - Building permit24 160965Closed
Proposed interior alterations to existing retail store. Existing demising wall to remain; proposed demolition and construction of partitions. New hvac, sprinkler and electrical design to suit to new layout.
Jun 12, 2024 · 220 YONGE ST - Building permit24 147804Closed
Proposal for interior alterations to a portion of an existing office unit, located on floor 27. Construct a demising wall to separate & create 2 units. Exist. unit (not in scope) reduced in area & maintained as an office unit. New unit created; Separate BLD req'd for tenant occupancy for this new vacant office unit.
Jun 12, 2024 · 250 YONGE ST - Building permit24 161173Cancelled
Interior renovation for existing office suite - unit 1601 and 1801
Jun 7, 2024 · 20 QUEEN ST W - Building permit24 157982Closed
Interior alterations - Unit 2400 - OBSI
Jun 7, 2024 · 20 QUEEN ST W - Building permit24 150773Closed
1 WALL SIGN
May 24, 2024 · 220 YONGE ST - Building permit24 140636Closed
Proposal for removing existing improvements and return floor 6 back to base building standard
May 17, 2024 · 250 YONGE ST - Building permit24 137398Permit Issued
Proposed interior alterations for 2 units, bring back to base
May 17, 2024 · 220 YONGE ST - Building permit24 146529Closed
1 WALL
May 16, 2024 · 220 YONGE ST - Building permit24 136954Closed
Proposal for new kiosk installation at Toronto Eaton Center. Tenant improvement. No change of use
May 7, 2024 · 220 YONGE ST - Building permit23 216753Closed
Revision #01 - Stuctural upgrade changes due to on site conditions.Proposing selective demolition and interior build-out for new client. Change of use. Retail space into BMO financial branch. New safety Vault proposed weighing 175 KN hung from floor above
May 7, 2024 · 220 YONGE ST - Building permit24 140534Closed
Proposal for Interior alterations.
Apr 26, 2024 · 20 QUEEN ST W - Building permit24 127253Closed
Proposal for interior alterations to return the existing office space on the 8th floor level to base building condition. [Eaton Centre]
Apr 18, 2024 · 20 QUEEN ST W - Building permit24 136888Cancelled
Replace all vision and spandrel glazing of office tower and additional podium areas (no increase in unprotected openings).
Apr 16, 2024 · 20 QUEEN ST W - Building permit24 133759Inspection
Proposal for interior alterations - remove partitions, counters, and existing finishes and replace with new equipment, counters, signage
Apr 10, 2024 · 218 YONGE ST - Zoning review24 129942 LTOClosedMar 27, 2024 · 220 YONGE ST
- Building permit24 118992Closed
Proposal for interior alterations to portions of the existing 22nd floor level. Demising wall constructed within exist. office Suite 2200 to create 2 units. Occupancy permit req'd for new vacant office Suite 2203.
Mar 27, 2024 · 220 YONGE ST - Building permit24 121573Closed
Interior alterations to an existing retail store
Mar 25, 2024 · 218 YONGE ST - Building permit24 120566Approved
PROPOSAL: To permit the increased egress travel distance from the proposed washroom area on Level 3 of the Eaton Centre (TEC) based on the proposed mitigating measures for increased fire compartmentation, wayfinding, and earlier detection.
Feb 29, 2024 · 220 YONGE ST - Building permit24 114882Permit Issued
PROPOSAL TO CONSTRUCT INTERIOR ALTERATIONS FOR RETAIL UNIT N114B. UNIT TO BE PARTIALLY RETURNED TO BASE & REDEMISED FOR NEW STORAGE ROOM.
Feb 29, 2024 · 220 YONGE ST - Building permit23 236128Permit Issued
Proposed minor interior renovation : relocation of the millwork and lighting in the sales area of an existing Zara's store. (Only architectural and electrical work required)
Feb 7, 2024 · 220 YONGE ST - Zoning review24 111560 LTOClosedFeb 5, 2024 · 220 YONGE ST
- Zoning review24 111479 ZPRClosedFeb 4, 2024 · 220 YONGE ST
- Building permit24 107442Closed
Application for a permit to erect and display one first party overhanging sign, displaying static copy and illuminated, erected at the first storey.Dimensions:Overhanging sign: 0.89m L x 5.85 W x 0.13m D at a height of 5.46 on the west elevation.**** MILESTONES****
Feb 2, 2024 · 218 YONGE ST - Building permit23 238395Closed
Tenant improvement consisting of new non-structural partitions, ceiling, finishes, fixtures and related mechanical, plumbing and electrical work.
Jan 29, 2024 · 220 YONGE ST - Zoning review24 106874 LTOClosedJan 22, 2024 · 220 YONGE ST
- Building permit23 236936Inspection
Proposed minor renovation of an existing tenant fit out.
Jan 18, 2024 · 220 YONGE ST - Building permit24 102856Cancelled
Interior alterations for tenant fit out in CRU D101 - Ricardo's Kandy Korner - Toronto Eaton Centre
Jan 9, 2024 · 220 YONGE ST - Building permit23 229173Inspection
INTERIOR ALTERATIONS FOR RETAIL FAST FOOD
Jan 8, 2024 · 220 YONGE ST - Building permit24 101098Cancelled
2 WALL SIGN
Jan 4, 2024 · 220 YONGE ST - Zoning review23 234768 LTOClosedDec 12, 2023 · 218 YONGE ST
- Building permit23 224639Permit Issued
Proposed interior alterations to retail store, work to include new partitions, new finishes, new lighting, electrical work, and mechanical work - Unit A-43A
Dec 8, 2023 · 220 YONGE ST - Zoning review23 231225 LTOClosedNov 30, 2023 · 220 YONGE ST
- Building permit23 222021Permit Issued
Proposal for Interior Partitions, tenant finishes & fixturesto an existing retail unit within a mall.
Nov 9, 2023 · 220 YONGE ST - Zoning review23 223084 LTOClosedNov 7, 2023 · 220 YONGE ST
- Building permit23 114765Closed
REV 01: Proposal for sprinkler alteration to existing system for New Food Hall. Tenant - 'Oliver & Bonacini' [Queen's Cross Food Hall - CF Eaton Centre]Proposed reno. & alteration to exist. restaurant for tenant fitout. Work to incl. HVAC & plumbing (Under Separate Permits).
Oct 23, 2023 · 220 YONGE ST - Zoning review23 208647 LTOClosedSep 29, 2023 · 220 YONGE ST
- Building permit23 206677Cancelled
HVAC - Interior alterations to suite 110 - scope of work includes plumbing, HVAC and electrical - Columbus Cafe and Co.
Sep 25, 2023 · 220 YONGE ST - Zoning review23 201981 LTOClosedSep 14, 2023 · 220 YONGE ST
- Building permit23 181739Closed
Rev. 01, Structural revisionInterior alterations to unit H017 - Real Fruit Bubble Tea
Aug 30, 2023 · 218 YONGE ST - Building permit23 175743Permit Issued
Proposal for Temporary Office
Aug 29, 2023 · 220 YONGE ST - Building permit23 182345Permit Issued
Proposed electromaginetic locks replacement on the 28th floor.
Aug 3, 2023 · 20 QUEEN ST W - Zoning review23 182074 LTOClosedJul 31, 2023 · 220 YONGE ST
- Building permit23 180349Permit Issued
Interior alterations to existing office space in unit 118, construction includes new meeting room, two new offices and kitchen renovations
Jul 28, 2023 · 220 YONGE ST - Building permit23 180347Closed
Interior alterations to existing office space in unit 203, construction includes new meeting room, two new offices and kitchen renovations
Jul 28, 2023 · 220 YONGE ST - Building permit23 179311Cancelled
<4 Install 1 First Party wall sign
Jul 27, 2023 · 220 YONGE ST - Building permit22 243086Closed
REV01: Proposed revision of scope changes includes existing washroom to remain. Demolition of existing washroom, construction of new washroom, and future plumbing and drain provisions near storefront have been deleted from scope of work.NEW TENANT BUILD OUT WITHIN EXISTING RETAIL SPACE. SCOPE INCLUDES NEW PARTITIONS, CEILINGS, FINISHES, MILLWORK AND MECHANICAL & ELECTRCIAL PROVISIONS
May 17, 2023 · 220 YONGE ST - Building permit23 133136Closed
Drain down glycol line for abandoned Heat Pump system. Add (2) new VAV boxes
May 10, 2023 · 250 YONGE ST - Building permit23 131105Closed
Interior alterations to Pilgrim store
Apr 13, 2023 · 220 YONGE ST - Building permit22 177542Closed
Revision 02:Renovations and alteration to exist Restaurant for new Restaurant tenant space fitout, including HVAC and plumbing work.- Relocated Ecology unit and provision of new louvres.Rev 01: alteration to James Street facade and small front addition to reconfigure vestibule
Apr 4, 2023 · 220 YONGE ST - Building permit22 189573Closed
Proposal for concrete repairs on P1, P2, P3, P4 & P5 levels to suspended parking slabs, repairs to concrete beams, replacement of expansion joints and waterproofing of suspended slabs. Parking garage rehabilitation and installation of new structural framing system to replace post-tensioning. No public parking spaces are proposed to be eliminated. [Eaton Centre Yonge Street Parkade - This existing parking facility operates as a public parking garage.]
Apr 3, 2023 · 220 YONGE ST - Building permit23 127799Closed
Electromagnetic Locks on 2nd floor, 4 in total as per applicant
Mar 29, 2023 · 20 QUEEN ST W - Building permit23 104959Permit Issued
Proposed minor interior alteration of existing coffee shop 'HESTIA' in unit YG-18
Feb 2, 2023 · 220 YONGE ST - Building permit22 238835Permit Issued
PROPOSAL FOR INTERIOR ALTERATIONS FOR DEMOLITION OF ARCHITECTURAL INTERIOR FINISHES AND STOREFRONT ONLY - UNIT A046C, LOCATED ON LEVEL 1. RETURN TO BASE BUILDING CONDITION. EXISTING CEILINGS AND LIFE SAFETY SYSTEMS TO REMAIN INTACT. [CEILING DEMOLITION AND TENANT FIT OUT TO BE INCLUDED IN SEPARATE BUILDING PERMIT APPLICATION.]
Jan 31, 2023 · 218 YONGE ST - Building permit22 239379Closed
Proposal for interior alterations to return this existing CRU (Unit A002) on Level 1 to base building conditions. Interior work to include adding a new BF washroom to back-of-house area of the unit & 1 new interior partition. [CF Eaton Centre] [1 Dundas St W]
Jan 16, 2023 · 220 YONGE ST - Building permit22 236687Closed
Proposed interior alterations for retail shop in unit B205E
Dec 20, 2022 · 220 YONGE ST - Building permit20 163898Cancelled
REV 01: Alterations to permit plansInterior alterations below ground
Nov 28, 2022 · 220 YONGE ST - Building permit22 219307Closed
interior alterations back to base on Floor 2 for future permit
Nov 23, 2022 · 20 QUEEN ST W - Building permit22 224778Closed
Application for a permit to erect and display one first party, static, illuminated wall sign on the south west elevation. Wall sign is in Ward #13 Toronto Centre and is subject to sign district CR-Commercial Residential and DS-SSD Dundas Sqaure Special Sign District.SIGN DIMENSIONS:0.72m L x 0.91m W x 0.03m D x 2.19m H*****THE HERSCHEL*****
Nov 18, 2022 · 220 YONGE ST - Zoning review22 225272 LTOClosedNov 3, 2022 · 220 YONGE ST
- Building permit22 206229Closed
Proposal to construct interior alterations for a retail store.
Oct 28, 2022 · 218 YONGE ST - Building permit22 213844Closed
Proposal for interior renovation - Sunglass Hut
Oct 19, 2022 · 220 YONGE ST - Building permit22 213490Approved
Alternative Solution for permit 22-189573 - We are requesting approval for an alternative solution using the provisions stated in NBC Commentary L for the seismic analysis of the existing structure to be renovated. Our analysis/design has been completed using spectral acceleration values with a probability of exceedance of 5% in 50 years (1/1000 per year) or Level 3 as noted in the flow chart in commentary L. We believe that this is a conservative approach to the use of the guidance provided in the commentary, whereby, if the existing structure has sufficient capacity to resist seismic loads based on spectral acceleration values with a probability of exceedance of 10% in 50 years (1/475 per year), or Level 2 as noted in the flow chart, it is permitted to remain with no decrease in capacity. Since our analysis is based on the 5% in 50 year loads, and the performance level of the existing structure will not be reduced after the renovation per the criteria defined in 11.4.2., we feel that this is an acceptable approach.
Oct 5, 2022 · 220 YONGE ST - Building permit22 213400Cancelled
Proposed new renovations and alteration to exist Restaurant for new Restaurant tenant space fitout, including HVAC and plumbing work. Oliver & Bonicini
Oct 5, 2022 · 220 YONGE ST - Building permit22 162420Permit Issued
Proposal for exterior alteration to the existing facade building envelope including demolition for new exterior wall, finishes and digital screen.
Sep 29, 2022 · 220 YONGE ST - Building permit22 180596Closed
HVAC - Proposal for interior alteration for a new tenant (Unit 3125A Athleta)
Aug 24, 2022 · 220 YONGE ST - Zoning review22 185361 ZPRClosedAug 3, 2022 · 220 YONGE ST
- Building permit22 169098Closed
Plumbing - Interior alterations for retail unit B004A, unit to be returned to base and redemised for new storage room
Jul 28, 2022 · 220 YONGE ST - Zoning review22 175809 LTOClosedJul 13, 2022 · 220 YONGE ST
- Building permit22 156537Closed
HVAC - Proposal for inteiror alteraitons for a new Patti Express inside Eaton Centre.
Jul 6, 2022 · 218 YONGE ST - Building permit22 148554Permit Issued
Proposal to install and update the existing sprinkler system for the space # C018A on the third level. (22 118406 BLD 00 BA)
Jul 6, 2022 · 220 YONGE ST - Building permit22 159490Closed
Proposal for interior alterations for new tenant Herschel Supply Company in Eaton Centre. UNIT 2115A
Jun 14, 2022 · 220 YONGE ST - Building permit22 157444Permit Issued
Interior alterations - Unit R020 - Bath & Body Works
Jun 10, 2022 · 220 YONGE ST - Building permit22 146500Closed
Interior renovation to existing Sephora store at Eaton Centre. Minor floor electrical work, wall finish upgrades, and a new fixture with sink and pump. No changes to the storefront, stockroom, or ceiling.
May 26, 2022 · 220 YONGE ST - Zoning review22 144502 LTOClosedMay 10, 2022 · 250 YONGE ST
- Building permit22 124856Inspection
Proposal for interior alterations to an existing food court unit (F001A / CRU - F1 [044]) for tenant - 'Gong Cha' in the Eaton Centre. Work includes HVAC & plumbing alterations.
Apr 21, 2022 · 220 YONGE ST - Zoning review22 134216 LPRClosedApr 13, 2022 · 220 YONGE ST
- Building permit22 119484Closed
Interior alteration to existing retail suite; non structural demolition, new partitions, ceilings, doors, hardware, finishes, store fixtures, new restroom with one water closet and one lavatory. Four new heat pumps and condensing units, duct work, diffusers, controls, and restroom exhaust. Existing electrical service, new panels, transformer, lighting controls, lighting, outlets, switches and miscellaneous low voltage - Unit 007A - Bath & Body Works
Apr 8, 2022 · 220 YONGE ST - Building permit22 121692Closed
Proposal for interior alterations to an existing office on the 28th floor level. Work includes construction of new interior partitions.
Mar 30, 2022 · 20 QUEEN ST W - Zoning review22 127715 LPRClosedMar 28, 2022 · 220 YONGE ST
- Building permit22 118406Closed
Interior alterations to unit # C018A
Mar 23, 2022 · 220 YONGE ST - Building permit22 118979Closed
Interior alterations - Machi Machi Unit - Tec Level 1 H021B - Food court
Mar 14, 2022 · 220 YONGE ST - Building permit22 115582Inspection
Proposed Interior Alterations to extend existing store bulkhead, install new ceramic tiles on existing and nw bulkhead and replave existing store sign with new sign. Unit B-027A.
Mar 11, 2022 · 220 YONGE ST - Zoning review22 116790 LTOClosedFeb 24, 2022 · 220 YONGE ST
- Building permit22 112301Closed
Interior alterations to retail store unit 3108
Feb 14, 2022 · 220 YONGE ST - Building permit21 248757Inspection
Fire pump replacement in the fire pump room
Feb 8, 2022 · 20 QUEEN ST W
Showing the latest 200 of 645 records.
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 22,616 m²
- Frontage
- 100.7 m
- Depth
- 260.8 m
- Street
- Shuter St
- Corner lot
- Yes, also on James St260.8 m along it
- Public lane
- None
- House footprint
- 22,310 m²
- Back yard
- 0.5 mhouse to rear lot line
- Side yards
- 0 m and 0 mhouse to side lot lines; 0 is a shared wall
- Buildings on the lot
- 34house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 4 City trees in front of this lot. The City's street tree inventory lists 4 trees at this address: honey locust (8 cm), honey locust (8 cm), elm, accolade (8 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 100%7 of 7 decisions
- Garden suite permits
- 2
- Laneway suite permits
- 0
- Multiplex permits
- 0
- Development applications
- 18
Within 300 m, last 10 years. 2 suite and multiplex permits: no more than at most Toronto houses (median 3). 7 variance decisions: no more than at most Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceApproved
To permit a new eating establishment with karaoke rooms on the second storey (with an increased total floor area), and an eating establishment on the ground floor with washrooms and storage located in the basement, within the existing two-storey commercial building.
332 YONGE ST · Oct 14, 2026 · 449 m away - Minor varianceApproved
To alter the existing 12-storey mixed-use building by enclosing the front outdoor patio of the ground floor eating establishment (restaurant).
20 KING ST W · Jun 17, 2026 · 467 m away - Minor varianceApproved
To alter the existing public hospital (St. Michael's Hospital, bounded by Shuter Street, Bond Street, Queen Street East, and Victoria Street) by installing an air handling unit (AHU) on a portion of the roof (Donnelly Wing).
30 BOND ST · Jan 21, 2026 · 211 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached building by increasing the non-residential floor space index.
53 A MUTUAL ST · Oct 1, 2025 · 488 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey attached building by increasing the non-residential floor space index.
53 MUTUAL ST · Oct 1, 2025 · 498 m away
Latest activity nearby
- Building permit
Proposed interior alterations Building, plumbing and HVAC work to tenant space.
151 YONGE ST · Nov 20, 2026 · 262 m away - Building permit
Proposal to replace existing pre-action system fire control panel and associated initiating field devices.
30 BOND ST · Nov 19, 2026 · 211 m away - Building permit
Installation of two (2) temporary structures for Cavalcade of Lights 2026 (Event)30' x 30' Tent for Arts & Crafts Supplied by Gervais Tents20' x 16' x 5' Theatre Stage Extension Riser Supplied by PSIInstall 11/25/2026 / Removal 11/29/2026
100 QUEEN ST W · Nov 19, 2026 · 296 m away - Building permit
Proposal for interior alterations including furniture & elevator refurbishment.
100 QUEEN ST W · Nov 18, 2026 · 296 m away - Building permit
7 wall signs***WELL HEALTH MEDICAL CENTRES***
20 RICHMOND ST E · Nov 16, 2026 · 223 m away - Zoning review
Closed
220 YONGE ST · Nov 10, 2026 · 28 m away - Zoning review
Closed
2 QUEEN ST E · Nov 10, 2026 · 139 m away - Zoning review
Not Started
21 DUNDAS SQ · Nov 6, 2026 · 266 m away - Building permit
Proposal to install and update the existing sprinkler system in the washrooms on the 22nd and 26th floors.
20 QUEEN ST W · Nov 6, 2026 · 124 m away - Building permit
Proposed interior alterations to existing tenant retail space.
220 YONGE ST · Nov 6, 2026 · 28 m away
Neighbourhood: Yonge-Bay Corridor
About the area around the lot, not the lot itself.
- Nearest station
- Queen Station3 min walk
- Nearest TTC stop
- Queen Station - Northbound Platform1 min walk
- Nearest cycling route
- Shuter StBike Lane, 1 min walk
- Nearest traffic count
- 10,405 vehicles in 14 hYonge St / Shuter St, 70 m away, Apr 12, 2025
- Serious collisions within 500 m
- 142021–2026, killed or seriously injured: 2 fatal, 8 with pedestrians, 1 with cyclists
- Parks
- Trinity Square2 min walk
- Cloud Gardens4 min walk
- Larry Sefton Park4 min walk
Schools within 1 km
- ST MICHAEL'S CHOIR SCHOOL - GYMNASIUM BLDG English Separate 4 min walk
- ST MICHAEL'S CHOIR SCHOOL - CHORAL BLDG English Separate 4 min walk
- ST MICHAEL'S CHOIR SCHOOL - ELEMENTARY English Separate 5 min walk
- TORONTO METROPOLITAN UNIVERSITY - ENTR TO BUSINESS SCHOOL LOBBY University 5 min walk
- ST MICHAEL'S CHOIR SCHOOL - SECONDARY English Separate 5 min walk
- VICTORIA STREET LINC English Public 6 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | Yonge-Bay Corridor | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $68,500 | $84,500 |
| Households that own their home | 32% | 54% |
| Population (2021) | 12,645 | 16,813 |
| Homes built in 1960 or before | 2% | 29% |
| Homes needing major repairs | 2% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | Yonge-Bay Corridor | City median |
|---|---|---|
| Assault | 3361.1 | 636.3 |
| Robbery | 300.1 | 69.5 |
| Homicide | 12 | 5.3 |
| Shootings | 12 | 10.5 |
| Auto theft | 162.1 | 192.6 |
| Theft over $5,000 | 210.1 | 46.1 |
| Break and enter | 552.2 | 172.8 |
| Theft from vehicles | 402.1 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.