Before you offer
From the City's records on this lot. Each item says what it means for a purchase and how to confirm it.
2 building permits open, the oldest since 2009
Needs a closer lookStill open in the City's records: 17 177232 (Modify existing sprinkler system to accomodate for new room layout in room 2008 on the..., 2017, status Permit Issued); 09 161560 (Proposal to install solar thermal panels for domestic hot water for University of Toron..., 2009, status Inspection).
What it means. An open permit can mean work that was never finished or never passed final inspection. After closing, finishing it or closing the file can fall to you.
How to confirm. Ask the seller for the final inspection records. A Property Information Report from Toronto Building lists open permits, inspections and outstanding orders ($214.79, about five business days). Details
City of Toronto, Building Permits (active, cleared since 2017, cleared 2000-2016)
Not in these records
- Flooding history. Past basement flooding and insurance claims on this house are not published. Ask the seller directly and ask your insurer before you firm up the offer.
- Ownership, mortgages and easements. Title is not open data. Your lawyer searches title after the offer; ask for the survey and any easements before.
History of this lot
18 records on file: more than at 100% of Toronto houses (median 0).
- Zoning review24 202399 ZPRClosedAug 22, 2024 · 617 SPADINA AVE
- Zoning review24 161382 ZMPApplication On HoldJun 7, 2024 · 617 SPADINA AVE
- Zoning review23 136035 LTOClosedApr 20, 2023 · 55 HARBORD ST
- Building permit22 230040Closed
To erect and display one wall sign (Illuminated by top lights), displaying static copy. ***Second Cup U of T***
Dec 1, 2022 · 617 SPADINA AVE - Zoning review21 137397 ZPRClosedApr 8, 2021 · 617 SPADINA AVE
- Building permit20 139675Closed
Proposed interior alterations of an existing testing lab on the second floor of Warren Stevens building
May 28, 2020 · 55 HARBORD ST - Building permit16 114076Closed
FS - Sprinkler Shop Drawing - Proposal for interior alterations to classroom & physiotherapy treatment area, "University of Toronto"
May 28, 2020 · 55 HARBORD ST - Building permit19 138761Closed
Proposal to install backflow prevention device for Athletic Facilities in existing university.
May 22, 2019 · 55 HARBORD ST
Show 10 older records
- Building permit19 131169Closed
Proposal for interior alterations to the second level of the Warren Stevens building. unit 2013
Apr 24, 2019 · 55 HARBORD ST - Building permit17 177232Permit Issued
Modify existing sprinkler system to accomodate for new room layout in room 2008 on the second floor - University of Toronto - Warren Stevens
Jul 24, 2017 · 617 SPADINA AVE - Building permit17 110200Closed
Interior alterations to the Physio testing facility on the second floor of the Warren Stevens Building - University of Toronto
Feb 7, 2017 · 617 SPADINA AVE - Building permit15 127984Closed
Interior alteration to existing rec room and lab testing room at U Of T
Apr 13, 2015 · 55 HARBORD ST - Zoning review10 284379 LTOClosedOct 25, 2010 · 55 HARBORD ST
- Building permit09 161560Inspection
Proposal to install solar thermal panels for domestic hot water for University of Toronto's new Athletic Complex.
Oct 7, 2009 · 55 HARBORD ST - Building permit07 251243Closed - Dormant
HVAC - Interior alterations to existing coffee shop 'Starbucks'
Sep 5, 2007 · 55 HARBORD ST - Building permit98 015708Closed
HVAC ALTERATIONS ON BASEMENT LEVEL. REFER TO APPLICATION NUMBER: 411292
Jun 2, 1998 · 55 HARBORD ST - Building permit98 015707Closed
MAKE INTERIOR ALTERATIONS IN BASEMENT LOCKER AREA AND CHANGE ROOMS. BP
Jun 2, 1998 · 55 HARBORD ST - Zoning review91 026400 LTOClosedMay 2, 1991 · 55 HARBORD ST
Check before you build
Zoning not in By-law 569-2013
Needs a closer lookThis lot is not covered by the citywide zoning by-law's map. It is probably still governed by a former municipal by-law, which this tool does not read yet.
Zoning By-law 569-2013
Lot facts
- Area
- 7,676 m²
- Frontage
- 93.2 m
- Depth
- 82.4 m
- Street
- Harbord St
- Corner lot
- No
- Public lane
- None
- House footprint
- 5,394 m²roof up to 26.8 m
- Back yard
- 4.5 mhouse to rear lot line
- Side yards
- 2.8 m and 10.1 mhouse to side lot lines
- Buildings on the lot
- 6house, garage, sheds
- Max height
- —
- Max lot coverage
- —
House and yards are measured from the City's 3D Massing footprints, which are for illustration; a survey gives the exact figures.
- 20 City trees in front of this lot. The City's street tree inventory lists 20 trees at this address: maple, norway (40 cm), ash, green (26 cm), ash, green (25 cm). Diameter is the trunk at breast height. Source
Around this lot
- Minor variances approved
- 89%24 of 27 decisions
- Garden suite permits
- 1
- Laneway suite permits
- 5
- Multiplex permits
- 6
- Development applications
- 7
Within 300 m, last 10 years. 12 suite and multiplex permits: more than at 78% of Toronto houses (median 3). 27 variance decisions: more than at 59% of Toronto houses (median 19).
Recent variance decisions in the same zone
- Minor varianceRefused
To construct a new rear two-storey detached ancillary building containing a one-car garage on the first level and storage space on the second level, abutting Albert Jackson Laneway. The existing rear one-storey detached ancillary building (garage) will be demolished.
110 BRUNSWICK AVE · Aug 12, 2026 · 429 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey detached dwelling by constructing a rear third-storey addition with a rear third floor balcony. Also, to construct side (north) exterior stairs from grade connecting to the rear (west) second storey roof deck. There will be a total of three residential dwelling units on this lot (one unit occupying the basement, one unit occupying the rear (west) portion of the second floor and one unit occupying the ground floor, the front (east) portion of the second floor and the third floor).
70 BRUNSWICK AVE · May 13, 2026 · 493 m away - Minor varianceApproved
To alter the existing two-and-one-half-storey semi-detached dwelling by constructing a rear second storey addition with a balcony above the existing rear one-storey portion of the dwelling. Also, to permit the existing habitable space within the attic, which was converted without an authorized building permit.
240 MAJOR ST · May 13, 2026 · 422 m away - Minor varianceApproved
To alter the existing three-storey semi-detached dwelling by constructing a two-storey addition (including a basement level) to a portion of the rear south wall. Also, to construct a rear second storey addition (enclosing the balcony into habitable space), and a rear third storey addition with a balcony. The existing one-storey ancillary building (detached garage, in the rear yard, abutting the laneway) will be maintained and unaltered.
147 MAJOR ST · Apr 1, 2026 · 283 m away - Minor varianceRefused
To construct a new two-storey ancillary building (detached garage containing one parking space on the ground level and storage space on the second storey) in the rear yard, abutting the public laneway. The existing two-and-one-half-storey detached main dwelling will be maintained and unaltered.
53 BRUNSWICK AVE · Mar 18, 2026 · 485 m away
Latest activity nearby
- Zoning review
Not Started
700 SPADINA AVE · Nov 24, 2026 · 273 m away - Zoning review
Application On Hold
356 HURON ST · Nov 12, 2026 · 140 m away - Building permit
Proposal for the replacment of three (3) air handling units and one (1) cooling tower
80 ST GEORGE ST · Nov 10, 2026 · 281 m away - Building permit
REV : Proposed revision include coordinated revised drawings of laboratory, classroom, office and lounge spaces to reflect minor modifications required due to numerous site conditions found during construction at the existing university building. Proposal for interior building alterations - demolition. Removal of non-structural partitions, casework, finishes, mechanical ducting, plumbing, electrical in preparation for new work
25 HARBORD ST · Nov 3, 2026 · 200 m away - Building permit
Proposed 3 storey entrance Addition to north elevation of existing Bissell Building. Addition to contain new accessible at-grade primary entrance, academic and office programed spaces and a new roof terrace. Scope of work includes renovations and alterations to existing Bissell Building levels 1 to 4 including new window openings at the ground level. The Project will also include landscaping.
130-140 ST GEORGE ST · Nov 2, 2026 · 249 m away - Building permit
Proposal to replace existing fire pump
140 ST GEORGE ST · Oct 29, 2026 · 289 m away - Building permit
Proposal for existing fire-pump replacement
120 ST GEORGE ST · Oct 29, 2026 · 226 m away - Building permit
Proposal for existing fire-pump replacement, replacement of all existing hose valves in every existing fire hose cabinet.
130 ST GEORGE ST · Oct 29, 2026 · 249 m away - Minor variancePending
To alter the development standards for the eight-storey residential apartment building (approved under Site Specific Zoning By-Laws 879-2009(OMB) and 880-2009(OMB)), increasing the height (from 25.5 m to 26.1 m), and reducing the rear projection (at the rear of the building at levels three to eight). A Site Plan Control application (File Number 20 20 162492 STE 11 SA) is currently under review. There will be a total of 16 residential dwelling units within the apartment building on this lot.
15 GLEN MORRIS ST · Oct 21, 2026 · 127 m away - Building permit
Proposal for fire protection sprinkler system alteration.
110 ST GEORGE ST · Oct 21, 2026 · 217 m away
Neighbourhood: University
About the area around the lot, not the lot itself.
- Nearest station
- St George Station10 min walk
- Nearest TTC stop
- Spadina Ave at Harbord St South Side1 min walk
- Nearest cycling route
- Harbord StCycle Track, 1 min walk
- Nearest traffic count
- 21,266 vehicles in 14 hSpadina Ave / Harbord St, 80 m away, Oct 15, 2025
- Serious collisions within 500 m
- 22021–2026, killed or seriously injured: 0 fatal, 0 with pedestrians, 2 with cyclists
- Parks
- Huron - Washington Parkette6 min walk
- Matt Cohen Park6 min walk
- Sally Bird Park7 min walk
Schools within 1 km
- SCHOOL OF GRADUATE STUDIES - U OF T, BLDG 43 University 5 min walk
- ROTMAN SCHOOL OF MANAGEMENT - U OF T, BLDG 134 University 6 min walk
- LORD LANSDOWNE JR SR & DA VINCI English Public 7 min walk
- UNIVERSITY OF TORONTO SCHOOLS Private 7 min walk
- MUNK SCHOOL OF GLOBAL AFFAIRS AT TRINITY - U OF T, BLDG 12A University 7 min walk
- MUNK SCHOOL OF GLOBAL AFFAIRS GRAHAM LIBRARY - U OF T, BLDG 12C University 7 min walk
Being near a school does not mean the lot is in its catchment; check with the board.
2021 Census
| Figure | University | Median neighbourhood |
|---|---|---|
| Median household income (2020) | $80,000 | $84,500 |
| Households that own their home | 39% | 54% |
| Population (2021) | 6,435 | 16,813 |
| Homes built in 1960 or before | 59% | 29% |
| Homes needing major repairs | 11% | 7% |
Statistics Canada 2021 Census, 25% sample, by City of Toronto neighbourhood.
Police-reported crime, 2025
| Per 100,000 people | University | City median |
|---|---|---|
| Assault | 1740.5 | 636.3 |
| Robbery | 133.9 | 69.5 |
| Homicide | 12.2 | 5.3 |
| Auto theft | 182.6 | 192.6 |
| Theft over $5,000 | 121.7 | 46.1 |
| Break and enter | 730.3 | 172.8 |
| Theft from vehicles | 353 | 188.1 |
Neighbourhood totals from the Toronto Police Service. Rates are per resident, so areas with many visitors and few residents read high.